Home / Browse projects / Pune, Maharashtra / ASHIRWAD SAMRUDDHI
ASHIRWAD SAMRUDDHI
RG-MH-57615 · RERA P52100015505 · Last updated on MahaRERA portal: 17 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 6 complaints at MahaRERA
- Completion date moved by 66 months
- 4 extensions taken
Clear
- No litigation declared
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
ASHIRWAD SAMRUDDHI is a Residential / Group Housing project by ASHIRWAD ASSOCIATES in Pune, Maharashtra, registered with MahaRERA as P52100015505 on 7 Mar 2018. Possession is promised by 14 Dec 2026. The completion date has moved by 66 months from the original filing. 10 of the 20 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete. 6 complaints are on record with the regulator.
At a glance
Project
- NameASHIRWAD SAMRUDDHI
- TypeResidential / Group Housing
- Location
- PADMAWATINAGAR
- WADMUKHWADI
- Pimpri Chinchawad (M Corp.)
- Haveli
- Pune
- 412105
- Pincode412105
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100015505
- ReraGenie IDRG-MH-57615
Builder
- NameASHIRWAD ASSOCIATES
- Entity typePartnership
- PartnerGIRISH DHANRAJ BHATEWARA
- PartnerNITIN RATNAKAR NAVGIRE
- Other registrations1 more →
- Completed1 of 2
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on7 Mar 2018
- Promised completion14 Dec 2026
- Revised completionRevised to 14 Dec 2026 (originally 30 Jun 2021)
- Buildings1 building record
- Documents filed118 files
Current status
Figures as on 17 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| ASHIRWAD SAMRUDDHI | NA | 6 | 5 | 20 | 0 | 20 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 17 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
ASHIRWAD SAMRUDDHI: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 17 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | No | Not applicable |
| Sewerage (Chamber, Lines, Septic Tank , STP) | No | Not applicable |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| ASHIRWAD SAMRUDDHI | NA | Rs 1.69 cr | Rs 1.69 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Sudesh Kulange |
| Engineer | R K RANDHAVE |
| Engineer | ALN ENGINEERS & ASSOCIATES |
| Chartered Accountant | PGMJ & ASSOCIATES |
| Chartered Accountant | NITISH VAIDYA & ASSOCIATES |
| Partner | Role in project |
|---|---|
| ASHIRWAD ASSOCIATES | - |
Extensions applied for4
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterCovid-19 pandemic and non availability of workers.
Reason as filed by the promoterDUE TO COVID AND NON AVAILABILITY OF WORKERS.
Reason as filed by the promoterDue to non availability of labour and resources.
Reason as filed by the promoterDue to non-availability of labour and other resources
Complaints filed with MahaRERA6
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000023172 | RAVINDRA SADASHIV RANE | ASHIRWAD ASSOCIATES | 01/07/2019 |
| CC005000000023173 | RAJU MORESHWAR MUDHOL | ASHIRWAD ASSOCIATES | 01/07/2019 |
| CC005000000095917 | MANISH RAMANLAL DUDHEDIYA | m/s ashirwad associates through its partner mr nitin ratnakar navgire | 23/08/2021 |
| CC005000000095923 | MANISH RAMANLAL DUDHEDIYA | m/s ashirwad associates through its partner mr nitin ratnakar navgire | 24/08/2021 |
| CC005000000095924 | kripa anand rishi cellular pvt ltd through director mr manish ramanlal dudhedia | m/s ashirwad associates through its partner mr nitin ratnakar navgire | 24/08/2021 |
| CC12600660 | ASHIRWAD ASSOCIATES | Mrs Kavita Sachin Gilbile | 04/02/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 14 Feb 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 14 Feb 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 14 Feb 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 14 Feb 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 14 Dec 2026
Documents filed118
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 118 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1.pdf | 17 Apr 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 17 Apr 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 17 Apr 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 16 Jan 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 16 Jan 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 16 Jan 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 16 Oct 2025 |
| Withdrawal Update Form 2File: Form 2_compressed.pdf | 16 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 Final.pdf | 16 Oct 2025 |
| Withdrawal Update Form 1File: Form 1.pdf | 11 Oct 2025 |
| Withdrawal Update Form 2File: Form 2.pdf | 11 Oct 2025 |
| Withdrawal Update Form 3File: Form 3.pdf | 11 Oct 2025 |
| Form 1File: Form 1 Final.pdf | 18 Jul 2025 |
| Form 2File: Form 2 Final PS_compressed.pdf | 18 Jul 2025 |
| Form 3File: Form 3 Final_compressed.pdf | 18 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Circular Final.pdf | 18 Jul 2025 |
| Certificates of CA (Form 3)File: Form 3 Final_compressed.pdf | 17 May 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Final.pdf | 18 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3 Final_compressed.pdf | 18 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Final PS_compressed.pdf | 18 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Circular 29.pdf | 18 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf | 4 Feb 2025 |
| Certificates of CA (Form 3)File: Form 3 CA.pdf | 4 Feb 2025 |
| Certificates of CA (Form 3)File: Form 3.pdf | 4 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf | 4 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Circular 29.pdf | 4 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Circular 29.pdf | 4 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf | 14 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Final.pdf | 11 Dec 2024 |
| Declaration in FORM BFile: Form B promoter_compressed.pdf | 6 Dec 2024 |
| Certificates of CA (Form 3)File: Final Form 3.pdf | 20 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Circular 29.pdf | 20 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf | 19 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf | 19 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Circular 29.pdf | 19 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf | 13 Aug 2024 |
| Certificates of CA (Form 3)File: Form 3 uPLOAD.pdf | 13 Aug 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf | 20 Jul 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate Upload.pdf | 17 Apr 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf | 17 Apr 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf | 17 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Circular 29.pdf | 17 Apr 2024 |
| Certificates of CA (Form 3)File: Form 3 Upload.pdf | 17 Apr 2024 |
| Certificates of CA (Form 3)File: Form 3 Upload.pdf | 8 Jan 2024 |
| Certificates of CA (Form 3)File: Form-3.pdf | 8 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf | 6 Jan 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Upload.pdf | 6 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Circular 29.pdf | 6 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2A 21-22.pdf | 4 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2A 22-23.pdf | 4 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form 2a.pdf | 2 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Final.pdf | 27 Dec 2023 |
| Declaration in FORM BFile: Form b.pdf | 23 Dec 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1.pdf | 21 Dec 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1.pdf | 21 Dec 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf | 21 Dec 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf | 21 Dec 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2.pdf | 21 Dec 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2.pdf | 21 Dec 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf | 21 Dec 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_11zon.pdf | 21 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: 31-12-22.pdf | 21 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: 31-3-23.pdf | 21 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: 30-6-23.pdf | 21 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: 30-9-23.pdf | 21 Dec 2023 |
| Certificates of CA (Form 3)File: signed form-3.pdf | 21 Dec 2023 |
| Certificates of CA (Form 3)File: Form 3 Q4 (22-23)11zon.pdf | 21 Dec 2023 |
| Certificates of CA (Form 3)File: Form 3 Signed.pdf | 21 Dec 2023 |
| Certificates of CA (Form 3)File: Form 3 Signed.pdf | 21 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5_Signed.pdf | 26 Dec 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A.pdf | 9 Nov 2022 |
| Disclosure of sold/ booked inventoryFile: circular 29.pdf | 9 Nov 2022 |
| CERSAI detailsFile: CERSAI_Search_Report_200251745963_For_Asset_Based_Search_09_11_2022_18_06_00_108.pdf | 9 Nov 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf | 27 Oct 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf | 27 Oct 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A.pdf | 27 Oct 2022 |
| Certificates of CA (Form 3)File: Form 3_Signed.pdf | 27 Oct 2022 |
| Certificates of CA (Form 3)File: Form 3 Singned_Final.pdf | 14 Jun 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_compressed.pdf | 14 Apr 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_compressed.pdf | 14 Apr 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 118 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep ASHIRWAD SAMRUDDHI on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near WADMUKHWADI13,700+ in Pune
Filed coordinates, straight-line distance. 70 registered projects within 2 km.
TANISH PARK
TANISH DEVELOPERS
Ajinkya Towers
APAK Bussiness Innovation Pvt Ltd
SILVER GARDENIA
SILVER PROMOTERS AND DEVELOPERS
Mangalam Life Park
Mangalam Buildcorp
SingaPune Ph 3
Xrbia Mirth Properties LLP
SingaPune Ph 2
Xrbia Mirth Properties LLP
Builder: ASHIRWAD ASSOCIATES
Ashirwad Associates has 2 registrations on MahaRERA, including Ashirwad The Living B Wing and ASHIRWAD SAMRUDDHI. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if ASHIRWAD SAMRUDDHI is delayed beyond 14 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of ASHIRWAD SAMRUDDHI?
The registered promoter entity is ASHIRWAD ASSOCIATES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in ASHIRWAD SAMRUDDHI?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against ASHIRWAD SAMRUDDHI?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for ASHIRWAD SAMRUDDHI?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at ASHIRWAD SAMRUDDHI?
The professionals named in the filing: Architect: Sudesh Kulange; Engineer: R K RANDHAVE; Engineer: ALN ENGINEERS & ASSOCIATES; Chartered Accountant: PGMJ & ASSOCIATES; Chartered Accountant: NITISH VAIDYA & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ASHIRWAD SAMRUDDHI?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback