Ashanand Residency G Building
RG-MH-04640 · RERA P52100019866 · Last updated on MahaRERA portal: 9 Oct 2024
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 2 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Ashanand Residency G Building is a Commercial project by Anand Deoram Tambe in Pune, Maharashtra, registered with MahaRERA as P52100019866 on 7 Mar 2019. The registration is recorded completed; possession was promised by 30 Dec 2024.
At a glance
Project
- NameAshanand Residency G Building
- TypeCommercial
- Location
- 276/1/A
- Rajgurunagar
- Taluka Khed
- DIst. Pune
- Khed
- Rajgurunagar (CT)
- Pune
- 410505
- Pincode410505
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100019866
- ReraGenie IDRG-MH-04640
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on7 Mar 2019
- Promised completion30 Dec 2024
- Revised completionNone
- Buildings1 building record
- Documents filed80 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Ashanand Residecny G Building | NA | 5 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 9 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
2 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 60%.
Ashanand Residecny G Building: 31% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 60% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 40% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 40% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 9 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 60% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 80% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 80% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 40% |
| Fire protection and fire safety requirements | Yes | 70% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 40% |
| Open Parking | No | Not applicable |
Parking filed20
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Mr. Deepak Honkan |
| Engineer | Mr. Chandrakant Gajendra Gokhale |
| Chartered Accountant | Narayan Sarda |
| Partner | Role in project |
|---|---|
| Anand Deoram Tambe | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 1 Mar 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 1 Mar 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 1 Mar 2019 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 1 Mar 2019Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 16 Apr 2024
Documents filed80
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Annual Audit Report of Statutory CA (Form 5) (FY 2023-24).pdf | 9 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Annual Audit Report of Statutory CA (Form 5) (FY 2023-24).pdf | 9 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Annual Audit Report of Statutory CA (Form 5) (FY 2023-24).pdf | 9 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Annual Audit Report of Statutory CA (Form 5) (FY 2023-24).pdf | 9 Oct 2024 |
| Certificates of CA (Form 3)File: Certificates of CA (Form 3).pdf | 26 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory.pdf | 4 May 2024 |
| Certificates of CA (Form 3)File: Certificates of CA (Form 3).pdf | 30 Apr 2024 |
| Certificates of CA (Form 3)File: Certificates of CA (Form 3).pdf | 30 Apr 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: Architect’s Certificate on Completion of Project (Form 4).pdf | 26 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate of Completion of Work (Form 1).pdf | 16 Apr 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate -Form 2.pdf | 16 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineer's Quality Certificate-Form 2A.pdf | 16 Apr 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certificate .pdf | 16 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate of Completion of Work (Form 1).pdf | 16 Dec 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate -Form 2.pdf | 16 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineer's Quality Certificate-Form 2A.pdf | 16 Dec 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: PART OCCUPANCY CERTIFICATE.pdf | 16 Dec 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: PART OCCUPANCY CERTIFICATE -2.pdf | 16 Dec 2023 |
| Certificates of CA (Form 3)File: Certificates of CA (Form 3).pdf | 8 Nov 2023 |
| Certificates of CA (Form 3)File: Certificates of CA (Form 3).pdf | 19 Oct 2023 |
| Certificates of CA (Form 3)File: Certificates of CA (Form 3).pdf | 19 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Annual Audit Report of Statutory CA (Form 5) (FY 2022-23).pdf | 19 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate of Completion of Work (Form 1).pdf | 17 Sep 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate -Form 2.pdf | 17 Sep 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineer's Quality Certificate-Form 2A.pdf | 17 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate of Completion of Work (Form 1).pdf | 15 Jul 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate -Form 2.pdf | 15 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Engineer's Quality Certificate-Form 2A.pdf | 15 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate of Completion of work-Form 1.pdf | 1 Jul 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Certificate of Engineer-form 2.pdf | 1 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineer Certificate of Quality Assurance (Form 2A).pdf | 1 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sept 21-Form 1-G.pdf | 24 Mar 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: G-Form 2-June 21.pdf | 24 Mar 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: G-Form 2-Sept 21.pdf | 24 Mar 2023 |
| Certificates of CA (Form 3)File: G FORM 3_June-21.pdf | 24 Mar 2023 |
| Certificates of CA (Form 3)File: G FORM 3_Sept-21.pdf | 24 Mar 2023 |
| Certificates of CA (Form 3)File: G FORM 3_Dec2021.pdf | 24 Mar 2023 |
| Certificates of CA (Form 3)File: G FORM 3_Dec2022.pdf | 24 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: G-Form 5-FY 18-19.pdf | 24 Mar 2023 |
| Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to Legal-Ashanand Residecny G Building.pdf | 11 Mar 2023 |
| Details of encumbrances concerned to LegalFile: Details of encumbrances concerned to Legal-Ashanand Residecny G Building.pdf | 11 Mar 2023 |
| Declaration about Commencement CertificateFile: Form D-Ashanand Residecny G Building.pdf | 11 Mar 2023 |
| Proforma of Allotment letterFile: Allotment Letter-Ashanand Residecny G Building.pdf | 11 Mar 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank Account Declaration-Ashanand Residecny G Building.pdf | 11 Mar 2023 |
| Deviation Report with respect to Allotment letterFile: Deviation of Allotment Letter-Ashanand Residecny G Building.pdf | 11 Mar 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviation for AFS-Ashanand Residecny G Building.pdf | 11 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: G Bldg_Form 5_FY 19-20.pdf | 30 Jan 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2-G-Building engineer certificate.pdf | 25 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: G-Building Engineering certificate (2021-22).pdf | 24 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Certificate for G-20-21.pdf | 20 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Certificate for G-21-22.pdf | 20 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect’s Certificate of Percentage of Completion of Work.pdf | 2 Oct 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Certificates of Engineer (Form 2).pdf | 2 Oct 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about Separate Bank A_C.pdf | 23 Sep 2022 |
| CERSAI detailsFile: CERSAI Declaration .pdf | 10 Sep 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERT G BLDG.pdf | 21 May 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate G.pdf | 21 May 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Er Cerificate QUALITY G Bldg.pdf | 21 May 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ER Certificate G BLD.pdf | 21 May 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 ENgineer G.pdf | 21 May 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 ER G bldg.pdf | 21 May 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Er Cerificate QUALITY G Bldg.pdf | 21 May 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Engineer G.pdf | 21 May 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: G Architect Certificate.pdf | 15 Sep 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: G Building Engineer Certificate.pdf | 15 Sep 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: G bldg Arch Certificate.pdf | 7 Mar 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: G Er Certificate.pdf | 7 Mar 2020 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: G Er Quality Certificate.pdf | 7 Mar 2020 |
| Building plan approvalFile: Project layout.pdf | 1 Mar 2019 |
| Layout approvalFile: G Layout.pdf | 1 Mar 2019 |
| PAN CardFile: Pan Card.pdf | 1 Mar 2019 |
| Copy of the legal title reportFile: Title Search Report (2).pdf | 1 Mar 2019 |
| Details of encumbrancesFile: Encumbrances.pdf | 1 Mar 2019 |
| Copy of Layout Approval (in case of layout)File: G Layout.pdf | 1 Mar 2019 |
| Building Plan Approval (IOD)File: Project layout.pdf | 1 Mar 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: CC Copy.pdf | 1 Mar 2019 |
| Declaration in FORM BFile: Form B-Affidavit.pdf | 1 Mar 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: G Building Engineer Certificate.pdf | 1 Mar 2019 |
| Certificates of CA (Form 3)File: G Building CA Certificate.pdf | 1 Mar 2019 |
| Proforma of Allotment letterFile: G Building Allotment Letter and Agreement to Sale.pdf | 1 Mar 2019 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Ashanand Residency - Building B | Survey No 276 1 A Rajgurunagar Khed Pune 410505 | 56 | Completed | May 2017 | May 2017 |
| Ashananda Residency - Building A | S No 276 1 A At Rajgurunagar Tal Khed Dist Pune | 56 | Completed | Apr 2017 | Apr 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 3 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 80 filed documents as one ZIP, foldered, with a manifest
Keep Ashanand Residency G Building on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Khed13,700+ in Pune
Filed coordinates, straight-line distance. 433 registered projects within 2 km.
First City
Xrbia Developers Ltd
SURAJ EKYUM
SURAJ INFRA
Shankeshwar World
Nitin Chhaganlal Jain
Escape City Ph 1
Gajendra Patil , Pramod Patil , Vinod Pati
YESAI PARK
SIDDHIVINAYAK DEVELOPERS
Escape City Ph 2
Gajendra Patil , Pramod Patil , Vinod Pati
Builder: Anand Deoram Tambe
Anand Deoram Tambe has 4 registrations on MahaRERA, including Ashanand Residency C building and Ashanand Residency F Buidling. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Ashanand Residency G Building is delayed beyond 30 Dec 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Ashanand Residency G Building?
The registered promoter entity is Anand Deoram Tambe, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Ashanand Residency G Building?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Ashanand Residency G Building?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Ashanand Residency G Building?
The professionals named in the filing: Architect: Mr. Deepak Honkan; Engineer: Mr. Chandrakant Gajendra Gokhale; Chartered Accountant: Narayan Sarda. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Ashanand Residency G Building?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback