ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / ASCENT FORTUNE PHASE 1

Registered No litigation declared Others project

ASCENT FORTUNE PHASE 1

By ASCENT REALTY

RG-MH-29724 · RERA P52000028967 · Last updated on MahaRERA portal: 28 Jan 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 48 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 48 months from the original
4 of 22Construction stages doneacross 2 buildings; furthest along: Staircases, 80%
119 of 173Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 57 documents Report an error

ASCENT FORTUNE PHASE 1 is a Others project by ASCENT REALTY in Raigarh, Maharashtra, registered with MahaRERA as P52000028967 on 15 Apr 2021. Possession is promised by 31 Dec 2027. The completion date has moved by 48 months from the original filing. 54 of the 173 units on this registration are recorded sold or booked, and 4 of 22 construction stages are filed complete.

At a glance

Project

  • NameASCENT FORTUNE PHASE 1
  • TypeOthers
  • Location
    • NA
    • DAHIVALI TARFE NEED
    • Karjat
    • Raigarh
    • 410201
  • Pincode410201
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000028967
  • ReraGenie IDRG-MH-29724

Builder

  • NameASCENT REALTY
  • Entity typePartnership
  • PartnersATIF ISLAM, JOHNNY ANTHONY JOSEPH, SUNIL BENIBAHADUR YADAV
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredApr 2021First promiseDec 2023Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Apr 2021
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 31 Dec 2023)
  • Buildings2 building records
  • Documents filed57 files

Current status

31%54 of 173 units booked
35.0%Work done, per cost certificate

Figures as on 28 Jan 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PEARLNA1110582381
EMREALDNA1110672592

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 28 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Staircases, at 80%.

PEARL0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
EMREALD54%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises45%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 28 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes50%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed106

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots106
Closed/Covered1
Open Space105
BuildingClosed/CoveredOpen SpaceTotal
PEARL15051
EMREALD05555

Land and ownership5

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,340 sq m
Land owned byThe promoter, with other names on the file
Named landowners5
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on23 Dec 2025
LandownerVillageDistrict
PARVATI ATMARAM GAIKWADKarjatRaigarh
ASHOK ATMARAM GAIKWADKarjatRaigarh
RAMDAS ATMARAM GAIKWADKarjatRaigarh
PRADEEP ATMARAM GAIKWADKarjatRaigarh
NITIN ATMARAM GAIKWADKarjatRaigarh

Approvals and building plan

Sanctioning authorityKarjat Municipal Council
Permissible FSI7925.31
Proposed, not sanctioned7,925 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKARJAT
Estimated costRs 14.62 cr
Cost incurredRs 5.12 cr
Work done35.01%
BuildingWingEstimatedIncurred
PEARLNARs 6.20 crRs 2.23 cr
EMREALDNARs 6.20 crRs 2.23 cr
-NARs 2.23 crRs 66.61 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAR PRAVIN KAMBLE
EngineerSHISHIR DHAWADE SHISHIR DHAWADE
EngineerDINESH SHENDE
Chartered AccountantCA VINIT JAIN
Chartered AccountantDHANDEKAR METHWANI & Co.
PartnerRole in project
ASCENT REALTY-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000018329Dec 2023 → Dec 2025

Reason as filed by the promoterExplanatory note regarding the state of development works in the projects and reason for being not completing development works of the projects within the period declared in the declaration submitted in FORM ‘B’ at the time of making the application for the registration of ASCENT FORTUNE PHASE 1’ - As per the details mentioned at the time of registration of the project at the MahaRERA Website we had mentioned 31ST DECEMBER 2023 as the project completion date, we will not be able to complete the project due to various unavoidable reasons. Such as 1) After the impact of the pandemic, the increas

EA24122518962Dec 2023 → Dec 2027

Reason as filed by the promoterShortage of Funds due to low demand: The real estate project, situated in a remote area, has faced significant challenges due to limited customer bookings, resulting in a lower-than-anticipated response from prospective buyers. This lack of adequate buyer interest adversely impacted the financial inflow required for the timely completion of the project, as the anticipated funding from customer bookings could not be realized. Despite these challenges, the promoters have demonstrated unwavering commitment to the project's completion by arranging the necessary funds through the liquidation of per

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Apr 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Apr 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Apr 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Apr 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed57

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1_ DEC 25_ ASCENT REALTY.pdf28 Jan 2026
Withdrawal Update Form 2File: FORM 2_ DEC 25_ ASCENT REALTY.pdf28 Jan 2026
Withdrawal Update Form 3File: FORM 3_ DEC 25_ ASCENT REALTY.pdf28 Jan 2026
Form 1File: FORM 1_DEC 24_ ASCENT FORTUNE.pdf23 Dec 2025
Form 2File: FORM 2_DEC 24_ ASCENT FORTUNE.pdf23 Dec 2025
Form 3File: FORM 3_DEC 24_ ASCENT FORTUNE.pdf23 Dec 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD_DEC 24_ ASCENT FORTUNE.pdf23 Dec 2025
Form 1File: FORM 1_MARCH 25_ ASCENT FORTUNE.pdf23 Dec 2025
Form 2File: FORM 2_MARCH 25_ ASCENT FORTUNE.pdf23 Dec 2025
Form 3File: FORM 3_MARCH 25_ ASCENT FORTUNE.pdf23 Dec 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD_MARCH 25_ ASCENT FORTUNE.pdf23 Dec 2025
Form 1File: FORM 1_JUNE 25_ ASCENT FORTUNE.pdf23 Dec 2025
Form 2File: FORM 2_JUNE 25_ ASCENT FORTUNE.pdf23 Dec 2025
Form 3File: FORM 3_JUNE 25_ ASCENT FORTUNE.pdf23 Dec 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD_JUNE 25_ ASCENT FORTUNE.pdf23 Dec 2025
Form 1File: FORM 1_SEP 25_ ASCENT FORTUNE.pdf23 Dec 2025
Form 2File: FORM 2_SEP 25_ ASCENT FORTUNE.pdf23 Dec 2025
Form 3File: FORM 3_SEP 25_ ASCENT FORTUNE.pdf23 Dec 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD_SEP 25_ ASCENT FORTUNE.pdf23 Dec 2025
Form 2A (FY 2023-2024)File: FORM 2A Quality Control - FY - 2023-2024.pdf23 Dec 2025
Form 2A (FY 2024-2025)File: FORM 2A_ MARCH 25_ ASCENT FOURTUNE.pdf23 Dec 2025
Form 5 (FY 2023-2024)File: FORM 5 _23-24 ASCENT FORTUNE.pdf23 Dec 2025
Form 5 (FY 2024-2025)File: FORM 5 _24-25 ASCENT FORTUNE.pdf23 Dec 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM -5 2022.pdf28 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 2023.pdf28 Dec 2023
Declaration in FORM BFile: FORM B_compressed.pdf21 Dec 2023
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf21 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FPRM 3 ATIF.pdf21 Dec 2023
Declaration about Commencement CertificateFile: CC DECLARATION.pdf20 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1- ASCENT FORTUNE PHASE 1_SEP 23.pdf20 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2- ASCENT FORTUNE PHASE 1_SEP 23.pdf20 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A Quality Control - FY - 2021-2022.pdf20 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A Quality Control - FY - 2022-2023.pdf20 Dec 2023
CERSAI detailsFile: CERSAI.pdf20 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3- ASCENT FORTUNE PHASE 1_SEP 23.pdf20 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-ASCENT FORTUNE_MAR 23.pdf1 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-ASCENT FORTUNE_MAR 23.pdf1 Jun 2023
Disclosure of sold/ booked inventoryFile: SOLD BOOKED-ASCENT FORTUNE_MAR 23.pdf1 Jun 2023
Proforma of Allotment letterFile: AGREEMENT FOR SALE - SAMPLE - FLAT.pdf21 Jun 2022
Disclosure of sold/ booked inventoryFile: Wing A - RERA - 21062021.pdf24 Jun 2021
Disclosure of sold/ booked inventoryFile: Wing B - RERA 21062021.pdf24 Jun 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_compressed.pdf8 Apr 2021
Proforma of Allotment letterFile: AGREEMENT FOR SALE.pdf8 Apr 2021
Layout approvalFile: Sheet 1-4.PDF1 Apr 2021
Building plan approvalFile: Sheet 2-4.PDF1 Apr 2021
Building plan approvalFile: Sheet 3-4.PDF1 Apr 2021
Building plan approvalFile: Sheet 4-4.PDF1 Apr 2021
PAN CardFile: PAN.pdf1 Apr 2021
Copy of the legal title reportFile: Title Report RERA.pdf1 Apr 2021
Details of encumbrancesFile: Encumberances.pdf1 Apr 2021
Copy of Layout Approval (in case of layout)File: Sheet 1-4.PDF1 Apr 2021
Building Plan Approval / NA Order for plotted developmentFile: Sheet 2-4.PDF1 Apr 2021
Building Plan Approval / NA Order for plotted developmentFile: Sheet 3-4.PDF1 Apr 2021
Building Plan Approval / NA Order for plotted developmentFile: Sheet 4-4.PDF1 Apr 2021
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf1 Apr 2021
Declaration in FORM BFile: FORM B PROMOTER.pdf1 Apr 2021
Proforma of Allotment letterFile: ALLOTMENT.pdf1 Apr 2021

How this compares with Raigarh

31%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 48 months
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ASCENT FORTUNE PHASE 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DAHIVALI TARFE NEED5,900+ in Raigarh

2 kmASCENT FORTUNE PHASE 1Completed 1Lapsed / revoked 1Other 3Dot size: filed unitsN

Filed coordinates, straight-line distance. 5 registered projects within 2 km.

Builder: ASCENT REALTY

ASCENT REALTY has 2 registrations on MahaRERA, including ELITE EVOQ and ASCENT FORTUNE PHASE 1. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if ASCENT FORTUNE PHASE 1 is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ASCENT FORTUNE PHASE 1?

The registered promoter entity is ASCENT REALTY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ASCENT FORTUNE PHASE 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ASCENT FORTUNE PHASE 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ASCENT FORTUNE PHASE 1?

The professionals named in the filing: Architect: AR PRAVIN KAMBLE; Engineer: SHISHIR DHAWADE SHISHIR DHAWADE; Engineer: DINESH SHENDE; Chartered Accountant: CA VINIT JAIN; Chartered Accountant: DHANDEKAR METHWANI & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ASCENT FORTUNE PHASE 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ASCENT FORTUNE PHASE 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ASCENT FORTUNE PHASE 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.