Home / Browse projects / Pune, Maharashtra / ASAMANT RESIDENCY
ASAMANT RESIDENCY
By ROOFONE CD ASAMANT BUILDCON LLP
RG-MH-90739 · RERA P52100053335 · Last updated on MahaRERA portal: 20 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
ASAMANT RESIDENCY is a Residential / Group Housing project by ROOFONE CD ASAMANT BUILDCON LLP in Pune, Maharashtra, registered with MahaRERA as P52100053335 on 27 Oct 2023. Possession is promised by 31 Dec 2026. 14 of the 28 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.
At a glance
Project
- NameASAMANT RESIDENCY
- TypeResidential / Group Housing
- Location
- Charholi Bk.
- CHARHOLI
- Haveli
- Pune
- 412105
- Pincode412105
- RERA no.P52100053335
- ReraGenie IDRG-MH-90739
Builder
- NameROOFONE CD ASAMANT BUILDCON LLP
- Entity typeOthers
- Named personsAMOL GORAKH SABALE, MAHESH GANGARAM PARTE, CHANDRAKANT NAGNATHRAO DESHMUKH
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on27 Oct 2023
- Promised completion31 Dec 2026
- Revised completionNone
- Buildings1 building record
- Documents filed71 files
Current status
Figures as on 20 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| ASAMANT RESIDENCY | NA | 5 | 5 | 28 | 0 | 28 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 90%.
ASAMANT RESIDENCY: 63% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 85% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 90% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 40% |
Progress on shared amenities15
As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 20% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | No | Not applicable |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed8
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership2
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Pradip Bhaurao Sankpal | Zaregaon | Solapur |
| Akshata Pradip Sankpal | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| ASAMANT RESIDENCY | NA | Rs 2.90 cr | Rs 2.90 cr |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Mahesh G Parte |
| Engineer | Amol G.Sabale |
| Chartered Accountant | Phule Wagh & Associates LLP |
| Partner | Role in project |
|---|---|
| ROOFONE CD ASAMANT BUILDCON LLP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 11 Oct 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 20 Apr 2026 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 18 Apr 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 20 Apr 2026Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed71
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Layout approvalFile: HPSCANNER1690 Layout.pdf | 20 Apr 2026 |
| Commencement certificateFile: S0T1000153_2510172109000.pdf | 20 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 Architect Certificate Q4.pdf | 20 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 Annexure B Engineer Certificate Q4.pdf | 20 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 Chartered Accountant Certificate 31032026 Q4.pdf | 20 Apr 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 21 Jan 2026 |
| Withdrawal Update Form 1File: Architect Certificate.pdf | 21 Jan 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 21 Jan 2026 |
| Withdrawal Update Form 2File: Engineer Certificate.pdf | 21 Jan 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 21 Jan 2026 |
| Withdrawal Update Form 3File: FORM 3 Chartered Accountant Certificate 311222025 ASAMANT RESIDENCY.pdf | 21 Jan 2026 |
| Layout approvalFile: HPSCANNER1690.pdf | 27 Oct 2025 |
| Form 1File: Architect Form Q1 FY 2025-26.pdf | 19 Jul 2025 |
| Form 2File: Engineer Form 2 Q1 FY 2025-26.pdf | 19 Jul 2025 |
| Form 3File: Form 3 5th July 2025.pdf | 19 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Q1 FY 2025-26.pdf | 19 Jul 2025 |
| Layout approvalFile: asamant Rev plan 18 3 2025_1.pdf | 18 Apr 2025 |
| Building plan approvalFile: asamant Rev plan 18 3 2025_1.pdf | 18 Apr 2025 |
| Copy of Layout Approval (in case of layout)File: asamant Rev plan 18 3 2025_1.pdf | 18 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Phule Certificate Q4.pdf | 18 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2 Engineerss Certifiate_DONE.pdf | 18 Apr 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: asamant Rev plan 18 3 2025_2CC.pdf | 18 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: asamant Rev plan 18 3 2025_1.pdf | 18 Apr 2025 |
| Declaration about Commencement CertificateFile: Format D_DONE.pdf | 18 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Form 1_DONE.pdf | 17 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Flat Sold Unsold_DONE.pdf | 17 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form -2A Certifiate.pdf | 14 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold PDF.pdf | 11 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Phule Wagh and Associate Certificate Form 3.pdf | 10 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate.pdf | 8 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2 Engineerss Certifiate.pdf | 8 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2 Engineerss Certifiate.pdf | 8 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form -2 Engineerss Certifiate.pdf | 8 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Engineer Certificate 06022023 DONE EXCEPT COST.pdf | 25 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Chartered Accountant Certificate 31032024.pdf | 25 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Chartered Accountant Certificate 31032024.pdf | 25 Apr 2024 |
| Layout approvalFile: Plan.pdf | 5 Apr 2024 |
| Copy of Layout Approval (in case of layout)File: Plan.pdf | 5 Apr 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 5 Apr 2024 |
| Declaration about Commencement CertificateFile: Formamt D.pdf | 5 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 mar 2024 scan.pdf | 5 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Q4 scan.pdf | 5 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: sold unsold declaration mar 2024.pdf | 5 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: sold unsold revised.pdf | 5 Apr 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about seperate bank account as per order 34.pdf | 13 Oct 2023 |
| Copy of the legal title reportFile: Format A.pdf | 11 Oct 2023 |
| Details of encumbrances concerned to FinanceFile: Declaration of no Encumbrance - Finance.pdf | 6 Oct 2023 |
| Details of encumbrances concerned to FinanceFile: Declaration of no Encumbrance - Legal DONE.pdf | 6 Oct 2023 |
| Details of encumbrances concerned to LegalFile: Declaration of no Encumbrance - Finance.pdf | 6 Oct 2023 |
| Details of encumbrances concerned to LegalFile: Declaration of no Encumbrance - Legal DONE.pdf | 6 Oct 2023 |
| CERSAI detailsFile: Undertaking CERSAI.pdf | 6 Oct 2023 |
| Other - FinanceFile: Pradip Sankpal Other PMC Mail.pdf | 6 Oct 2023 |
| Copy of the legal title reportFile: Format A.pdf | 3 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Chartered Accountant Certificate 14092023 (1).pdf | 3 Oct 2023 |
| Proforma of Agreement for saleFile: ROOFONE CD SABLE RERA DRAFT AGREEMENT.pdf | 3 Oct 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Decleration of separate bank account.pdf | 3 Oct 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report AFS.pdf | 3 Oct 2023 |
| Proforma of Allotment letterFile: Allotment letter as per order 31.pdf | 26 Sep 2023 |
| CERSAI detailsFile: Undertaking CERSAI.pdf | 29 Aug 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest Chndrkant Deshmukh.pdf | 29 Aug 2023 |
| Layout approvalFile: Clear Plan 28062023.pdf | 26 Aug 2023 |
| Building plan approvalFile: Clear Plan 28062023.pdf | 26 Aug 2023 |
| PAN CardFile: LLP PAN.pdf | 26 Aug 2023 |
| Copy of Layout Approval (in case of layout)File: Clear Plan 28062023.pdf | 26 Aug 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Clear Plan 28062023.pdf | 26 Aug 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 26 Aug 2023 |
| Declaration about Commencement CertificateFile: Format D Decleartion of CC.pdf | 26 Aug 2023 |
| Declaration in FORM BFile: Form B Promoter.pdf | 26 Aug 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest Amol Sabale.pdf | 26 Aug 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure Of interest Mahesh Parte.pdf | 26 Aug 2023 |
| Deviation Report with respect to Allotment letterFile: DEVIATION OF ALLOTMENT.pdf | 26 Aug 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- All 71 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep ASAMANT RESIDENCY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Charholi Bk.13,700+ in Pune
TANISH PARK
TANISH DEVELOPERS
Ajinkya Towers
APAK Bussiness Innovation Pvt Ltd
SILVER GARDENIA
SILVER PROMOTERS AND DEVELOPERS
Mangalam Life Park
Mangalam Buildcorp
SingaPune Ph 3
Xrbia Mirth Properties LLP
SingaPune Ph 2
Xrbia Mirth Properties LLP
Builder: ROOFONE CD ASAMANT BUILDCON LLP
ROOFONE CD ASAMANT BUILDCON LLP has 1 registration on MahaRERA, including ASAMANT RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if ASAMANT RESIDENCY is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of ASAMANT RESIDENCY?
The registered promoter entity is ROOFONE CD ASAMANT BUILDCON LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in ASAMANT RESIDENCY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for ASAMANT RESIDENCY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at ASAMANT RESIDENCY?
The professionals named in the filing: Architect: Mahesh G Parte; Engineer: Amol G.Sabale; Chartered Accountant: Phule Wagh & Associates LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ASAMANT RESIDENCY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.