Registered No litigation declared Residential / Group Housing project

ARYA APPARTMENT

By LAXMAN TEJRAM BABHARE

RG-MH-13441 · RERA P50600046314 · Last updated on MahaRERA portal: 17 Jun 2022

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Bhandara registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedno revision filed
1 of 11Construction stages donefurthest along: Basement (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 19 documents Report an error

ARYA APPARTMENT is a Residential / Group Housing project by LAXMAN TEJRAM BABHARE in Bhandara, Maharashtra, registered with MahaRERA as P50600046314 on 22 Jun 2022. Possession is promised by 31 Mar 2027.

At a glance

Project

  • NameARYA APPARTMENT
  • TypeResidential / Group Housing
  • Location
    • PLOT NO 1
    • GAT NO 343/1 MOUZA BELA
    • BELA
    • Bela (CT)
    • Bhandara
    • 441906
  • Pincode441906
  • RERA no.P50600046314
  • ReraGenie IDRG-MH-13441

Builder

  • NameLAXMAN TEJRAM BABHARE
  • Entity typeIndividual

Key dates

this monthRegisteredJun 2022PromisedMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 Jun 2022
  • Promised completion31 Mar 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed19 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ARYA APPARTMENTNA100000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 Jun 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

ARYA APPARTMENT: 9% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 17 Jun 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed19

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots19
Closed/Covered4
Open Space15

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area363 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
LAXMAN BABHAREBela (CT)Bhandara
MURALIDHAR TEJRAM BABHAREBela (CT)Bhandara
PRABHAKAR TEJRAM BABHAREBela (CT)Bhandara

Approvals and building plan

Permissible FSI812.0
Proposed, not sanctioned812 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHYAM BHAWAN, NEAR RAJASTHANI HALL, MAIN ROAD, BHANDARA

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDakram Bawankule
EngineerDakaram Bawankule
Chartered AccountantRakesh Daswani
PartnerRole in project
LAXMAN TEJRAM BABHARE-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Jun 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Jun 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Jun 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Jun 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed19

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form3 compre small 1.pdf17 Jun 2022
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE_compressed.pdf16 Jun 2022
Declaration about Commencement CertificateFile: commencement .pdf16 Jun 2022
CERSAI detailsFile: cersai report Arya appartment .pdf16 Jun 2022
Building plan approvalFile: SDO Permision Compressed.pdf11 Jun 2022
Building plan approvalFile: SANCTION mAP.pdf11 Jun 2022
Building Plan Approval / NA Order for plotted developmentFile: SDO Permision Compressed.pdf11 Jun 2022
Building Plan Approval / NA Order for plotted developmentFile: SANCTION mAP.pdf11 Jun 2022
Declaration in FORM BFile: Form B Laxman.pdf11 Jun 2022
Declaration in FORM BFile: Form B Murlidhar.pdf11 Jun 2022
Declaration in FORM BFile: Form B Prabhakar.pdf11 Jun 2022
Proforma of Allotment letterFile: Allotment letter.pdf11 Jun 2022
Layout approvalFile: na order 00.pdf10 Jun 2022
PAN CardFile: MURLIDHAR PAN.pdf10 Jun 2022
PAN CardFile: Laxman babhare pan.pdf10 Jun 2022
PAN CardFile: Prabhakar babhare pan (1).pdf10 Jun 2022
Copy of the legal title reportFile: Legal Search Report compressed.pdf10 Jun 2022
Details of encumbrancesFile: encumbrance .pdf10 Jun 2022
Copy of Layout Approval (in case of layout)File: na order 00.pdf10 Jun 2022

How this compares with Bhandara

22%of Bhandara projects moved their completion datethis one has not
44%of Bhandara registrations have lapsed or been cancelledthis one is on the register

Computed across the 36 Bhandara projects on ReraGenie, from their own filings.

Keep ARYA APPARTMENT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BELA36 in Bhandara

Builder: LAXMAN TEJRAM BABHARE

LAXMAN TEJRAM BABHARE has 1 registration on MahaRERA, including ARYA APPARTMENT. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Bhandara district page.

Frequently asked questions

What are my rights if ARYA APPARTMENT is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ARYA APPARTMENT?

The registered promoter entity is LAXMAN TEJRAM BABHARE, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ARYA APPARTMENT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ARYA APPARTMENT?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ARYA APPARTMENT?

The professionals named in the filing: Architect: Dakram Bawankule; Engineer: Dakaram Bawankule; Chartered Accountant: Rakesh Daswani. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ARYA APPARTMENT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ARYA APPARTMENT. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ARYA APPARTMENT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.