Home / Browse projects / Mumbai Suburban, Maharashtra / Arvind Niwas

Registration lapsed No litigation declared Others project

Arvind Niwas

By Hridyaa Infraprojects LLP

RG-MH-06315 · RERA P51800052356 · Last updated on MahaRERA portal: 30 Jun 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 4 months past the filed date
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2026Possession promised4 months past this date
8 of 11Construction stages donefurthest along: Installation of Lifts, 20%
33 of 42Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 107 documents Report an error

Arvind Niwas is a Others project by Hridyaa Infraprojects LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800052356 on 21 Aug 2023. Possession was promised by 30 Jun 2026 and is now 4 months past that date. The completion date has moved by 12 months from the original filing. 9 of the 42 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.

At a glance

Project

  • NameArvind Niwas
  • TypeOthers
  • Location
    • Kasturba Road No 05
    • Borivali East
    • Borivali
    • Mumbai Suburban
    • 400066
  • Pincode400066
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800052356
  • ReraGenie IDRG-MH-06315

Builder

  • NameHridyaa Infraprojects LLP
  • Entity typePartnership
  • GSTIN27AAPFH3760F1Z7
  • PartnersJaisukh Manasi Gala, Chandrika Jaisukh Gala

Key dates

4 months past promisethis monthRegisteredAug 2023First promiseJun 2025Revised toJun 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on21 Aug 2023
  • Promised completion30 Jun 2026
  • Revised completionRevised to 30 Jun 2026 (originally 30 Jun 2025)
  • Buildings1 building record
  • Documents filed107 files

Current status

21%9 of 42 units booked
79.6%Work done, per cost certificate

Figures as on 30 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Arvind NiwasNA111135742

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 20%.

Arvind Niwas: 75% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises5%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%

Progress on shared amenities15

As on 30 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes25%
Storm Water DrainsYes25%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes25%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes25%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed12

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots12
Closed/Covered12

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area378 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on5 Sep 2025
LandownerVillageDistrict
Arvind Niwas Co-Operative Housing Society LimitedBorivaliMumbai Suburban

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority
Permissible FSI1226.11
Proposed, not sanctioned1,226 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGF Regal Cinema Bldg Shyama Prasad SP Mukherjee Chowk Mumbai Maharashtra 400005
Estimated costRs 6.28 cr
Cost incurredRs 5.00 cr
Work done79.63%
BuildingWingEstimatedIncurred
Arvind NiwasNARs 5.75 crRs 5.00 cr
-NARs 53.00 lakh-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectArbaaz I. Khan of M/s. Sir & Sir Associates
EngineerOmkesh Umesh Chaurasia of M/s. Jay Shree Krishna Consultants
EngineerBasant H Jha
Chartered AccountantK S P M & Associates Chartered Accountants
Chartered AccountantRishit S Doshi of R S Doshi & Associates S Doshi
Chartered AccountantShyam Sojitra of Sojitra And Associates
PartnerRole in project
Hridyaa Infraprojects LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA06092502522Jun 2025 → Jun 2026

Reason as filed by the promoterWe, Hridyaa Infraprojects Llp, hereby declare the following with respect to the project “Arvind Niwas” bearing registration number P51800052356 registered under MahaRERA 1. Status of Work Completed: We are pleased to inform you that we have completed the 100% of RCC (Reinforced Cement Concrete) work for the building. Currently, we are undertaking the finishing work, which includes plastering, flooring, electrical fittings, and other essential internal and external works. 2. Expected Timeline for Completion: We are committed to completing all balance works and applying for the Occupation Certif

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Jul 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Oct 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Oct 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed107

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 107 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Sept 2025 FINAL.pdf30 Jun 2026
Withdrawal Update Form 1File: Form 1 Dec 2025 Final.pdf30 Jun 2026
Withdrawal Update Form 1File: Form 1 March 2026 Final.pdf30 Jun 2026
Withdrawal Update Form 2File: Form 2 Sept 2025 FINAL.pdf30 Jun 2026
Withdrawal Update Form 2File: Form 2 Dec 2025 Final.pdf30 Jun 2026
Withdrawal Update Form 2File: Form 2 March 2026 Final.pdf30 Jun 2026
Withdrawal Update Form 3File: Form 3 Sept 2025.pdf30 Jun 2026
Withdrawal Update Form 3File: Form 3 Dec 2025.pdf30 Jun 2026
Withdrawal Update Form 3File: Form 3 March 2026.pdf30 Jun 2026
Form 1File: From 1 Architects Certificate 03 04 2025.pdf5 Sep 2025
Form 2File: Form 2 March 2025.pdf5 Sep 2025
Form 3File: Form 3 March 25.pdf5 Sep 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 Sold-Unsold Inventory as on March 2025.pdf5 Sep 2025
Form 1File: From 1 Architects Certificate 10 01 2025.pdf5 Sep 2025
Form 2File: Form 2 Dec 2024.pdf5 Sep 2025
Form 3File: Form 3 Dec 2024.pdf5 Sep 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 Sold-Unsold Inventory as on December 2024.pdf5 Sep 2025
Form 1File: Form 1 Architects Certificate September 2024.pdf5 Sep 2025
Form 2File: Form 2 September 2024.pdf5 Sep 2025
Form 3File: Form 3 Sept 2024.pdf5 Sep 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 Sold-Unsold Inventory as on September 2024.pdf5 Sep 2025
Form 1File: Form 1 Architects Certificate June 2024.pdf5 Sep 2025
Form 2File: Form 2 Arvind Nivas June 2024.pdf5 Sep 2025
Form 3File: Revised CA Certificate Form 3 as per Migrated.pdf5 Sep 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 Sold-Unsold Inventory as on June 2024.pdf5 Sep 2025
Form 1File: Architect certificate - Form 1 - Mar 2024.pdf5 Sep 2025
Form 2File: Form 2 for Arvind Niwas March 2024.pdf5 Sep 2025
Form 3File: Form 3 - March 2024.pdf5 Sep 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 Sold-Unsold Inventory as on March 2024.pdf5 Sep 2025
Form 1File: Architect certificate - Form 1 - Dec 2023.pdf5 Sep 2025
Form 2File: Form 2 for Arvind Niwas December 2023.pdf5 Sep 2025
Form 3File: Form 3 - December 2023_11zon.pdf5 Sep 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 Sold-Unsold Inventory as on December 2023.pdf5 Sep 2025
Form 1File: Architect certficate - Form 1 - Sept 2023.pdf5 Sep 2025
Form 2File: Form 2 for Arvind Niwas September 2023.pdf5 Sep 2025
Form 3File: Form 3 - September 2023.pdf5 Sep 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 Sold-Unsold Inventory as on September 2023.pdf5 Sep 2025
Withdrawal Update Form 1File: Form 1 Architects Certificate 04-07-2025.pdf5 Sep 2025
Withdrawal Update Form 1File: Form 1 Architects Certificate 04-07-2025.pdf5 Sep 2025
Withdrawal Update Form 2File: Form 2 June 2025.pdf5 Sep 2025
Withdrawal Update Form 2File: Form 2 June 2025.pdf5 Sep 2025
Withdrawal Update Form 3File: Form 3 June 2025.pdf5 Sep 2025
Withdrawal Update Form 3File: Form 3 June 2025.pdf5 Sep 2025
Form 2A (FY 2023-2024)File: Form 2A Quality Assurance Certificate 23-24.pdf5 Sep 2025
Form 2A (FY 2024-2025)File: Form 2A Quality Assurance Certificate 24-25.pdf5 Sep 2025
Form 5 (FY 2023-2024)File: Form 5 23-24.pdf23 Jun 2025
Form 5 (FY 2024-2025)File: Form 5 24-25.pdf23 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 for Arvind Niwas March 2025.pdf19 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: Further CC.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate September 2024.pdf19 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 September 2024.pdf19 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 September 2024.pdf19 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate September 2024.pdf19 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 September 2024.pdf19 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 September 2024.pdf19 Nov 2024
Layout approvalFile: Plan 1.pdf17 Oct 2024
Building plan approvalFile: Plan 1.pdf17 Oct 2024
Building plan approvalFile: Plan 2.pdf17 Oct 2024
Building plan approvalFile: Plan 3.pdf17 Oct 2024
Building plan approvalFile: Plan 4.pdf17 Oct 2024
Copy of Layout Approval (in case of layout)File: Plan 1.pdf17 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: Latest CC.pdf17 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 1.pdf17 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 2.pdf17 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 3.pdf17 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 4.pdf17 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf9 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Arvind Nivas June 2024.pdf9 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Arvind Nivas June 2024.pdf9 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certficate - Form 1 - Sept 2023(1).pdf8 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate - Form 1 - Dec 2023(1).pdf8 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate - Form 1 - Mar 2024(1).pdf8 May 2024
Commencement Certificates / NA Order for plotted developmentFile: Full CC - Arvind niwas.pdf7 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate -Form 2 - September 2023.pdf7 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - Form 2 - December 2023(1).pdf7 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - Form 2 - March 2024.pdf7 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate - Form 3 - September 2023.pdf7 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate - Form 3 - December 2023.pdf7 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate - Form 3 - March 2024.pdf7 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA certificate - RERA Hridyaa_230811_150934_11zon.pdf11 Aug 2023

How this compares with Mumbai Suburban

21%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 12 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Arvind Niwas on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Borivali East6,700+ in Mumbai Suburban

2 kmArvind NiwasCompleted 133Lapsed / revoked 73Other 187Dot size: filed unitsN

Filed coordinates, straight-line distance. 393 registered projects within 2 km.

Builder: Hridyaa Infraprojects LLP

Hridyaa Infraprojects LLP has 1 registration on MahaRERA, including Arvind Niwas. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that Arvind Niwas shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Arvind Niwas is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Arvind Niwas?

The registered promoter entity is Hridyaa Infraprojects LLP, a partnership as per the filing. Its GSTIN 27AAPFH3760F1Z7 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Arvind Niwas?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Arvind Niwas?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Arvind Niwas?

The professionals named in the filing: Architect: Arbaaz I. Khan of M/s. Sir & Sir Associates; Engineer: Omkesh Umesh Chaurasia of M/s. Jay Shree Krishna Consultants; Engineer: Basant H Jha; Chartered Accountant: K S P M & Associates Chartered Accountants; Chartered Accountant: Rishit S Doshi of R S Doshi & Associates S Doshi; Chartered Accountant: Shyam Sojitra of Sojitra And Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Arvind Niwas?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Arvind Niwas. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Arvind Niwas to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.