Arihant Residency

By Aditya Deepak Karnawat

RG-MH-29822 · RERA P99000032477 · Last updated on MahaRERA portal: 9 May 2025

Source: official MahaRERA filing

Red flags

  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Apr 2024Possession promisedregistration recorded completed
26 of 44Construction stages doneacross 4 buildings; furthest along: Installation of Lifts, 95%
0Complaints at MahaRERAon this registration
Jump to the 86 documents Report an error

Arihant Residency is a Others project by Aditya Deepak Karnawat in Palghar, Maharashtra, registered with MahaRERA as P99000032477 on 4 Jan 2022. The registration is recorded completed; possession was promised by 30 Apr 2024.

At a glance

Project

  • NameArihant Residency
  • TypeOthers
  • Location
    • Arihant Residency
    • Dahanu Jawhar Road
    • next to Bothra Estate
    • Dahanu EaST
    • 401602.
    • Dahanu East
    • Dahanu (M Cl)
    • Dahanu
    • Palghar
    • 401602
  • Pincode401602
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000032477
  • ReraGenie IDRG-MH-29822

Builder

  • NameAditya Deepak Karnawat
  • Entity typeIndividual

Key dates

this monthRegisteredJan 2022PromisedApr 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on4 Jan 2022
  • Promised completion30 Apr 2024
  • Revised completionNone
  • Buildings4 building records
  • Documents filed86 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A - WINGNA30000
Not ApplicableNA00000
B - WINGNA50000
C - WINGNA30000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 9 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

26 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Installation of Lifts, at 95%.

A - WING63%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
Not Applicable84%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
B - WING68%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%
C - WING82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 9 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes70%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingYes75%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed6

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots6
Closed/Covered6

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,398 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
Aditya Deepak KarnawatDahanu (M Cl)Palghar
Vikram BothraDahanu (M Cl)Palghar
Amit BothraDahanu (M Cl)Palghar

Approvals and building plan

Permissible FSI1372.95
Proposed, not sanctioned1,373 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMatru ashish , irani road, Dahanu west,401602

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNarendra Sharma
EngineerBhavin Shah
EngineerAditya Deepak Karnawat
Chartered AccountantKakaria and Associates
PartnerRole in project
Aditya Deepak Karnawat-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT99000019636Apr 2024 → Apr 2025

Reason as filed by the promoterDue to post Covid-19 second wave operation at the site were disrupted due to labour issues.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Sep 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Apr 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Apr 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 20 Jan 2025

Documents filed86

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 86 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Other - TechnicalFile: MOU.pdf9 May 2025
Architect’s Certificate on Completion of Project (Form 4)File: ARCHITECT FORM 4 - PROJECT COMPLETION CERTIFICATE.pdf24 Jan 2025
Status of Formation of Legal Entity (Society/Co Op etc.)File: Non applicability of society as of now.pdf24 Jan 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Sep bank declaration rera.pdf24 Jan 2025
Deviation Report with respect to Allotment letterFile: No deviation on allotmentt letter and agree of sale.pdf24 Jan 2025
Other - TechnicalFile: Rera Architect Form 4.pdf24 Jan 2025
Deviation Report with respect to model copy of AgreementFile: No deviation on allotmentt letter and agree of sale.pdf24 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Int in other real estate discolsure.pdf24 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31-12-24.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 31-12-2024.pdf20 Jan 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: B Wing OC , Final OC recd 19-12-24.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Signed.pdf20 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Arihant.pdf18 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Arihant.pdf18 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 30-09-24.pdf22 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf22 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 30-09-2024.pdf22 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 30-06-24.pdf20 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 - 30-06-24.pdf20 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: RERA FORM 2 A - 30-06-2024.pdf20 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: RERA FORM 2 A - 30-06-2024.pdf19 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 30-06-24.pdf16 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 - 30-06-24.pdf16 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23).pdf16 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold and unsold inventory 30-06-24_1.pdf16 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf16 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31-03-24.pdf13 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 31-03-2024.pdf13 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A FY23-24.pdf13 Apr 2024
Disclosure of sold/ booked inventoryFile: sold unsold Disclosuree.pdf13 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf13 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31-12-2023.pdf23 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 31-12-2023.pdf23 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf23 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Scanned.pdf30 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf23 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 30-09-2023.pdf23 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf23 Oct 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: C 1 Occupancy Certificate_ Completion Certificate_ Architect's certificate of completion f20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf3 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf2 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf2 Aug 2023
Layout approvalFile: REVISED PLAN ARIHANT RESIDENCYYY.pdf26 Apr 2023
Layout approvalFile: REVISED PLAN ARIHANT RESIDENCY.pdf26 Apr 2023
Layout approvalFile: REVISED PLAN ARIHANT RESIDENCYY.pdf26 Apr 2023
Building plan approvalFile: REVISED PLAN ARIHANT RESIDENCYYY.pdf26 Apr 2023
Building plan approvalFile: REVISED PLAN ARIHANT RESIDENCY.pdf26 Apr 2023
Building plan approvalFile: REVISED PLAN ARIHANT RESIDENCYY.pdf26 Apr 2023
Copy of Layout Approval (in case of layout)File: REVISED PLAN ARIHANT RESIDENCYYY.pdf26 Apr 2023
Copy of Layout Approval (in case of layout)File: REVISED PLAN ARIHANT RESIDENCY.pdf26 Apr 2023
Copy of Layout Approval (in case of layout)File: REVISED PLAN ARIHANT RESIDENCYY.pdf26 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: REVISED PLAN ARIHANT RESIDENCYYY.pdf26 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: REVISED PLAN ARIHANT RESIDENCY.pdf26 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: REVISED PLAN ARIHANT RESIDENCYY.pdf26 Apr 2023
Commencement Certificates / NA Order for plotted developmentFile: Revised CC.pdf26 Apr 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Arihant Residency OC - A wing.pdf26 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf25 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2.pdf25 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf25 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5.pdf8 Feb 2023
Other - LegalFile: Form 5 Reply.pdf8 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 (30-09-2022).pdf3 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3( 31-12-2022).pdf3 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1.pdf28 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: dahanu_rera_dec 22 FORM 1.pdf28 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: dahanu rera sept 22 FORM 1.pdf28 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 sept qtr 22.pdf28 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: fForm 2 31-12-2022 dec 22.pdf28 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 arihant till june 2022-compressed.pdf7 Sep 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 arihant till june 2022-compressed.pdf7 Sep 2022
Details of encumbrances concerned to LegalFile: 1 Details of encumbrances (1).pdf8 Jul 2022
Details of encumbrancesFile: Encumberance details on letter head.pdf24 Dec 2021
CERSAI detailsFile: CERSAI_Search_Report_200226520444_For_Asset_Based_Search_24_12_2021_10_27_57_416.pdf9 Dec 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 FINAL-compressed.pdf6 Sep 2021
Copy of the legal title reportFile: Legal title report.pdf1 Sep 2021
Proforma of Allotment letterFile: Proforma ALLOTMENT LETTER AND agreement of sale.pdf1 Sep 2021
Declaration about Commencement CertificateFile: Rera commencement certificate Declaration_1.pdf20 Jul 2021
Layout approvalFile: SHEET 1-A1-merged-compressed.pdf1 May 2021
Building plan approvalFile: SHEET 1-A1-merged-compressed.pdf1 May 2021

How this compares with Palghar

31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is completed

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Arihant Residency on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dahanu East3,200+ in Palghar

2 kmArihant ResidencyCompleted 123Lapsed / revoked 57Other 136Dot size: filed unitsN

Filed coordinates, straight-line distance. 316 registered projects within 2 km.

Builder: Aditya Deepak Karnawat

Aditya Deepak Karnawat has 1 registration on MahaRERA, including Arihant Residency. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if Arihant Residency is delayed beyond 30 Apr 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Arihant Residency?

The registered promoter entity is Aditya Deepak Karnawat, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Arihant Residency?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Arihant Residency?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Arihant Residency?

The professionals named in the filing: Architect: Narendra Sharma; Engineer: Bhavin Shah; Engineer: Aditya Deepak Karnawat; Chartered Accountant: Kakaria and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Arihant Residency?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Arihant Residency. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Arihant Residency to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.