Red flags

  • Registration lapsed
  • Possession 4 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Ratnagiri registration emailed to you, free during the pilot beta.
Jun 2026Possession promised4 months past this date
0 of 44Construction stages doneacross 4 buildings; furthest along: Excavation, 0%
0Complaints at MahaRERAon this registration
Jump to the 55 documents Report an error

Arihant Lake City is a Others project by Arihant Vastu Nirman Pvt. Ltd in Ratnagiri, Maharashtra, registered with MahaRERA as P52800017460 on 13 Aug 2018. Possession was promised by 1 Jun 2026 and is now 4 months past that date.

At a glance

Project

  • NameArihant Lake City
  • TypeOthers
  • Location
    • Opposite Bhogale Bus Stand
    • Bus Stand
    • Chiplun (M Cl)
    • Chiplun
    • Ratnagiri
    • 415604
  • Pincode415604
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52800017460
  • ReraGenie IDRG-MH-93104

Builder

  • NameArihant Vastu Nirman Pvt. Ltd
  • Entity typeCompany
  • CINU45200PN2012PTC142119
  • Managing DirectorsSuresh Tarachand Gundecha, Manoj Suresh Gundecha
  • DirectorsMukesh Suresh Gundecha, Mahesh Suresh Gundecha
  • Other registrations13 more →
  • Completed5 of 14
  • No longer live5 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

4 months past promisethis monthRegisteredAug 2018PromisedJun 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on13 Aug 2018
  • Promised completion1 Jun 2026
  • Revised completionNone
  • Buildings4 building records
  • Documents filed55 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Arihant Lake City A WingNA60000
Arihant Lake City B WingNA60000
Arihant Lake City C WingNA60000
Arihant Lake City D WingNA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 27 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Excavation, at 0%.

Arihant Lake City A Wing0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Arihant Lake City B Wing0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Arihant Lake City C Wing0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Arihant Lake City D Wing0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 27 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed17

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots17
Closed/Covered14
Open Space3
BuildingClosed/CoveredOpen SpaceTotal
Arihant Lake City A Wing202
Arihant Lake City B Wing404
Arihant Lake City C Wing303
Arihant Lake City D Wing538

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,255 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Rafiuddin A Wahab KaskarChiplun (M Cl)Ratnagiri

Approvals and building plan

Sanctioning authorityChiplun Municipal Council Chiplun
Permissible FSI5231.0
Proposed, not sanctioned5,231 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRatnagiri

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMilind Rajaram Yadav
PartnerRole in project
Arihant Vastu Nirman Pvt. Ltd-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Jul 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Jul 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Jul 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Jul 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 5 Apr 2025

Documents filed55

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Other - LegalFile: OC.pdf27 Jun 2025
Form 1File: FORM 1 - Mar' 25.pdf27 Jun 2025
Form 2File: ALC Form 2 Mar'25-Signed Scan Copy.pdf27 Jun 2025
Form 3File: Form 3_Arihant Lake City_Mar'25.pdf27 Jun 2025
Disclosure of Sold and Booked InventoryFile: Arihant Lake City Sold Inventory as on March'25.pdf27 Jun 2025
Form 1File: FORM 1 - Jun' 24.pdf26 May 2025
Form 2File: ALC Form 2 Jun'24-Signed Scan Copy.pdf26 May 2025
Form 3File: ALC Form 3 Jun' 24.pdf26 May 2025
Disclosure of Sold and Booked InventoryFile: Arihant Lake City Sold Inventory as on June 24.pdf26 May 2025
Form 1File: FORM 1 - Sept' 24.pdf26 May 2025
Form 2File: ALC Form 2 Sep'24-Signed Scan Copy.pdf26 May 2025
Form 3File: ALC Form 3 Sep' 24.pdf26 May 2025
Disclosure of Sold and Booked InventoryFile: Arihant Lake City Sold Inventory as on September 24.pdf26 May 2025
Form 1File: FORM 1 - Dec' 24.pdf26 May 2025
Form 2File: ALC Form 2 Dec'24-Signed Scan Copy.pdf26 May 2025
Form 3File: ALC Form 3 Dec' 24.pdf26 May 2025
Disclosure of Sold and Booked InventoryFile: Arihant Lake City Sold Inventory as on December 24.pdf26 May 2025
Certificates of CA (Form 3)File: ALC Form 3 Jun' 24.pdf18 Apr 2025
Certificates of CA (Form 3)File: ALC Form 3 Sep' 24.pdf18 Apr 2025
Certificates of CA (Form 3)File: ALC Form 3 Dec' 24.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ALC Form 2 Jun'24-Signed Scan Copy.pdf15 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ALC Form 2 Sep'24-Signed Scan Copy.pdf15 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ALC Form 2 Dec'24-Signed Scan Copy.pdf15 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ALC Form 2 Mar'25-Signed Scan Copy.pdf15 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - Jun' 24.pdf11 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - Sept' 24.pdf11 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - Dec' 24.pdf11 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - Mar' 25.pdf11 Apr 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: ARIHANT LAKE CITY 'C' and 'D' WING OC.pdf5 Apr 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: ARIHANT LAKE CITY 'B' WING OC.pdf26 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 2018 to 2019 form 5_0001.pdf13 Aug 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 2019to 2020 form 5_0001.pdf13 Aug 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 2020to2021 form 5_0001.pdf13 Aug 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 2021to2022 form 5_0001.pdf13 Aug 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 2022to2023 form 5_0001.pdf13 Aug 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 2023to2024 form 5_0001.pdf13 Aug 2024
Building plan approvalFile: iod.pdf20 Jul 2018
Layout approvalFile: copy layout 1.pdf20 Jul 2018
Layout approvalFile: copy layout 2.pdf20 Jul 2018
Layout approvalFile: copy layout 3.pdf20 Jul 2018
Copy of the legal title reportFile: legat tittle.pdf20 Jul 2018
Details of encumbrancesFile: non encb.pdf20 Jul 2018
Copy of Layout Approval (in case of layout)File: copy layout 1.pdf20 Jul 2018
Copy of Layout Approval (in case of layout)File: copy layout 2.pdf20 Jul 2018
Copy of Layout Approval (in case of layout)File: copy layout 3.pdf20 Jul 2018
Building Plan Approval (IOD)File: iod.pdf20 Jul 2018
Commencement Certificates / NA Order for plotted developmentFile: comm certificate.pdf20 Jul 2018
Declaration in FORM BFile: form b.pdf20 Jul 2018
Certificates of CA (Form 3)File: CA.pdf20 Jul 2018
Proforma of Allotment letterFile: allotment letter 1.pdf20 Jul 2018
Proforma of Allotment letterFile: allotment letter 2.pdf20 Jul 2018
Proforma of Allotment letterFile: allotment letter 3.pdf20 Jul 2018
Proforma of Allotment letterFile: allotment letter 4.pdf20 Jul 2018
Proforma of Allotment letterFile: allotment letter 5.pdf20 Jul 2018
Proforma of Allotment letterFile: allotment letter 6.pdf20 Jul 2018

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Crown ParkShivaji Nagar - Ratnagiri Maharashtra42CompletedApr 2016Feb 2016

How this compares with Ratnagiri

15%of Ratnagiri projects moved their completion datethis one has not
30%of Ratnagiri registrations have lapsed or been cancelledthis one is among them

Computed across the 1,100+ Ratnagiri projects on ReraGenie, from their own filings.

Keep Arihant Lake City on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bus Stand1,100+ in Ratnagiri

2 kmArihant Lake CityCompleted 43Lapsed / revoked 25Other 21Dot size: filed unitsN

Filed coordinates, straight-line distance. 89 registered projects within 2 km.

Builder: Arihant Vastu Nirman Pvt. Ltd

Arihant Vastu Nirman Pvt. Ltd has 14 registrations on MahaRERA, including Aathley Sankul and Arihant Platino. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Ratnagiri district page.

Frequently asked questions

What does it mean that Arihant Lake City shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Arihant Lake City is delayed beyond 1 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Arihant Lake City?

The registered promoter entity is Arihant Vastu Nirman Pvt. Ltd, a company as per the filing. Its CIN U45200PN2012PTC142119 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Arihant Lake City?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Arihant Lake City?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Arihant Lake City?

The professionals named in the filing: Architect: Milind Rajaram Yadav. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Arihant Lake City?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Arihant Lake City. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Arihant Lake City to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.