Home / Browse projects / Raigarh, Maharashtra / ARIHANT ALOKI PHASE VI

Registered Litigation declared Residential / Group Housing project

ARIHANT ALOKI PHASE VI

By ARIHANT AASHIYANA PRIVATE LIMITED

RG-MH-28068 · RERA P52000025180 · Last updated on MahaRERA portal: 16 Apr 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 2 cases
  • Completion date moved by 48 months
  • 1 extension taken

Clear

  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2031Possession promisedmoved 48 months from the original
0 of 11Construction stages donefurthest along: Excavation, 0%
174 of 174Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 127 documents Report an error

ARIHANT ALOKI PHASE VI is a Residential / Group Housing project by ARIHANT AASHIYANA PRIVATE LIMITED in Raigarh, Maharashtra, registered with MahaRERA as P52000025180 on 20 Mar 2020. Possession is promised by 31 Dec 2031. The completion date has moved by 48 months from the original filing. 0 of the 174 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.

At a glance

Project

  • NameARIHANT ALOKI PHASE VI
  • TypeResidential / Group Housing
  • Location
    • Bhisegaon
    • Karjat
    • Raigarh
    • 410201
  • Pincode410201
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000025180
  • ReraGenie IDRG-MH-28068

Builder

  • NameARIHANT AASHIYANA PRIVATE LIMITED
  • Entity typeCompany
  • DirectorsASHOKKUMAR BHANWARLAL CHHAJER, PARTH ASHOKKUMAR CHHAJER
  • Other registrations11 more →
  • Completed7 of 12
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredMar 2020First promiseDec 2027Revised toDec 2031

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on20 Mar 2020
  • Promised completion31 Dec 2031
  • Revised completionRevised to 31 Dec 2031 (originally 30 Dec 2027)
  • Buildings1 building record
  • Documents filed127 files

Current status

0%0 of 174 units booked
0.0%Work done, per cost certificate

Figures as on 16 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
C2NA17161740174

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 16 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.

C2: 0% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 16 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes90%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed27

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots27
Closed/Covered27

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,808 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on11 Jun 2025
LandownerVillageDistrict
USHASHRIKRISHNA DHARAPMumbai CityMumbai City
RAMCHANDRA BARSHA GHARATNavi Mumbai (M Corp.)Thane

Approvals and building plan

Sanctioning authorityKARJAT MUNICIPAL COUNCIL
Permissible FSI12814.36
Proposed, not sanctioned9,857 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSECTOR-17, VARDHMAN MARKET PREMISES CO-OPERATIVE SOCIETY, VASHI, NAVI MUMBAI, MAHARASHTRA-40070
Estimated costRs 25.69 cr
Work done0.0%
BuildingWingEstimatedIncurred
C2NARs 24.46 cr-
-NARs 1.23 cr-

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectYOGITA BHANDARKAR
EngineerSATISH MHATRE
EngineerKALEEM SAYYAD
EngineerER. Kaleem Sayyad
Chartered AccountantUmmed Jain & Co.
Chartered AccountantANJANI KUMAR GOYAL
Chartered AccountantKailash Chand Jain & Co
Chartered AccountantAnjani Goyal & Co.
PartnerRole in project
ARIHANT AASHIYANA PRIVATE LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000024555Dec 2027 → Dec 2031

Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 7(3) in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19.

Litigation declared2

CaseCourtStatus
RCS No 120/2018/2018Court of Civil Judge KarjatPending for hearing on application for dismissal of suit
120/2018/2018Civil Judge Junior DivisionOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Feb 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Aug 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Aug 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Aug 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2031

Documents filed127

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 127 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: 11 Form 1_ALOKI PH VI_310326.pdf16 Apr 2026
Withdrawal Update Form 2File: Form 2_Aloki Ph VI_250326.pdf16 Apr 2026
Withdrawal Update Form 3File: 11 Form 3_Aloki Ph VI_250326.pdf16 Apr 2026
Withdrawal Update Form 1File: Form 1_Aloki Phase VI_31122025.pdf20 Jan 2026
Withdrawal Update Form 2File: Form 2_Aloki Ph VI_31122025.pdf20 Jan 2026
Withdrawal Update Form 3File: Form 3_Aloki Phase VI_31122025.pdf20 Jan 2026
Withdrawal Update Form 1File: Form 1_ALOKI PHASE VI_30092025.pdf17 Oct 2025
Withdrawal Update Form 2File: Form 2_Aloki Ph VI_30092025.pdf17 Oct 2025
Withdrawal Update Form 3File: Form 3_Aloki Ph VI_30092025.pdf17 Oct 2025
Form 5 (FY 2024-2025)File: Aloki Phase VI.pdf17 Oct 2025
Form 2A (FY 2024-2025)File: Aloki Phase VI.pdf4 Oct 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Aloki Ph VI_310325.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Aloki Ph-VI_31032025.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Aloki Ph-VI_31032025_SIGNED.pdf18 Apr 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE SIGNED.pdf18 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Aloki Phase VI.pdf19 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Aloki Phase VI.pdf19 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Aloki Phase VI.pdf19 Jan 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE SIGNED.pdf19 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Aloki Phase VI_Signed.pdf12 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Aloki Ph VI.pdf21 Oct 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE_SIGNED.pdf21 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM I - ALOKI PHASE VI_SIGNED.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aloki 6 SIGNED.pdf19 Oct 2024
Declaration about Commencement CertificateFile: Aloki VI - Format D SIGN.pdf13 Aug 2024
Layout approvalFile: 1.pdf12 Aug 2024
Building plan approvalFile: 2.pdf12 Aug 2024
Building plan approvalFile: 3.pdf12 Aug 2024
Building plan approvalFile: 4.pdf12 Aug 2024
Building plan approvalFile: 5.pdf12 Aug 2024
Building plan approvalFile: 6.pdf12 Aug 2024
Building plan approvalFile: 7.pdf12 Aug 2024
Copy of Layout Approval (in case of layout)File: 1.pdf12 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: 2.pdf12 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: 3.pdf12 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: 4.pdf12 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: 5.pdf12 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: 6.pdf12 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: 7.pdf12 Aug 2024
Commencement Certificates / NA Order for plotted developmentFile: ARIHANT ALOKI C1-C2 CC 04-02-2022.pdf12 Aug 2024
Details of encumbrances concerned to FinanceFile: Aloki VI - Encumbrance Letter Legal SIGN.pdf10 Aug 2024
Details of encumbrances concerned to LegalFile: Aloki VI - Encumbrance Letter Legal SIGN.pdf10 Aug 2024
Declaration about Commencement CertificateFile: Aloki VI - Declaration about CC SIGN.pdf10 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aloki VI - Form 1 30062024.pdf10 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aloki VI - Form 2 30062024.pdf10 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Aloki V 19-20 SIGN.pdf10 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Aloki VI 19-20 SIGN.pdf10 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Aloki VI 20-21 SIGN.pdf10 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Aloki VI 21-22 SIGN.pdf10 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Aloki VI 22-23 SIGN.pdf10 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Aloki VI 23-24 SIGN.pdf10 Aug 2024
CERSAI detailsFile: Aloki VI - Cersai Declaration SIGN.pdf10 Aug 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf10 Aug 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Aloki VI - Form 5 FY 22-23.pdf10 Aug 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Aloki VI - Form 5 FY 21-22.pdf10 Aug 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Aloki VI - Format A SIGN.pdf10 Aug 2024
Declaration in FORM BFile: Aloki VI - Form B.pdf9 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aloki VI - Form 3 30062024_11zon (1).pdf9 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Aaloki VI.pdf22 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARIHANT ALOKI PHASE VI.PDF20 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure SIGNED.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 30062024 Aloki Phase VI SIGNED.pdf20 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5_Aloki Phase 6_FY 22-23.pdf7 Jun 2024
Disclosure of sold/ booked inventoryFile: Aloki VI - Dec 23 SIGNED.pdf28 May 2024
Disclosure of sold/ booked inventoryFile: Aloki VI - Mar 24 SIGNED.pdf28 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Aloki Phase VI 31032024.PDF4 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Aloki Phase VI 31122023.pdf4 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Aloki Phase VI 31032024.pdf4 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 31032024 Aloki Phase VI SIGN.pdf23 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aloki Phase 6.pdf7 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE - ARIHANT ALOKI PHASE VI 30TH DECEMBER 2023.PDF22 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM I -ARIHANT ALOKI PHASE VI.PDF19 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 RERA Aloki Ph VI Sept 2023.pdf19 Oct 2023
Disclosure of sold/ booked inventoryFile: Arihant Aloki Phase 6-Aashiyana.pdf19 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aloki Phase-VI.pdf19 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aloki VI.pdf20 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 RERA Aloki 6 June 2023.pdf19 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARIHANT ALOKI VI - FORM 1 - ARCHITECT CERTIFICATE 30 JUNE 2023.PDF17 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 RERA ALOKI 6 MARCH 2023.pdf19 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ALOKI PHASE VI 31 MARCH 23.PDF18 Apr 2023

How this compares with Raigarh

0%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 48 months
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ARIHANT ALOKI PHASE VI on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bhisegaon5,900+ in Raigarh

2 kmARIHANT ALOKI PHASE VICompleted 30Lapsed / revoked 30Other 43Dot size: filed unitsN

Filed coordinates, straight-line distance. 103 registered projects within 2 km.

Builder: ARIHANT AASHIYANA PRIVATE LIMITED

ARIHANT AASHIYANA PRIVATE LIMITED has 12 registrations on MahaRERA, including ARIHANT ANSHULA and ARIHANT AMISHA PHASE I. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if ARIHANT ALOKI PHASE VI is delayed beyond 31 Dec 2031?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ARIHANT ALOKI PHASE VI?

The registered promoter entity is ARIHANT AASHIYANA PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ARIHANT ALOKI PHASE VI?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ARIHANT ALOKI PHASE VI?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ARIHANT ALOKI PHASE VI?

The professionals named in the filing: Architect: YOGITA BHANDARKAR; Engineer: SATISH MHATRE; Engineer: KALEEM SAYYAD; Engineer: ER. Kaleem Sayyad; Chartered Accountant: Ummed Jain & Co.; Chartered Accountant: ANJANI KUMAR GOYAL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ARIHANT ALOKI PHASE VI?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ARIHANT ALOKI PHASE VI. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ARIHANT ALOKI PHASE VI to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.