Completed No litigation declared Residential / Group Housing project

ARIHANT ALOKI PHASE III

By ARIHANT AASHIYANA PRIVATE LIMITED

RG-MH-27943 · RERA P52000024460 · Last updated on MahaRERA portal: 19 Apr 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 4 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Apr 2025Possession promisedregistration recorded completed
7 of 11Construction stages donefurthest along: Internal walls, 95%
0Complaints at MahaRERAon this registration
Jump to the 102 documents Report an error

ARIHANT ALOKI PHASE III is a Residential / Group Housing project by ARIHANT AASHIYANA PRIVATE LIMITED in Raigarh, Maharashtra, registered with MahaRERA as P52000024460 on 13 Feb 2020. The registration is recorded completed; possession was promised by 30 Apr 2025. The completion date has moved by 4 months from the original filing.

At a glance

Project

  • NameARIHANT ALOKI PHASE III
  • TypeResidential / Group Housing
  • Location
    • Bhisegaon
    • Karjat
    • Raigarh
    • 410201
  • Pincode410201
  • RERA no.P52000024460
  • ReraGenie IDRG-MH-27943

Builder

  • NameARIHANT AASHIYANA PRIVATE LIMITED
  • Entity typeCompany
  • DirectorsASHOKKUMAR BHANWARLAL CHHAJER, PARTH ASHOKKUMAR CHHAJER
  • Other registrations11 more →
  • Completed7 of 12
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredFeb 2020First promiseDec 2024Revised toApr 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on13 Feb 2020
  • Promised completion30 Apr 2025
  • Revised completionRevised to 30 Apr 2025 (originally 30 Dec 2024)
  • Buildings1 building record
  • Documents filed102 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A2NA160000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 19 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.

A2: 92% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.92%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.56%

Progress on shared amenities15

As on 19 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes90%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed27

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots27
Closed/Covered27

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,323 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
USHASHRIKRISHNA DHARAPMumbai CityMumbai City
RAMCHANDRA BARSHA GHARATNavi Mumbai (M Corp.)Thane
RAHUL SHRIKRISHNA DHARAPGreater Mumbai (M Corp.) (Part) (802794)Mumbai Suburban

Approvals and building plan

Permissible FSI4789.73
Proposed, not sanctioned3,684 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSECTOR-17, VARDHMAN MARKET PREMISES CO-PERATIVE SOCIETY, VASHI

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectYogita Bhandarkar
EngineerKaleem Sayyad
PartnerRole in project
ARIHANT AASHIYANA PRIVATE LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000025555Dec 2024 → Apr 2025

Reason as filed by the promoterThe project has been progressing at the expected pace and has not faced any physical delays. However, the primary reason for the delay in obtaining the Occupancy Certificate (OC) was the Maharashtra Lok Sabha Elections, during which we were unable to secure the necessary permissions to apply for the OC due to the unavailability of key officials. Despite this, we remain fully committed to safeguarding the interests of all allottees and ensuring the successful completion of the project. We are pleased to inform you that the application for the OC has now been submitted, and we anticipate receivi

Litigation declared1

CaseCourtStatus
RCS No 120/2018/2018Court of Civil Judge KarjatPending for hearing on application for dismissal of suit

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Feb 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Feb 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Feb 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Feb 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 17 Apr 2025

Documents filed102

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 102 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Aloki Ph III_310325.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Aloki Ph-III_310325.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Aloki Phase III_310325_SIGNED.pdf18 Apr 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE SIGNED.pdf18 Apr 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC with Name Change Declaration.pdf17 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Aloki Phase III.pdf19 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Aloki Phase III.pdf19 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Aloki Phase III.pdf19 Jan 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE.pdf19 Jan 2025
Declaration in FORM BFile: Arohi Ph II - Form B - Extension.pdf16 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aloki Ph III - Form 2 Sept 24.pdf16 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Aloki Ph III - Form 5 2021-22.pdf16 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Aloki Ph III - Form 5 2022-23.pdf16 Dec 2024
Declaration in FORM BFile: Form B.pdf14 Dec 2024
Declaration about Commencement CertificateFile: Format D.pdf14 Dec 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf14 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf14 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Aloki III 19-20.pdf12 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Aloki III 20-21.pdf12 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Aloki III 21-22.pdf12 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Aloki III 22-23.pdf12 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5_Aloki Phase 3_FY 22-23.pdf12 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Aloki III 23-24.pdf12 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Aloki Phase III_signed.pdf11 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM I - ALOKI PHASE III _SIGNED.pdf21 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Aloki Ph III.pdf21 Oct 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE_SIGNED.pdf21 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aloki 3 SIGNED.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Aaloki III.pdf22 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARIHANT ALOKI PHASE III.PDF20 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure SIGNED.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 30062024 Aloki Phase -III SIGNED.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: Aloki III - Dec 23 SIGNED.pdf1 Jun 2024
Disclosure of sold/ booked inventoryFile: Aloki III - Mar 24 SIGNED.pdf1 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Aloki Phase III 31122023.pdf8 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Aloki Phase III 31032024.PDF8 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Aloki Phase III 31122023.pdf8 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Aloki Phase III 31032024.pdf8 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Aloki Phase III 31122023 SIGN.pdf8 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Aloki Phase III 31032024 SIGN.pdf8 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM I ARIHANT ALOKI PHASE III 30 SEPTEMBER 2023.PDF19 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 RERA Aloki Ph III Sept 2023.pdf19 Oct 2023
Disclosure of sold/ booked inventoryFile: Arihant Aloki Phase 3-Aashiyana.pdf19 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aloki Phase-III.pdf19 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: aloki_compressed.pdf25 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARIHANT ALOKI PHASE III - FORM 1 - ARCHITECT CERTIFICATE 30TH JUNE 2023.PDF19 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 RERA Aloki 3 June 2023.pdf19 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aloki III_11zon.pdf25 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ALOKI PHASE III 31 MARCH 2023 .PDF19 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 RERA ALOKI 3 MARCH2023.pdf19 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aloki Ph iii - 300922.PDF18 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aloki Ph iii 211221.PDF18 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aloki Ph iii 300622.PDF18 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aloki Ph iii 310322.PDF18 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aloki Ph iii 311221.PDF18 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aloki Ph iii 311222.PDF18 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aloki Ph iii March 21.PDF18 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Arihant_Aloki_Phase3_Form 5_2019-20.pdf17 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM5 RERA ALOKI3 2022.PDF17 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARIHANT ALOKI PHASE III- 31ST MARCH 2020.PDF16 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARIHANT ALOKI PHASE III- 31ST MARCH 2021.PDF16 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARIHANT ALOKI PHASE III- 21ST DECEMBER 2021.PDF16 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31 DECEMBER 21.PDF16 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31 MARCH 22.PDF16 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31 JUNE 22.PDF16 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31 DECEMBER 22.PDF16 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 30 SEPTEMBER 22.PDF16 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 30 SEPTEMBER 22.PDF16 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERAFORM2ALOKI32020.pdf16 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERAFORM2ALOKI3MARCH2021.pdf16 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERAFORM2ALOKI321DEC2021.pdf16 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERAFORM2ALOKI331DEC2021.pdf16 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERAFORM2ALOKI3MARCH2022.pdf16 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERAFORM2ALOKI3JUNE22.pdf16 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERAFORM2ALOKI3SEPT22.pdf16 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERAFORM2ALOKI3SEPT22.pdf16 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERAFORM2ALOKI3DEC22.pdf16 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aloki ph iii 310320.PDF16 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: aloki pH 3 Form 1 2022.pdf19 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Arihant Aloki Phase III.pdf22 Feb 2022

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one moved by 4 months
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ARIHANT ALOKI PHASE III on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bhisegaon5,900+ in Raigarh

Builder: ARIHANT AASHIYANA PRIVATE LIMITED

ARIHANT AASHIYANA PRIVATE LIMITED has 12 registrations on MahaRERA, including ARIHANT ANSHULA and ARIHANT AMISHA PHASE I. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if ARIHANT ALOKI PHASE III is delayed beyond 30 Apr 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ARIHANT ALOKI PHASE III?

The registered promoter entity is ARIHANT AASHIYANA PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ARIHANT ALOKI PHASE III?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ARIHANT ALOKI PHASE III?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ARIHANT ALOKI PHASE III?

The professionals named in the filing: Architect: Yogita Bhandarkar; Engineer: Kaleem Sayyad. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ARIHANT ALOKI PHASE III?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ARIHANT ALOKI PHASE III. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ARIHANT ALOKI PHASE III to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.