Home / Browse projects / Raigarh, Maharashtra / ARIHANT ALOKI PHASE II

Completed No litigation declared Residential / Group Housing project

ARIHANT ALOKI PHASE II

By ARIHANT AASHIYANA PRIVATE LIMITED

RG-MH-25324 · RERA P52000006314 · Last updated on MahaRERA portal: 12 Apr 2023

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Mar 2022Possession promisedregistration recorded completed
5 of 22Construction stages doneacross 2 buildings; furthest along: Staircases, 97%
1Complaints at MahaRERAon this registration
Jump to the 68 documents Report an error

ARIHANT ALOKI PHASE II is a Residential / Group Housing project by ARIHANT AASHIYANA PRIVATE LIMITED in Raigarh, Maharashtra, registered with MahaRERA as P52000006314 on 14 Aug 2017. The registration is recorded completed; possession was promised by 30 Mar 2022. 1 complaint is on record with the regulator.

At a glance

Project

  • NameARIHANT ALOKI PHASE II
  • TypeResidential / Group Housing
  • Location
    • Bhisegaon
    • Karjat
    • Raigarh
    • 410201
  • Pincode410201
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000006314
  • ReraGenie IDRG-MH-25324

Builder

  • NameARIHANT AASHIYANA PRIVATE LIMITED
  • Entity typeCompany
  • DirectorsASHOKKUMAR BHANWARLAL CHHAJER, PARTH ASHOKKUMAR CHHAJER
  • Other registrations11 more →
  • Completed7 of 12
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredAug 2017PromisedMar 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on14 Aug 2017
  • Promised completion30 Mar 2022
  • Revised completionNone
  • Buildings2 building records
  • Documents filed68 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A3NA90000
B2NA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 12 Apr 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Staircases, at 97%.

A35%
ActivityProgress
Excavation60%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B278%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises91%
Sanitary Fittings within the flats / premises52%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks97%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.66%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.47%

Progress on shared amenities15

As on 12 Apr 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes75%
Water SupplyYes40%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes10%
Street LightingYes0%
Community BuildingsYes50%
Treatment And Disposal Of Sewage And Sullage WaterYes90%
Solid Waste Management And DisposalYes40%
Water conservation /Rain water harvestingYes40%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes75%
Electrical meter room, sub-station, receiving stationYes25%
Aggregate area of recreational Open SpaceYes10%
Open ParkingYes0%

Parking filed41

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots41
Closed/Covered41
BuildingClosed/CoveredTotal
A32929
B21212

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,814 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
USHA SHRIKRISHNA DHARAPMumbai CityMumbai City
RAMCHANDRA BARSHA GHARATNavi Mumbai (M Corp.)Thane
RAHUL SHRIKRISHNA DHARAPGreater Mumbai (M Corp.) (Part) (802794)Mumbai Suburban

Approvals and building plan

Permissible FSI6237.53
Proposed, not sanctioned6,082 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSECTOR - 17, VARDHAMAN MARKET PREMISES CO-OPERATIVE SOCIETY, VASHI, NAVI MUMBAI, MAHARASHTRA - 40070

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKIRAN K AWHALE
ArchitectYogita Bhandarkar
EngineerKaleem Sayyad
PartnerRole in project
ARIHANT AASHIYANA PRIVATE LIMITED-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12600082Riya Ravindra LandgeARIHANT AASHIYANA PRIVATE LIMITED05/01/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Mar 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Mar 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Mar 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 4 Feb 2023

Documents filed68

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 aloki II.pdf12 Apr 2023
Other - TechnicalFile: Clarification.pdf12 Apr 2023
Layout approvalFile: 1.pdf3 Mar 2023
Building plan approvalFile: 2.pdf3 Mar 2023
Building plan approvalFile: 3.pdf3 Mar 2023
Building plan approvalFile: 4.pdf3 Mar 2023
Building plan approvalFile: 5.pdf3 Mar 2023
Building plan approvalFile: 6.pdf3 Mar 2023
Building plan approvalFile: 7.pdf3 Mar 2023
PAN CardFile: PAN_Arihant Aashiyana.pdf3 Mar 2023
Copy of Layout Approval (in case of layout)File: 1.pdf3 Mar 2023
Building Plan Approval (IOD)File: 2.pdf3 Mar 2023
Building Plan Approval (IOD)File: 3.pdf3 Mar 2023
Building Plan Approval (IOD)File: 4.pdf3 Mar 2023
Building Plan Approval (IOD)File: 5.pdf3 Mar 2023
Building Plan Approval (IOD)File: 6.pdf3 Mar 2023
Building Plan Approval (IOD)File: 7.pdf3 Mar 2023
Commencement Certificates / NA Order for plotted developmentFile: ALOKI CC.pdf3 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE - 31ST MARCH 2021.PDF9 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE - 21ST DECEMBER 2021.PDF9 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA-FORM1-ALOKI 2- 31 Dec 2021.PDF9 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA- FORM2- ALOKI 2- 31 March 2021.PDF9 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA-FORM2-ALOKI 2- 21 Dec 2021.PDF9 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA -FORM2-ALOKI 2-31 Dec 2021.PDF9 Feb 2023
Certificates of CA (Form 3)File: RERA-FORM2-ALOKI 2- 21 Dec 2021.PDF9 Feb 2023
Certificates of CA (Form 3)File: RERA-FORM2-ALOKI 2- 21 Dec 2021.PDF9 Feb 2023
Certificates of CA (Form 3)File: RERA -FORM2-ALOKI 2-31 Dec 2021.PDF9 Feb 2023
Certificates of CA (Form 3)File: 31 Dec 21dsc.pdf9 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 II 19-20.pdf9 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 I 21-22.pdf9 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE2018.pdf8 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE 2019.pdf8 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE 2020.pdf8 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM2-ALOKI PH II- 2018.pdf8 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM2-ALOKI PH II-2020.pdf8 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM2-ALOKI PH II-2019.pdf8 Feb 2023
Certificates of CA (Form 3)File: Form 3 2020 aloki ii.pdf8 Feb 2023
Certificates of CA (Form 3)File: Form 3 2021 aloki ii.pdf8 Feb 2023
Certificates of CA (Form 3)File: CA Form 3 Aloki 2018.pdf7 Feb 2023
Certificates of CA (Form 3)File: CA Form 3 Aloki 2019.pdf7 Feb 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: ARIHANT ALOKI OC.pdf4 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Arihant Aloki Phase II.pdf22 Feb 2022
OtherFile: Intimation to mahaRERA_Lockdown_Aashiyana.pdf1 Apr 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form-5_Aloki II_2017-18.pdf13 Dec 2019
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5_Aloki II_2018-19.PDF5 Dec 2019
OtherFile: Aloki B2 Building Plinth Completion Certificate.pdf4 May 2019
Proforma of Allotment letterFile: RERA Agreement Aloki Phase II.pdf13 Nov 2018
Details of encumbrancesFile: RERA_Aashiyna_Borrowing.PDF5 Nov 2018
Commencement Certificates / NA Order for plotted developmentFile: Aloki CC A1 TO A4 WING.pdf23 Mar 2018
Commencement Certificates / NA Order for plotted developmentFile: Aloki CC B1 B2 C1 C2 WING.pdf23 Mar 2018
Building plan approvalFile: Building Plan 1.pdf28 Jul 2017
Building plan approvalFile: Building Plan 2.pdf28 Jul 2017
Building plan approvalFile: Building Plan 3.pdf28 Jul 2017
Layout approvalFile: LAYOUT 1.pdf28 Jul 2017
Layout approvalFile: LAYOUT 2.pdf28 Jul 2017
Copy of the legal title reportFile: Title Certificate 1.pdf28 Jul 2017
Copy of the legal title reportFile: Title Certificate 2.pdf28 Jul 2017
Details of encumbrancesFile: Arihant Aashiyana_Loan Declaration.PDF28 Jul 2017
Copy of Layout Approval (in case of layout)File: LAYOUT 1.pdf28 Jul 2017
Copy of Layout Approval (in case of layout)File: LAYOUT 2.pdf28 Jul 2017
Building Plan Approval (IOD)File: Building Plan 1.pdf28 Jul 2017
Building Plan Approval (IOD)File: Building Plan 2.pdf28 Jul 2017
Building Plan Approval (IOD)File: Building Plan 3.pdf28 Jul 2017
Declaration in FORM BFile: FORM B_Arihant Aloki Phase II.pdf28 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arihant Aloki Phase II_AC.PDF28 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Arihant Aloki Phase II_EC.PDF28 Jul 2017
Certificates of CA (Form 3)File: Form 3 RERA Arihant Aloki Phase II.pdf28 Jul 2017
Proforma of Allotment letterFile: RERA AGREEMENT - Arihant Aloki Phase - II.pdf28 Jul 2017

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ARIHANT ALOKI PHASE II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Karjat5,900+ in Raigarh

2 kmARIHANT ALOKI PHASE IICompleted 29Lapsed / revoked 30Other 44Dot size: filed unitsN

Filed coordinates, straight-line distance. 103 registered projects within 2 km.

Builder: ARIHANT AASHIYANA PRIVATE LIMITED

ARIHANT AASHIYANA PRIVATE LIMITED has 12 registrations on MahaRERA, including ARIHANT ANSHULA and ARIHANT AMISHA PHASE I. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if ARIHANT ALOKI PHASE II is delayed beyond 30 Mar 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ARIHANT ALOKI PHASE II?

The registered promoter entity is ARIHANT AASHIYANA PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ARIHANT ALOKI PHASE II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against ARIHANT ALOKI PHASE II?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for ARIHANT ALOKI PHASE II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ARIHANT ALOKI PHASE II?

The professionals named in the filing: Architect: KIRAN K AWHALE; Architect: Yogita Bhandarkar; Engineer: Kaleem Sayyad. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ARIHANT ALOKI PHASE II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ARIHANT ALOKI PHASE II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ARIHANT ALOKI PHASE II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.