ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / Ariha One08

Registered No litigation declared Residential / Group Housing project

Ariha One08

By ARIHA SPACES LLP

RG-MH-23523 · RERA P51800078835 · Last updated on MahaRERA portal: 27 Apr 2026

Source: official MahaRERA filing

Red flags

  • Rs 35.00 crore secured on the land, in favour of Aditya Birla Capital Limited
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
2 of 11Construction stages donefurthest along: Slabs of Super Structure, 72%
12 of 18Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 60 documents Report an error

Ariha One08 is a Residential / Group Housing project by ARIHA SPACES LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800078835 on 13 Jan 2025. Possession is promised by 31 Dec 2027. 6 of the 18 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.

At a glance

Project

  • NameAriha One08
  • TypeResidential / Group Housing
  • Location
    • JAWAHAR NAGAR
    • GOREGAON WEST
    • Pahadi-Goregaon
    • Borivali
    • Mumbai Suburban
    • 400104
  • Pincode400104
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800078835
  • ReraGenie IDRG-MH-23523

Builder

  • NameARIHA SPACES LLP
  • Entity typeOthers
  • GSTIN27ABQFA4964L1ZQ

Key dates

this monthRegisteredJan 2025PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on13 Jan 2025
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed60 files

Current status

33%6 of 18 units booked
32.7%Work done, per cost certificate

Figures as on 27 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Ariha One08NA232118018

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 27 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 72%.

Ariha One08: 26% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure72%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises15%
Sanitary Fittings within the flats / premises2%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 27 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed40

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots40
Closed/Covered40

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area736 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofAditya Birla Capital Limited
Secured amountRs 35.00 crore
CERSAI search filedYes
Declared on27 Apr 2026

Approvals and building plan

Sanctioning authoritySLUM REHABILITATION AUTHORITY
Permissible FSI3971.99
Proposed, not sanctioned3,972 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPLOT NO.23, HAREVIBAI CHS UNNATI BUILDING, CAVES ROAD, NEAR JAIN TEMPLE, JOGESHWARI EAST 400060
Estimated costRs 22.00 cr
Cost incurredRs 7.19 cr
Work done32.68%
BuildingWingEstimatedIncurred
Ariha One08NARs 22.00 crRs 7.19 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectARCHPRO Architects Engineers & Consultants
EngineerFFRAMES CONSULTING CIVIL STRUCTURAL ENGINEERS PROJECT MANAGEMENT CONSULTANTS
EngineerARCHPRO Architects Engineers & Consultants
Chartered AccountantJOYSER & ASSOCIATES
Chartered AccountantCHAHAN VORA AND ASSOCIATES
PartnerRole in project
ARIHA SPACES LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Dec 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Oct 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Oct 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed60

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 March 2025.pdf27 Apr 2026
Form 2File: Form 2 March 2025.pdf27 Apr 2026
Form 3File: Form 3.pdf27 Apr 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 March 2025.pdf27 Apr 2026
Withdrawal Update Form 1File: Form 1 June 2025.pdf27 Apr 2026
Withdrawal Update Form 1File: Form 1 September 2025.pdf27 Apr 2026
Withdrawal Update Form 1File: Form 1 September 2025.pdf27 Apr 2026
Withdrawal Update Form 1File: Form 1 December 2025.pdf27 Apr 2026
Withdrawal Update Form 1File: Form 1 March 2026.pdf27 Apr 2026
Withdrawal Update Form 2File: Form 2 June 2025.pdf27 Apr 2026
Withdrawal Update Form 2File: Form 2 September 2025.pdf27 Apr 2026
Withdrawal Update Form 2File: Form 2 September 2025.pdf27 Apr 2026
Withdrawal Update Form 2File: Form 2 December 2025.pdf27 Apr 2026
Withdrawal Update Form 2File: Form 2 March 2026.pdf27 Apr 2026
Withdrawal Update Form 3File: Form 3.pdf27 Apr 2026
Withdrawal Update Form 3File: Form 3.pdf27 Apr 2026
Withdrawal Update Form 3File: Form 3.pdf27 Apr 2026
Withdrawal Update Form 3File: Form 3.pdf27 Apr 2026
Withdrawal Update Form 3File: Form 3.pdf27 Apr 2026
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - Form 3 - Ariha One08 - Ariha Spaces.pdf3 Jan 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format - B.pdf2 Jan 2025
Declaration about Commencement CertificateFile: Format D - Declaration about CC ONE8.pdf30 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: Ariha spaces LLP plinth sale CC with datet.pdf27 Dec 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A - Bank Letter - Promoter - Ariha Spaces LLP.pdf23 Dec 2024
Proforma of Allotment letterFile: ALLOTMENT LETTER - One08.pdf18 Dec 2024
Copy of the legal title reportFile: RERA Title_Plot 131_1-9.pdf17 Dec 2024
Details of encumbrances concerned to FinanceFile: Encumbrances - Legal and Finance.pdf17 Dec 2024
Details of encumbrances concerned to LegalFile: Encumbrances - Legal and Finance.pdf17 Dec 2024
Declaration in FORM BFile: FORM B - ARIHA ONE08 1-1.pdf18 Nov 2024
CERSAI detailsFile: CERSAI Report.pdf18 Nov 2024
Other - LegalFile: Lease Deed- 001-050.pdf13 Nov 2024
Other - LegalFile: Lease Deed- 051-100.pdf13 Nov 2024
Other - LegalFile: Lease Deed- 101-150.pdf13 Nov 2024
Other - LegalFile: Lease Deed- 151-200.pdf13 Nov 2024
Other - LegalFile: Lease Deed- 201-237.pdf13 Nov 2024
Other - LegalFile: Jawahar Nagar NOC - Plot 131.pdf13 Nov 2024
Other - LegalFile: PRC.pdf13 Nov 2024
Building plan approvalFile: IOA - Plot 131- Sept 2024-11.pdf30 Oct 2024
Building plan approvalFile: IOA - Plot 131- Sept 2024-10.pdf30 Oct 2024
Building plan approvalFile: Plot 131.pdf30 Oct 2024
Building plan approvalFile: IOA - Plot 131- Sept 2024-1-8.pdf30 Oct 2024
Layout approvalFile: Plot 131.pdf30 Oct 2024
PAN CardFile: Pan Card- Ariha Spaces.pdf30 Oct 2024
Copy of the legal title reportFile: RERA Title_Plot 131_1 to 9.pdf30 Oct 2024
Copy of the legal title reportFile: RERA Title_Plot 131_10 to 19.pdf30 Oct 2024
Details of encumbrances concerned to FinanceFile: Encumbrances - Legal and Finance_0001.pdf30 Oct 2024
Copy of Layout Approval (in case of layout)File: Plot 131.pdf30 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Architect Certificate.pdf30 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Engineer Certificate.pdf30 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: IOA - Plot 131- Sept 2024-1-8.pdf30 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: Plot 131.pdf30 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: IOA - Plot 131- Sept 2024-10.pdf30 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: IOA - Plot 131- Sept 2024-11.pdf30 Oct 2024
Deviation Report with respect to Allotment letterFile: No Deviation - Allotment_0001.pdf30 Oct 2024
Details of encumbrances concerned to LegalFile: Encumbrances - Legal and Finance_0001.pdf30 Oct 2024
Other - TechnicalFile: Annexure A (Order 50 of 2024)_Declaration cum Undertaking about Single Registration - Plot30 Oct 2024
Deviation Report with respect to model copy of AgreementFile: Deviation - AFS.pdf30 Oct 2024
Proforma of Agreement for saleFile: RERA AFS_Ariha Spaces (131).pdf30 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure Of Interest - Ariha One08.pdf30 Oct 2024
Disclosure for secured/unsecured finance availed for the projectFile: Secure-Unsecure Loan_0001.pdf30 Oct 2024

How this compares with Mumbai Suburban

33%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Ariha One08 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near GOREGAON WEST6,700+ in Mumbai Suburban

2 kmAriha One08Completed 143Lapsed / revoked 66Other 145Dot size: filed unitsN

Filed coordinates, straight-line distance. 354 registered projects within 2 km.

Builder: ARIHA SPACES LLP

ARIHA SPACES LLP has 1 registration on MahaRERA, including Ariha One08. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Ariha One08 is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Ariha One08?

The registered promoter entity is ARIHA SPACES LLP, an others as per the filing. Its GSTIN 27ABQFA4964L1ZQ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Ariha One08?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Ariha One08?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Ariha One08?

The professionals named in the filing: Architect: ARCHPRO Architects Engineers & Consultants; Engineer: FFRAMES CONSULTING CIVIL STRUCTURAL ENGINEERS PROJECT MANAGEMENT CONSULTANTS; Engineer: ARCHPRO Architects Engineers & Consultants; Chartered Accountant: JOYSER & ASSOCIATES; Chartered Accountant: CHAHAN VORA AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Ariha One08?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Ariha One08. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Ariha One08 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.