ReraGenieLog inGet a buyer report

Home / Browse projects / Gandhinagar, Gujarat / Ariane Legacy

Valid until 31 Dec 2023 Commercial project

Ariane Legacy

By Ariane Reality LLP

RG-GJ-89255 · RERA PR/GJ/GANDHINAGAR/GANDHINAGAR/Others/CAA08271/260321 · Last updated on GujRERA portal: 7 Jul 2022

Source: official GujRERA filing

Red flags

  • No red flags in this filing

Clear

  • Completion date never moved
  • Separate project account declared
Dec 2023Possession promisedno revision filed
3 of 8Construction stages donefurthest along: Staircases, 99%
80 of 82Units unsoldnot recorded sold or booked
Jump to the 44 documents Report an error

Ariane Legacy is a Commercial project by Ariane Reality LLP in Gandhinagar, Gujarat, registered with GujRERA as PR/GJ/GANDHINAGAR/GANDHINAGAR/Others/CAA08271/260321 on 26 Mar 2021. Possession is promised by 31 Dec 2023. 2 of the 82 units on this registration are recorded sold or booked, and 3 of 8 construction stages are filed complete.

At a glance

Project

  • NameAriane Legacy
  • TypeCommercial
  • Location
    • Ariane Legacy
    • Nr Maharaj Hotel
    • S G Highway
    • Adalaj
    • Ahmedabad
    • Gandhinagar
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/GANDHINAGAR/GANDHINAGAR/Others/CAA08271/260321
  • ReraGenie IDRG-GJ-89255

Builder

  • NameAriane Reality LLP
  • Entity typeLIMITED LIABILITY PARTNERSHIP FIRM

Key dates

this monthRegisteredMar 2021PromisedDec 2023

Key facts

Registration and timeline

  • StatusValid until 31 Dec 2023
  • Registered on26 Mar 2021
  • Promised completion31 Dec 2023
  • Revised completionNone
  • Buildings1 building record
  • Documents filed44 files

Current status

2%2 of 82 units booked
75.7%Of the estimated cost spent so far

Figures as on 7 Jul 2022, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Ariane Legacy---08282

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building1

As on 7 Jul 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 8 construction stages are filed complete. The stage furthest along is Staircases, at 99%.

Ariane Legacy: 86% average across the applicable activities

ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats97%
Sanitary fittings within the flats40%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks99%
External plumbing and external plaster, elevation, completion of terraces with waterproofing95%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing60%

Progress on shared amenities19

As on 7 Jul 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes40%
Water supplyYes70%
Sewerage (chamber, lines, septic tank, STP)Yes55%
Storm water drainsYes45%
Landscaping and tree plantingYes0%
Street lightingYes0%
Community buildingsNoNot applicable
Treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingYes10%
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes15%
Electrical meter room, sub-station, receiving stationYes35%
Fire fightingYes15%
Drinking water facilitiesNoNot applicable
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityYes0%
Letter boxNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,926 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 11.25 cr
Cost incurredRs 8.51 cr
Spent of the estimate75.67%
BuildingWingEstimatedIncurred
Ariane LegacyNARs 11.25 crRs 8.51 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSagar C Patel
EngineerNarendra K Patel

Documents filed44

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/GANDHINAGAR/GANDHINAGAR/Others/CAA08271/260321 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Accountant's certificate (Form 3)7 Jul 2022
Architect's certificate (Form 1)6 Jul 2022
Engineer's certificate (Form 2)6 Jul 2022
Engineer's certificate annexure6 Jul 2022
Site photograph, Ariane Legacy6 Jul 2022
Site photograph, Ariane Legacy6 Jul 2022
Site photograph, Ariane Legacy6 Jul 2022
Site photograph, Ariane Legacy6 Jul 2022
RERA registration certificate26 Mar 2021
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Title clearance certificate-
Title report-
Property card-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Gandhinagar

2%of this project is bookeddistrict median 53%
16%of Gandhinagar projects moved their completion datethis one has not

Computed across the 1,600+ Gandhinagar projects on ReraGenie, from their own filings.

Keep Ariane Legacy on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Gandhinagar1,600+ in Gandhinagar

2 kmAriane LegacyOther 35Dot size: filed unitsN

Filed coordinates, straight-line distance. 35 registered projects within 2 km.

Builder: Ariane Reality LLP

Ariane Reality LLP has 1 registration on GujRERA, including Ariane Legacy. Read the full track record. See more projects on the Gandhinagar district page.

Frequently asked questions

What are my rights if Ariane Legacy is delayed beyond 31 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of Ariane Legacy?

The registered promoter entity is Ariane Reality LLP, a limited liability partnership firm as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in Ariane Legacy?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Ariane Legacy?

The professionals named in the filing: Architect: Sagar C Patel; Engineer: Narendra K Patel. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Ariane Legacy?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Ariane Legacy. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Ariane Legacy to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.