Home / Browse projects / Mumbai Suburban, Maharashtra / ARIANA RESIDENCY
ARIANA RESIDENCY
RG-MH-20021 · RERA P51800008691 · Last updated on MahaRERA portal: 18 Apr 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 46 months past the filed date
- 25 complaints at MahaRERA
- Completion date moved by 18 months
- 1 extension taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
ARIANA RESIDENCY is a Residential / Group Housing project by J V REALTY AND DEVELOPERS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800008691 on 19 Aug 2017. Possession was promised by 30 Dec 2022 and is now 46 months past that date. The completion date has moved by 18 months from the original filing. 25 complaints are on record with the regulator.
At a glance
Project
- NameARIANA RESIDENCY
- TypeResidential / Group Housing
- Location
- Sant Gora Kumbhar Road
- Devipada
- Borivali (East)
- Borivali
- Mumbai Suburban
- 400066
- Pincode400066
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800008691
- ReraGenie IDRG-MH-20021
Builder
- NameJ V REALTY AND DEVELOPERS
- Entity typeOthers
- Named personsPPMS Real Estates LLP, DOTOM URBAN SPACE LLP
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on19 Aug 2017
- Promised completion30 Dec 2022
- Revised completionRevised to 30 Dec 2022 (originally 30 Jun 2021)
- Buildings3 building records
- Documents filed122 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| ARIANA RESIDENCY WING-A SALE | NA | 26 | 0 | 0 | 0 | 0 |
| ARIANA RESIDENCY WING-B SALE | NA | 26 | 0 | 0 | 0 | 0 |
| ARIANA RESIDENCY WING-C SALE | NA | 26 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 18 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
24 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is External plumbing and external plaster, at 95%.
ARIANA RESIDENCY WING-A SALE70%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
ARIANA RESIDENCY WING-B SALE82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
ARIANA RESIDENCY WING-C SALE82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities20
As on 18 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 90% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 80% |
| Landscaping & Tree Planting | Yes | 80% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 80% |
| Electrical meter room, sub-station, receiving station | Yes | 80% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
| Entrance Lobby | Yes | 75% |
| Elevators | Yes | 75% |
| 24x7 CCTV FACILITY | Yes | 70% |
| FITNESS CENTRE | Yes | 100% |
| SOCIETY OFFICE | Yes | 0% |
Parking filed53
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| ARIANA RESIDENCY WING-A SALE | 20 | 20 |
| ARIANA RESIDENCY WING-B SALE | 17 | 17 |
| ARIANA RESIDENCY WING-C SALE | 16 | 16 |
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| AMEY JAGDISH RANE | Borivali | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | DOT ARCHITECTS |
| Engineer | Gireesh Rajadhyaksha |
| Partner | Role in project |
|---|---|
| J V REALTY AND DEVELOPERS | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterApart from impact of pandemic, overall progress of construction of Project was dragged on account of certain adversary and restraining orders passed by Hon’ble Bombay High Court which was completely beyond our control which resulted in delay in completion of the Project. In February, 2017 plans were approved by authorities and they also issued plinth CC for construction of Bldg no. 9 comprising of Wings A to D. Simultaneously we also started construction of Bldg no. 10 on said Property which was meant for PAP tenements to be handed over to authorities as same was one of the conditions of the r
Litigation declared6
| Case | Court | Status |
|---|---|---|
| 2180/1997 | MUMBAI HIGH COURT | DECREED |
| CC/15/457/2015 | State Consumer Disputes Redressal Commission Maharashtra Mumbai | Pending |
| CC/15/458/2015 | State Consumer Disputes Redressal Commission Maharashtra Mumbai | Pending |
| CC/16/404/2016 | State Consumer Disputes Redressal Commission Maharashtra Mumbai | Pending |
| CC/16/402/2016 | State Consumer Disputes Redressal Commission Maharashtra Mumbai | Pending |
| CC/16/403/2016 | State Consumer Disputes Redressal Commission Maharashtra Mumbai | Pending |
Complaints filed with MahaRERA25
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000000949 | Kamalkant Bajranglal Poddar | J V Realty and Developers & Ors | 28/09/2017 |
| CC006000000395969 | poojan mehta | J V Realty and Developers | 04/06/2023 |
| CC006000000396559 | Ashok Shrimant Hirgond | JV realty | 07/07/2023 |
| CC006000000396563 | Deepak Vitthal Rawool | JV Realty & Developers | 06/07/2023 |
| CC006000000396565 | Rupesh Parab | JV Realty and Devlopers | 06/07/2023 |
| CC006000000396582 | Prakash Patil | JV Realty | 06/07/2023 |
| CC006000000396545 | Hirendra Tivarekar | JV Realty & Developers | 06/07/2023 |
| CC006000000396564 | Dilip Rambachan Gupta | JV Realty and Developers | 05/07/2023 |
| CC006000000396562 | Darpan Dattaram Hande | JV Reality and Developers | 06/07/2023 |
| CC006000000396557 | Amit Bharat Parkar | JV Realty & Developers | 06/07/2023 |
| CC006000000396561 | Kishor Vasant Palav | JV Realty | 07/07/2023 |
| CC006000000396597 | Amit Jotiram Salunkhe | JV realty | 07/07/2023 |
| CC006000000396567 | Avinash Savlaram Waghmare | JV Realty & Developers | 06/07/2023 |
| CC006000000396571 | Shatrughan Krishna Kadam | JV Realty | 06/07/2023 |
| CC006000000396572 | Shashikant Suresh Sawant | JV Realty & Developers | 06/07/2023 |
| CC006000000396585 | Aditya Arvind Pawar | JV realty | 07/07/2023 |
| CC006000000396584 | Sandeep Maurya | JV Realty & Developers | 26/07/2023 |
| CC006000000396674 | AMAR HARIRAM ROHRA | JV Realty and Developers | 12/07/2023 |
| CC006000000397552 | J.V.REALTY AND DEVELOPERS | Mr.Girish Manchanda and Miss Alka Gaba | 27/09/2023 |
| CC006000000429511 | Shivapushpa Kathirvel Nadar | Paradigm Realty | 03/03/2024 |
| CC006000000408496 | Anisha Frank Rodrigues | M/s. J.V. Realty and developers. | 20/12/2023 |
| CC006000000428919 | varsha aditya pawar | JV REALITY AND DEVELOPERS | 20/01/2024 |
| CC006000000428931 | SNEHAL TONY LOPES | M/s. J.V. Realty and developers. | 22/01/2024 |
| CC006000000428951 | ABHAY BABAN PAWAR | M/s. J.V. Realty and developers. | 24/01/2024 |
| CC12502622 | Girish Manchanda | J V REALTY AND DEVELOPERS | 29/07/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 23 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 7 Jul 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 7 Jul 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 27 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 17 Jun 2022
Documents filed122
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 122 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Disclosure of sold/ booked inventoryFile: Ariana sold unsold till Dec 2024.pdf | 18 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Ariana sold unsold till March 2025.pdf | 18 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Artteza sold unsold till Dec 2024.pdf | 6 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Ariana sold unsold till sept 2024.pdf | 30 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Ariana Sold unsold till June 2024.pdf | 5 Aug 2024 |
| Declaration in FORM BFile: FORM B - DECLARATION - JV Realty NEW.pdf | 22 Jul 2024 |
| Declaration in FORM BFile: FORM B - DECLARATION - JVRealty 16-07-2024.pdf | 22 Jul 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARIANA RESIDENCY ARCHITECT CERTIFICATE 31-10-2023.pdf | 22 Jul 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARIANA RESIDENCY ARCHITECT CERTIFICATE 31-01-2024.pdf | 22 Jul 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARIANA RESIDENCY ARCHITECT CERTIFICATE 30-04-2024.pdf | 22 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2022-09-30__Quality Assurance Certificate - ariana.pdf | 22 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2022-12-31__Quality Assurance Certificate - ariana.pdf | 22 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2023-03-31__Quality Assurance Certificate - ariana.pdf | 22 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2023-06-30__Quality Assurance Certificate - ariana.pdf | 22 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2023-09-30__Quality Assurance Certificate - ariana.pdf | 22 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2023-12-31__Quality Assurance Certificate - ariana.pdf | 22 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2024-03-31__Quality Assurance Certificate - ariana.pdf | 22 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2024-06-30__Quality Assurance Certificate - ariana.pdf | 22 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Ariana sold unsold inventory Mar 2024.pdf | 5 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: Artteza sold unsold inventory till spet 2023.pdf | 28 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Artteza sold unsold - Dec 2023.pdf | 28 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Ariana sold unsold inventory till sept 2023.pdf | 28 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Ariana sold unsold - Dec 2023.pdf | 28 Feb 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Ariana Revalidated CC.pdf | 27 Oct 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Ariana - Form 1.pdf | 2 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: Ariana Sold Unsold till 30th June 2023.pdf | 18 Aug 2023 |
| Declaration about Commencement CertificateFile: Declaration on CC.pdf | 24 Jul 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate Q2-23-6-2023_compressed.pdf | 28 Jun 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate Q3-23-6-2023_compressed.pdf | 28 Jun 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate Q4-23-6-2023_compressed.pdf | 28 Jun 2023 |
| Form 2AFile: Ariana -Form 2A.pdf | 28 Jun 2023 |
| Certificates of CA (Form 3)File: Form 3 - RERA - Ariana Q3 Dec 2022_signed (1)_compressed.pdf | 28 Jun 2023 |
| Certificates of CA (Form 3)File: Form 3 - RERA - Ariana Q3 Dec 2022_signed_compressed.pdf | 28 Jun 2023 |
| Certificates of CA (Form 5)File: Ariana Form 5 - March 22.pdf | 28 Jun 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Assurance - March, 2020.pdf | 12 Jun 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance - March, 2021.pdf | 12 Jun 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance - March, 2022.pdf | 12 Jun 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance - March, 2023.pdf | 12 Jun 2023 |
| Certificates of CA (Form 3)File: Form 3 - RERA - Ariana Q3 Dec 2022.pdf | 12 Jun 2023 |
| Certificates of CA (Form 3)File: Form 3 - RERA - Ariana Q4 Mar 2023.pdf | 12 Jun 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARIANA RESIDENCY ARCHITECT CERTIFICATE 31-04-2023.pdf | 1 May 2023 |
| Form 2AFile: quality assurance - ariana -30-09-2021 (1).pdf | 1 May 2023 |
| Disclosure of sold/ booked inventoryFile: Ariana - Sold-Unsold.pdf | 1 May 2023 |
| Disclosure of sold/ booked inventoryFile: Ariana Resi Sold Unsold Dec, 2022.pdf | 30 Mar 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARIANA RESIDENCY ARCHITECT CERTIFICATE 31-12-2022.pdf | 27 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: ariana 19-20.pdf | 27 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: ariana 20 -21.pdf | 27 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Ariana Form 5 - March 22.pdf | 13 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 JV realty March 22.pdf | 8 Jul 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Jv realty June 22.pdf | 8 Jul 2022 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Ariana part OC.PDF | 17 Jun 2022 |
| Disclosure of sold/ booked inventoryFile: Ariana INventory.pdf | 11 May 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARIANA ARCHITECT CERTIFICATE -30-12-2021.pdf | 9 Mar 2022 |
| Disclosure of sold/ booked inventoryFile: ariana.pdf | 18 Feb 2022 |
| Disclosure of sold/ booked inventoryFile: SOLD-UNSOLD ariana.pdf | 26 Oct 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect certificate - june 2021.pdf | 28 Jul 2021 |
| Form 2AFile: quality assurance - ariana -30-09-2019 (1).pdf | 17 Jul 2021 |
| Form 2AFile: quality assurance - ariana -31-03-2020.pdf | 15 Jul 2021 |
| Form 2AFile: quality assurance - ariana -30-6-2020.pdf | 15 Jul 2021 |
| Form 2AFile: quality assurance - ariana -30-09-2020.pdf | 15 Jul 2021 |
| Form 2AFile: quality assurance - ariana -31-12-2020.pdf | 15 Jul 2021 |
| Disclosure of sold/ booked inventoryFile: Ariana Sold - Unsold.pdf | 13 Jul 2021 |
| Certificates of CA (Form 5)File: ARIANA form 5_compressed.pdf | 12 Jul 2021 |
| Building plan approvalFile: IOA Letter.pdf | 7 Jul 2021 |
| Building plan approvalFile: Page 1.pdf | 7 Jul 2021 |
| Layout approvalFile: SKMBT_C224e18122901090_compressed.pdf | 7 Jul 2021 |
| Copy of Layout Approval (in case of layout)File: SKMBT_C224e18122901090_compressed.pdf | 7 Jul 2021 |
| Building Plan Approval (IOD)File: IOA Letter.pdf | 7 Jul 2021 |
| Building Plan Approval (IOD)File: Page 1.pdf | 7 Jul 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: CC (3).pdf | 7 Jul 2021 |
| Declaration about Commencement CertificateFile: Declaration On cc.pdf | 7 Jul 2021 |
| Form 2AFile: quality assurance - ariana -30-6-2021.pdf | 7 Jul 2021 |
| Form 2AFile: quality assurance - ariana -31-03-2021.pdf | 7 Jul 2021 |
| Certificates of CA (Form 5)File: Form 5- JVRD- Ariana Residency Mar-21_compressed.pdf | 7 Jul 2021 |
| Certificates of CA (Form 3)File: CA certificate ARiana.pdf | 6 Jul 2021 |
| Disclosure of sold/ booked inventoryFile: Ariana.pdf | 2 Jul 2021 |
| Certificates of CA (Form 3)File: Form 3 Ariana Residency compressed.pdf | 8 Feb 2021 |
| Details of encumbrancesFile: scanned copy of no encumbrance JV Realty.pdf | 21 Dec 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 3 JV Realty 30032020.pdf | 11 Nov 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 3 JV Realty 30062020.pdf | 11 Nov 2020 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 122 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep ARIANA RESIDENCY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Devipada, Borivali (East)6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 306 registered projects within 2 km.
Shraddha Park City
Shraddha Prime Projects Limited
GREENAIRY
SAROJ LANDMARK REALTY LLP
Sky City Tower H
Incline Realty Private Limited
Sky City Tower G
Incline Realty Private Limited
SHEETAL REGALIA
D G S TOWNSHIP PRIVATE LIMITED
JANGID ELYSIUM
IMPRINT CONSTRUCTION PRIVATE LIMITED
See every Mumbai Suburban project, with the district possession charts
Builder: J V REALTY AND DEVELOPERS
J V REALTY AND DEVELOPERS has 1 registration on MahaRERA, including ARIANA RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What does it mean that ARIANA RESIDENCY shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if ARIANA RESIDENCY is delayed beyond 30 Dec 2022?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of ARIANA RESIDENCY?
The registered promoter entity is J V REALTY AND DEVELOPERS, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in ARIANA RESIDENCY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against ARIANA RESIDENCY?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for ARIANA RESIDENCY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at ARIANA RESIDENCY?
The professionals named in the filing: Architect: DOT ARCHITECTS; Engineer: Gireesh Rajadhyaksha. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ARIANA RESIDENCY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback