Home / Browse projects / Mumbai Suburban, Maharashtra / ARIANA RESIDENCY

Registration lapsed No litigation declared Residential / Group Housing project

ARIANA RESIDENCY

By J V REALTY AND DEVELOPERS

RG-MH-20021 · RERA P51800008691 · Last updated on MahaRERA portal: 18 Apr 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 46 months past the filed date
  • 25 complaints at MahaRERA
  • Completion date moved by 18 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2022Possession promised46 months past this date
24 of 33Construction stages doneacross 3 buildings; furthest along: External plumbing and external plaster, 95%
25Complaints at MahaRERAon this registration
Jump to the 122 documents Report an error

ARIANA RESIDENCY is a Residential / Group Housing project by J V REALTY AND DEVELOPERS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800008691 on 19 Aug 2017. Possession was promised by 30 Dec 2022 and is now 46 months past that date. The completion date has moved by 18 months from the original filing. 25 complaints are on record with the regulator.

At a glance

Project

  • NameARIANA RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • Sant Gora Kumbhar Road
    • Devipada
    • Borivali (East)
    • Borivali
    • Mumbai Suburban
    • 400066
  • Pincode400066
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800008691
  • ReraGenie IDRG-MH-20021

Builder

  • NameJ V REALTY AND DEVELOPERS
  • Entity typeOthers
  • Named personsPPMS Real Estates LLP, DOTOM URBAN SPACE LLP

Key dates

46 months past promisethis monthRegisteredAug 2017First promiseJun 2021Revised toDec 2022

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on19 Aug 2017
  • Promised completion30 Dec 2022
  • Revised completionRevised to 30 Dec 2022 (originally 30 Jun 2021)
  • Buildings3 building records
  • Documents filed122 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ARIANA RESIDENCY WING-A SALENA260000
ARIANA RESIDENCY WING-B SALENA260000
ARIANA RESIDENCY WING-C SALENA260000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 18 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

24 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is External plumbing and external plaster, at 95%.

ARIANA RESIDENCY WING-A SALE70%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%
ARIANA RESIDENCY WING-B SALE82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ARIANA RESIDENCY WING-C SALE82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities20

As on 18 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes80%
Landscaping & Tree PlantingYes80%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes80%
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable
Entrance LobbyYes75%
ElevatorsYes75%
24x7 CCTV FACILITYYes70%
FITNESS CENTREYes100%
SOCIETY OFFICEYes0%

Parking filed53

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots53
Closed/Covered53
BuildingClosed/CoveredTotal
ARIANA RESIDENCY WING-A SALE2020
ARIANA RESIDENCY WING-B SALE1717
ARIANA RESIDENCY WING-C SALE1616

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,224 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
AMEY JAGDISH RANEBorivaliMumbai Suburban

Approvals and building plan

Permissible FSI14494.0
Proposed, not sanctioned14,494 sq m
Buildings approved4
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSana Building, Linking Road, Santacruz West, Mumbai 400054

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDOT ARCHITECTS
EngineerGireesh Rajadhyaksha
PartnerRole in project
J V REALTY AND DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800010213Jun 2021 → Jun 2022

Reason as filed by the promoterApart from impact of pandemic, overall progress of construction of Project was dragged on account of certain adversary and restraining orders passed by Hon’ble Bombay High Court which was completely beyond our control which resulted in delay in completion of the Project. In February, 2017 plans were approved by authorities and they also issued plinth CC for construction of Bldg no. 9 comprising of Wings A to D. Simultaneously we also started construction of Bldg no. 10 on said Property which was meant for PAP tenements to be handed over to authorities as same was one of the conditions of the r

Litigation declared6

CaseCourtStatus
2180/1997MUMBAI HIGH COURTDECREED
CC/15/457/2015State Consumer Disputes Redressal Commission Maharashtra MumbaiPending
CC/15/458/2015State Consumer Disputes Redressal Commission Maharashtra MumbaiPending
CC/16/404/2016State Consumer Disputes Redressal Commission Maharashtra MumbaiPending
CC/16/402/2016State Consumer Disputes Redressal Commission Maharashtra MumbaiPending
CC/16/403/2016State Consumer Disputes Redressal Commission Maharashtra MumbaiPending

Complaints filed with MahaRERA25

Case no.ComplainantRespondentFiled
CC006000000000949Kamalkant Bajranglal PoddarJ V Realty and Developers & Ors28/09/2017
CC006000000395969poojan mehtaJ V Realty and Developers04/06/2023
CC006000000396559Ashok Shrimant HirgondJV realty07/07/2023
CC006000000396563Deepak Vitthal RawoolJV Realty & Developers06/07/2023
CC006000000396565Rupesh ParabJV Realty and Devlopers06/07/2023
CC006000000396582Prakash PatilJV Realty06/07/2023
CC006000000396545Hirendra TivarekarJV Realty & Developers06/07/2023
CC006000000396564Dilip Rambachan GuptaJV Realty and Developers05/07/2023
CC006000000396562Darpan Dattaram HandeJV Reality and Developers06/07/2023
CC006000000396557Amit Bharat ParkarJV Realty & Developers06/07/2023
CC006000000396561Kishor Vasant PalavJV Realty07/07/2023
CC006000000396597Amit Jotiram SalunkheJV realty07/07/2023
CC006000000396567Avinash Savlaram WaghmareJV Realty & Developers06/07/2023
CC006000000396571Shatrughan Krishna KadamJV Realty06/07/2023
CC006000000396572Shashikant Suresh SawantJV Realty & Developers06/07/2023
CC006000000396585Aditya Arvind PawarJV realty07/07/2023
CC006000000396584Sandeep MauryaJV Realty & Developers26/07/2023
CC006000000396674AMAR HARIRAM ROHRAJV Realty and Developers12/07/2023
CC006000000397552J.V.REALTY AND DEVELOPERSMr.Girish Manchanda and Miss Alka Gaba27/09/2023
CC006000000429511Shivapushpa Kathirvel NadarParadigm Realty03/03/2024
CC006000000408496Anisha Frank RodriguesM/s. J.V. Realty and developers.20/12/2023
CC006000000428919varsha aditya pawarJV REALITY AND DEVELOPERS20/01/2024
CC006000000428931SNEHAL TONY LOPESM/s. J.V. Realty and developers.22/01/2024
CC006000000428951ABHAY BABAN PAWARM/s. J.V. Realty and developers.24/01/2024
CC12502622Girish ManchandaJ V REALTY AND DEVELOPERS29/07/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Jul 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Jul 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 17 Jun 2022

Documents filed122

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 122 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of sold/ booked inventoryFile: Ariana sold unsold till Dec 2024.pdf18 Apr 2025
Disclosure of sold/ booked inventoryFile: Ariana sold unsold till March 2025.pdf18 Apr 2025
Disclosure of sold/ booked inventoryFile: Artteza sold unsold till Dec 2024.pdf6 Feb 2025
Disclosure of sold/ booked inventoryFile: Ariana sold unsold till sept 2024.pdf30 Oct 2024
Disclosure of sold/ booked inventoryFile: Ariana Sold unsold till June 2024.pdf5 Aug 2024
Declaration in FORM BFile: FORM B - DECLARATION - JV Realty NEW.pdf22 Jul 2024
Declaration in FORM BFile: FORM B - DECLARATION - JVRealty 16-07-2024.pdf22 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARIANA RESIDENCY ARCHITECT CERTIFICATE 31-10-2023.pdf22 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARIANA RESIDENCY ARCHITECT CERTIFICATE 31-01-2024.pdf22 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARIANA RESIDENCY ARCHITECT CERTIFICATE 30-04-2024.pdf22 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2022-09-30__Quality Assurance Certificate - ariana.pdf22 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2022-12-31__Quality Assurance Certificate - ariana.pdf22 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2023-03-31__Quality Assurance Certificate - ariana.pdf22 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2023-06-30__Quality Assurance Certificate - ariana.pdf22 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2023-09-30__Quality Assurance Certificate - ariana.pdf22 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2023-12-31__Quality Assurance Certificate - ariana.pdf22 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2024-03-31__Quality Assurance Certificate - ariana.pdf22 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2024-06-30__Quality Assurance Certificate - ariana.pdf22 Jul 2024
Disclosure of sold/ booked inventoryFile: Ariana sold unsold inventory Mar 2024.pdf5 Jun 2024
Disclosure of sold/ booked inventoryFile: Artteza sold unsold inventory till spet 2023.pdf28 Feb 2024
Disclosure of sold/ booked inventoryFile: Artteza sold unsold - Dec 2023.pdf28 Feb 2024
Disclosure of sold/ booked inventoryFile: Ariana sold unsold inventory till sept 2023.pdf28 Feb 2024
Disclosure of sold/ booked inventoryFile: Ariana sold unsold - Dec 2023.pdf28 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: Ariana Revalidated CC.pdf27 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Ariana - Form 1.pdf2 Sep 2023
Disclosure of sold/ booked inventoryFile: Ariana Sold Unsold till 30th June 2023.pdf18 Aug 2023
Declaration about Commencement CertificateFile: Declaration on CC.pdf24 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate Q2-23-6-2023_compressed.pdf28 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate Q3-23-6-2023_compressed.pdf28 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate Q4-23-6-2023_compressed.pdf28 Jun 2023
Form 2AFile: Ariana -Form 2A.pdf28 Jun 2023
Certificates of CA (Form 3)File: Form 3 - RERA - Ariana Q3 Dec 2022_signed (1)_compressed.pdf28 Jun 2023
Certificates of CA (Form 3)File: Form 3 - RERA - Ariana Q3 Dec 2022_signed_compressed.pdf28 Jun 2023
Certificates of CA (Form 5)File: Ariana Form 5 - March 22.pdf28 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Assurance - March, 2020.pdf12 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance - March, 2021.pdf12 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance - March, 2022.pdf12 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance - March, 2023.pdf12 Jun 2023
Certificates of CA (Form 3)File: Form 3 - RERA - Ariana Q3 Dec 2022.pdf12 Jun 2023
Certificates of CA (Form 3)File: Form 3 - RERA - Ariana Q4 Mar 2023.pdf12 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARIANA RESIDENCY ARCHITECT CERTIFICATE 31-04-2023.pdf1 May 2023
Form 2AFile: quality assurance - ariana -30-09-2021 (1).pdf1 May 2023
Disclosure of sold/ booked inventoryFile: Ariana - Sold-Unsold.pdf1 May 2023
Disclosure of sold/ booked inventoryFile: Ariana Resi Sold Unsold Dec, 2022.pdf30 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARIANA RESIDENCY ARCHITECT CERTIFICATE 31-12-2022.pdf27 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: ariana 19-20.pdf27 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: ariana 20 -21.pdf27 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Ariana Form 5 - March 22.pdf13 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 JV realty March 22.pdf8 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Jv realty June 22.pdf8 Jul 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Ariana part OC.PDF17 Jun 2022
Disclosure of sold/ booked inventoryFile: Ariana INventory.pdf11 May 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARIANA ARCHITECT CERTIFICATE -30-12-2021.pdf9 Mar 2022
Disclosure of sold/ booked inventoryFile: ariana.pdf18 Feb 2022
Disclosure of sold/ booked inventoryFile: SOLD-UNSOLD ariana.pdf26 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect certificate - june 2021.pdf28 Jul 2021
Form 2AFile: quality assurance - ariana -30-09-2019 (1).pdf17 Jul 2021
Form 2AFile: quality assurance - ariana -31-03-2020.pdf15 Jul 2021
Form 2AFile: quality assurance - ariana -30-6-2020.pdf15 Jul 2021
Form 2AFile: quality assurance - ariana -30-09-2020.pdf15 Jul 2021
Form 2AFile: quality assurance - ariana -31-12-2020.pdf15 Jul 2021
Disclosure of sold/ booked inventoryFile: Ariana Sold - Unsold.pdf13 Jul 2021
Certificates of CA (Form 5)File: ARIANA form 5_compressed.pdf12 Jul 2021
Building plan approvalFile: IOA Letter.pdf7 Jul 2021
Building plan approvalFile: Page 1.pdf7 Jul 2021
Layout approvalFile: SKMBT_C224e18122901090_compressed.pdf7 Jul 2021
Copy of Layout Approval (in case of layout)File: SKMBT_C224e18122901090_compressed.pdf7 Jul 2021
Building Plan Approval (IOD)File: IOA Letter.pdf7 Jul 2021
Building Plan Approval (IOD)File: Page 1.pdf7 Jul 2021
Commencement Certificates / NA Order for plotted developmentFile: CC (3).pdf7 Jul 2021
Declaration about Commencement CertificateFile: Declaration On cc.pdf7 Jul 2021
Form 2AFile: quality assurance - ariana -30-6-2021.pdf7 Jul 2021
Form 2AFile: quality assurance - ariana -31-03-2021.pdf7 Jul 2021
Certificates of CA (Form 5)File: Form 5- JVRD- Ariana Residency Mar-21_compressed.pdf7 Jul 2021
Certificates of CA (Form 3)File: CA certificate ARiana.pdf6 Jul 2021
Disclosure of sold/ booked inventoryFile: Ariana.pdf2 Jul 2021
Certificates of CA (Form 3)File: Form 3 Ariana Residency compressed.pdf8 Feb 2021
Details of encumbrancesFile: scanned copy of no encumbrance JV Realty.pdf21 Dec 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 3 JV Realty 30032020.pdf11 Nov 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 3 JV Realty 30062020.pdf11 Nov 2020

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 18 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ARIANA RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Devipada, Borivali (East)6,700+ in Mumbai Suburban

2 kmARIANA RESIDENCYCompleted 101Lapsed / revoked 59Other 146Dot size: filed unitsN

Filed coordinates, straight-line distance. 306 registered projects within 2 km.

Builder: J V REALTY AND DEVELOPERS

J V REALTY AND DEVELOPERS has 1 registration on MahaRERA, including ARIANA RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that ARIANA RESIDENCY shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if ARIANA RESIDENCY is delayed beyond 30 Dec 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ARIANA RESIDENCY?

The registered promoter entity is J V REALTY AND DEVELOPERS, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ARIANA RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against ARIANA RESIDENCY?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for ARIANA RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ARIANA RESIDENCY?

The professionals named in the filing: Architect: DOT ARCHITECTS; Engineer: Gireesh Rajadhyaksha. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ARIANA RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ARIANA RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ARIANA RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.