Home / Browse projects / Sindhudurg, Maharashtra / Aradhana Samarpan
Aradhana Samarpan
RG-MH-28274 · RERA P52900029515 · Last updated on MahaRERA portal: 15 Nov 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Rs 2.50 crore secured on the land, in favour of pathpedhi
- The declared charge does not appear in the CERSAI report on the filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Sindhudurg registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Aradhana Samarpan is a Others project by AARWANA DEVELOPERS in Sindhudurg, Maharashtra, registered with MahaRERA as P52900029515 on 4 Jun 2021. Possession is promised by 31 Mar 2030.
At a glance
Project
- NameAradhana Samarpan
- TypeOthers
- Location
- VENGURLA BANDAR ROAD
- Vengurla (M Cl)
- Vengurla
- Sindhudurg
- 416516
- Pincode416516
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52900029515
- ReraGenie IDRG-MH-28274
Builder
- NameAARWANA DEVELOPERS
- Entity typeOthers
- Named personNILESH THAKUR
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on4 Jun 2021
- Promised completion31 Mar 2030
- Revised completionNone
- Buildings3 building records
- Documents filed112 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| ARADHANA SAMARPAN-1 | NA | 9 | 0 | 0 | 0 | 0 |
| ARADHANA SAMARPAN-2 | NA | 3 | 0 | 0 | 0 | 0 |
| ARADHANA SAMARPAN-3 | NA | 5 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 15 Nov 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Excavation, at 90%.
ARADHANA SAMARPAN-167%
| Activity | Progress |
|---|---|
| Excavation | 90% |
| Basement (if any) | 90% |
| Podiums (if any) | 0% |
| Plinth | 90% |
| Stilt Floor | 90% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 70% |
| Sanitary Fittings within the flats / premises | 20% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 85% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50% |
ARADHANA SAMARPAN-267%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 80% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 85% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 85% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 85% |
ARADHANA SAMARPAN-37%
| Activity | Progress |
|---|---|
| Excavation | 80% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 15 Nov 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 50% |
| Water Supply | Yes | 50% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 50% |
| Storm Water Drains | Yes | 50% |
| Landscaping & Tree Planting | Yes | 60% |
| Street Lighting | Yes | 50% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 50% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 50% |
| Electrical meter room, sub-station, receiving station | Yes | 50% |
| Aggregate area of recreational Open Space | Yes | 50% |
| Open Parking | Yes | 50% |
Parking filed22
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| ARADHANA SAMARPAN-1 | 1 | 11 | 12 |
| ARADHANA SAMARPAN-3 | 0 | 10 | 10 |
Land and ownership1
MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
| Landowner | Village | District |
|---|---|---|
| NILESH THAKUR | Borivali | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MR AMIT KAMAT |
| Engineer | MR Sandeep Shetye |
| Chartered Accountant | Prashant Apraj |
| Partner | Role in project |
|---|---|
| AARWANA DEVELOPERS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 26 May 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 25 Oct 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 10 Aug 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 10 Aug 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 19 Feb 2025
Documents filed112
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 112 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2File: form 2 dec 24.pdf | 15 Nov 2025 |
| Form 1File: form 1 architects certificate qly March2025.pdf | 15 Nov 2025 |
| Form 3File: march 2025 Form 5 Arawana.pdf | 15 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: March 2025 Aarwana Developers sale list.pdf | 15 Nov 2025 |
| Form 1File: form 1 architects certificate qly dec 2024.pdf | 7 Nov 2025 |
| Form 2File: form 2 dec 24.pdf | 7 Nov 2025 |
| Form 3File: form3 ca.pdf | 7 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: SALE UNSOLD dec 2024.pdf | 7 Nov 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 architects certificate qly dec 2024.pdf | 3 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form3 ca.pdf | 21 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineers cert march 2025.pdf | 21 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form3 19022025_compressed.pdf | 19 Feb 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: ROW HOUSE OC.pdf | 19 Feb 2025 |
| CERSAI detailsFile: CERSAI Asset Based Search.pdf | 19 Feb 2025 |
| Architect’s Certificate on Completion of Project (Form 4)File: form 4 part completion architect.pdf | 11 Feb 2025 |
| Other - LegalFile: non encorubance1-compressed FINAL.pdf | 11 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: SALE UNSOLD 11022025.pdf | 11 Feb 2025 |
| Deviation Report with respect to Allotment letterFile: no deviation allotment letter 11022025.pdf | 11 Feb 2025 |
| Other - FinanceFile: Form 5 Aarwana.pdf | 11 Feb 2025 |
| Other - TechnicalFile: FORM 2 ENG 2024.pdf | 11 Feb 2025 |
| Deviation Report with respect to model copy of AgreementFile: no deviation in agreement 11022025.pdf | 11 Feb 2025 |
| Home Buyer /Allottee Grievance Redressal CellFile: no grievences letter 1102025.pdf | 11 Feb 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: disclosure interest in other real estate organise.pdf | 10 Feb 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: disclosure interest in other real estate organise.pdf | 10 Feb 2025 |
| Details of encumbrances concerned to LegalFile: non encorubance1-compressed FINAL.pdf | 10 Feb 2025 |
| Details of encumbrances concerned to FinanceFile: non encorubance1-compressed FINAL.pdf | 10 Feb 2025 |
| Details of encumbrances concerned to FinanceFile: non encorubance1-compressed FINAL.pdf | 10 Feb 2025 |
| Details of encumbrances concerned to LegalFile: non encorubance1-compressed FINAL.pdf | 10 Feb 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: disclosure interest in other real estate organise.pdf | 10 Feb 2025 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: society formation declaration.pdf | 5 Feb 2025 |
| Status of ConveyanceFile: conveyance declaration.pdf | 5 Feb 2025 |
| Foreclosure of the ProjectFile: pre clouser declaration.pdf | 5 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: form 5 period 2017-18.pdf | 5 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: form 5 period 2018-19.pdf | 5 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: form 5 period 2019-20.pdf | 5 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: form 2 period 2019-2020.pdf | 5 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: form 2 period 2020-2021.pdf | 5 Feb 2025 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: society formation declaration.pdf | 5 Feb 2025 |
| Status of ConveyanceFile: conveyance declaration.pdf | 5 Feb 2025 |
| Foreclosure of the ProjectFile: pre clouser declaration.pdf | 5 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: form 5 period 2017-18.pdf | 5 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: form 5 period 2018-19.pdf | 5 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: form 5 period 2019-20.pdf | 5 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: form 2 period 2019-2020.pdf | 5 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: form 2 period 2020-2021.pdf | 5 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: form 5 period 2017-18.pdf | 5 Feb 2025 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: society formation declaration.pdf | 5 Feb 2025 |
| Status of ConveyanceFile: conveyance declaration.pdf | 5 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: form 2 period 2019-2020.pdf | 5 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: form 5 period 2018-19.pdf | 5 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: form 5 period 2019-20.pdf | 5 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: form 2 period 2020-2021.pdf | 5 Feb 2025 |
| Foreclosure of the ProjectFile: pre clouser declaration.pdf | 5 Feb 2025 |
| Proforma of Agreement for saleFile: अंतिम खरेदीखत 16 pages.pdf | 4 Feb 2025 |
| Declaration about Commencement CertificateFile: DECLARATION OF COMMENCEMENT CERTIFICATE 04022025.pdf | 4 Feb 2025 |
| Proforma of Agreement for saleFile: अंतिम खरेदीखत 16 pages.pdf | 4 Feb 2025 |
| Declaration about Commencement CertificateFile: DECLARATION OF COMMENCEMENT CERTIFICATE 04022025.pdf | 4 Feb 2025 |
| Declaration about Commencement CertificateFile: DECLARATION OF COMMENCEMENT CERTIFICATE 04022025.pdf | 4 Feb 2025 |
| Proforma of Agreement for saleFile: अंतिम खरेदीखत 16 pages.pdf | 4 Feb 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: format b saraswat bank.pdf | 3 Feb 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: format b saraswat bank.pdf | 3 Feb 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: format b saraswat bank.pdf | 3 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2 ENG 2023.pdf | 30 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2 ENG 2024.pdf | 30 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2 ENG 2023.pdf | 30 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2 ENG 2024.pdf | 30 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2 ENG 2023.pdf | 30 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2 ENG 2024.pdf | 30 Jan 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: FORMAT A BANK.pdf | 28 Jan 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: FINANCE DECLARATION.pdf | 28 Jan 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: FORMAT A BANK.pdf | 28 Jan 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: FINANCE DECLARATION.pdf | 28 Jan 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: FORMAT A BANK.pdf | 28 Jan 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: FINANCE DECLARATION.pdf | 28 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Aarwana.pdf | 6 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Aarwana.pdf | 6 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Aarwana.pdf | 6 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Aarwana.pdf | 6 Oct 2024 |
| Building plan approvalFile: new approval1.pdf | 10 Aug 2024 |
| Building plan approvalFile: new approval2.pdf | 10 Aug 2024 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Aaradhana Complex | near zp school -2 opp girap wada bandar road Vengurla Maharashtra 416516 | 35 | Completed | Feb 2017 | Feb 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Sindhudurg
Computed across the 530+ Sindhudurg projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 112 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Aradhana Samarpan on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near VENGURLA BANDAR ROAD530+ in Sindhudurg
Golf De Ocean
SSL Nirvana Grand Golf Developers Pvt Ltd
KRUSHNAI
CHIRAYU BUILDERS VENGURLA
Lotus
BENJAMIN MANWEL DSOUZA
Brahmand Residency
Sandesh Chandrakant Kamat
54 Anandwan Sankul
Rajesh Raghuvir Mantri
ANANDI ARPAN PHASE II
ANANDI CONSTRUCTIONS
See every Sindhudurg project, with the district possession charts
Builder: AARWANA DEVELOPERS
AARWANA DEVELOPERS has 1 registration on MahaRERA, including Aradhana Samarpan. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Sindhudurg district page.
Frequently asked questions
What are my rights if Aradhana Samarpan is delayed beyond 31 Mar 2030?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Aradhana Samarpan?
The registered promoter entity is AARWANA DEVELOPERS, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Aradhana Samarpan?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Aradhana Samarpan?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Aradhana Samarpan?
The professionals named in the filing: Architect: MR AMIT KAMAT; Engineer: MR Sandeep Shetye; Chartered Accountant: Prashant Apraj. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Aradhana Samarpan?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.