Home / Browse projects / Mumbai Suburban, Maharashtra / Aquarose

Registered No litigation declared Residential / Group Housing project

Aquarose

By Aquarock Buildcon Private Limited

RG-MH-23243 · RERA P51800078551 · Last updated on MahaRERA portal: 20 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 12 months from the original
6 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
120 of 169Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 69 documents Report an error

Aquarose is a Residential / Group Housing project by Aquarock Buildcon Private Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800078551 on 27 Dec 2024. Possession is promised by 31 Dec 2027. The completion date has moved by 12 months from the original filing. 49 of the 169 units on this registration are recorded sold or booked, and 6 of 22 construction stages are filed complete.

At a glance

Project

  • NameAquarose
  • TypeResidential / Group Housing
  • Location
    • Marve Road
    • Malvani
    • Borivali
    • Mumbai Suburban
    • 400095
  • Pincode400095
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800078551
  • ReraGenie IDRG-MH-23243

Builder

  • NameAquarock Buildcon Private Limited
  • Entity typePartnership

Key dates

this monthRegisteredDec 2024First promiseDec 2026Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Dec 2024
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 31 Dec 2026)
  • Buildings2 building records
  • Documents filed69 files

Current status

29%49 of 169 units booked
35.7%Work done, per cost certificate

Figures as on 20 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WingNA1717612687
B WingNA1616701282

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 20 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

A Wing27%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B Wing27%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNoNot applicable
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed81

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots81
Closed/Covered81
BuildingClosed/CoveredTotal
A Wing4040
B Wing4141

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,498 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on14 Apr 2026
LandownerVillageDistrict
Trishul SRA Co- Operative Housing SocietyKandivaliMumbai Suburban

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority
Permissible FSI8708.81
Proposed, not sanctioned5,832 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGR FLR SHOP NO 7A 7B SHANTI TOWER CHARKOP SHANTI CHS LTD RDP 4 SECTOR 5 CHARKOP KANDIVALI W MUMBAI
Estimated costRs 38.71 cr
Cost incurredRs 13.82 cr
Work done35.69%
BuildingWingEstimatedIncurred
A WingNARs 19.36 crRs 6.91 cr
B WingNARs 19.36 crRs 6.91 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSantosh Utekar
EngineerAditya Mehta
Chartered AccountantCA RAVINDRA KARANDIKAR
Chartered AccountantAAKANKSHA DALVI
PartnerRole in project
Aquarock Buildcon Private Limited-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA14052620966Dec 2026 → Dec 2027

Reason as filed by the promoterThe current facts of the case are being explained hereunder. The main reason for the delay is pace of sales being lower than expected and thereby affecting the cash flow of the project. Lower than expected cash flows has in turn affected the pace of construction of the project thereby making it impossible to meet the scheduled due date 31/12/2026. Out of the total 72 flats available for Sale, only 41 flats are sold till date that is 57% of the total inventory. These slow sales are prime reason for not completing the project within due date. We have made significant progress regarding the neces

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Dec 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Nov 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Dec 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed69

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect certificate 30062026.pdf20 Aug 2026
Withdrawal Update Form 2File: Form 2 June 26.pdf20 Aug 2026
Withdrawal Update Form 3File: CA certificate_compressed.pdf20 Aug 2026
Form 2A (FY 2025-2026)File: Form 2A - March 2026.pdf3 Jul 2026
Withdrawal Update Form 1File: Architect Certificate-31 Mar 26.pdf9 May 2026
Withdrawal Update Form 2File: Form 2 March 26_compressed.pdf9 May 2026
Withdrawal Update Form 3File: Rera Certificate_compressed.pdf9 May 2026
Form 1File: Architect Certificate (1).pdf14 Apr 2026
Form 2File: Form 2 Engineering Certificate.pdf14 Apr 2026
Form 3File: RERA CA Certificate - Q4.pdf14 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventory.pdf14 Apr 2026
Withdrawal Update Form 1File: Architecture certificate 7-7-25.pdf14 Apr 2026
Withdrawal Update Form 1File: Architects Certificate.pdf14 Apr 2026
Withdrawal Update Form 1File: Architect certificate oct to dec 25.pdf14 Apr 2026
Withdrawal Update Form 2File: Form 2 - Engineer Certificate - June 25.pdf14 Apr 2026
Withdrawal Update Form 2File: Engineer Certificate_compressed.pdf14 Apr 2026
Withdrawal Update Form 2File: Form 2 - Engineer Certificate.pdf14 Apr 2026
Withdrawal Update Form 3File: CA Certificate Quater-1 2025_compressed.pdf14 Apr 2026
Withdrawal Update Form 3File: Ca Certificate_compressed.pdf14 Apr 2026
Withdrawal Update Form 3File: RERA CA Certificate - Q3 Sign (1)_compressed.pdf14 Apr 2026
Form 2A (FY 2024-2025)File: Form 2A March 2025.pdf14 Apr 2026
Form 5 (FY 2024-2025)File: Form 5 for 2024-2025.pdf14 Apr 2026
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineering Certificate.pdf25 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory.pdf25 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate (1).pdf23 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA CA Certificate - Q4_compressed.pdf23 Apr 2025
Building plan approvalFile: MYSCAN_20230918_0001.pdf24 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20230918_0001.pdf24 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Certificate-signed - converted_compressed.pdf20 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: Trishul CC.pdf16 Dec 2024
Declaration about Commencement CertificateFile: Declaration of Commencement Certificate.pdf16 Dec 2024
Other - TechnicalFile: Declaration cum undertaking.pdf16 Dec 2024
Other - LegalFile: Declaration of Registered Development Agreement.pdf14 Dec 2024
Other - LegalFile: Non Negotiable Clauses.pdf14 Dec 2024
Other - FinanceFile: Declaration for No land Cost.pdf14 Dec 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report.pdf14 Dec 2024
Proforma of Agreement for saleFile: FINAL AQUA Agreement for Sale - 12122024.pdf14 Dec 2024
Copy of the legal title reportFile: RevisedFinal Title Certificate_Malvani_09122024-1.pdf12 Dec 2024
Details of encumbrances concerned to FinanceFile: Declaration of No Encumbrance_compressed.pdf12 Dec 2024
Declaration in FORM BFile: FORM B with notary.pdf12 Dec 2024
CERSAI detailsFile: Declaration of CERSAI_compressed.pdf12 Dec 2024
Details of encumbrances concerned to LegalFile: Declaration of No Encumbrance_compressed.pdf12 Dec 2024
Building plan approvalFile: MYSCAN_20230918_0007.pdf7 Nov 2024
Building plan approvalFile: MYSCAN_20230918_0006.pdf7 Nov 2024
Building plan approvalFile: MYSCAN_20230918_0005.pdf7 Nov 2024
Building plan approvalFile: MYSCAN_20230918_0004.pdf7 Nov 2024
Building plan approvalFile: MYSCAN_20230918_0003.pdf7 Nov 2024
Building plan approvalFile: MYSCAN_20230918_0002.pdf7 Nov 2024
Layout approvalFile: MYSCAN_20230918_0001.pdf7 Nov 2024
PAN CardFile: pan card.pdf7 Nov 2024
Details of encumbrances concerned to FinanceFile: Non encumbrance - Finance.pdf7 Nov 2024
Copy of Layout Approval (in case of layout)File: MYSCAN_20230918_0001.pdf7 Nov 2024
Proforma of Allotment letterFile: Enacture 1 model form of a allotment letter.pdf7 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architecture certificate.pdf7 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 18_Engineer certificate.pdf7 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20230918_0002.pdf7 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20230918_0003.pdf7 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20230918_0004.pdf7 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20230918_0005.pdf7 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20230918_0006.pdf7 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20230918_0007.pdf7 Nov 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format - Declaration about separate bank account of real estate project.pdf7 Nov 2024
Deviation Report with respect to Allotment letterFile: Deviation Report - Letter of allotment.pdf7 Nov 2024
Details of encumbrances concerned to LegalFile: Non encumbrance - Finance.pdf7 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Yashoda Jadli.pdf7 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Sayli Belkar.pdf7 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest Gurmeet Singh.pdf7 Nov 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B - Opening of RERA Designated Bank Accounts.pdf7 Nov 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for secured unsecured finance availed for the project.pdf7 Nov 2024

How this compares with Mumbai Suburban

29%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 12 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Aquarose on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Malvani6,700+ in Mumbai Suburban

2 kmAquaroseCompleted 168Lapsed / revoked 99Other 233Dot size: filed unitsN

Filed coordinates, straight-line distance. 500 registered projects within 2 km.

Builder: Aquarock Buildcon Private Limited

Aquarock Buildcon Private Limited has 1 registration on MahaRERA, including Aquarose. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Aquarose is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Aquarose?

The registered promoter entity is Aquarock Buildcon Private Limited, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Aquarose?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Aquarose?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Aquarose?

The professionals named in the filing: Architect: Santosh Utekar; Engineer: Aditya Mehta; Chartered Accountant: CA RAVINDRA KARANDIKAR; Chartered Accountant: AAKANKSHA DALVI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Aquarose?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Aquarose. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Aquarose to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.