Home / Browse projects / Pune, Maharashtra / Aqua Phase I
Aqua Phase I
RG-MH-08176 · RERA P52100000232 · Last updated on MahaRERA portal: 19 Apr 2024
Source: official MahaRERA filing
Red flags
- 1 complaint at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Aqua Phase I is a Residential / Group Housing project by M/S Majestique Heights in Pune, Maharashtra, registered with MahaRERA as P52100000232 on 10 Jul 2017. The registration is recorded completed; possession was promised by 1 Apr 2022. 1 complaint is on record with the regulator.
At a glance
Project
- NameAqua Phase I
- TypeResidential / Group Housing
- Location
- -
- Fursungi
- Haveli
- Pune
- 412308
- Pincode412308
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100000232
- ReraGenie IDRG-MH-08176
Builder
- NameM/S Majestique Heights
- Entity typePartnership
- PartnersJAVED RIYAZ SHAIKH, NAVED RIYAZ SHAIKH, SURESH PREMRAJ KATARIYA, AMIT ANIL LALWANI, KUSHALRAJ PREMRAJ KATARIYA, BHAIRAVSINGH N RAJPUROHIT
- Other registrations3 more →
- Completed4 of 4
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on10 Jul 2017
- Promised completion1 Apr 2022
- Revised completionNone
- Buildings4 building records
- Documents filed106 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| G | NA | 13 | 0 | 0 | 0 | 0 |
| F | NA | 14 | 0 | 0 | 0 | 0 |
| E | NA | 14 | 0 | 0 | 0 | 0 |
| CLUB HOUSE | NA | 3 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 19 Apr 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
44 of 44 construction stages are filed complete across 4 buildings.
G100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
F100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
E100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
CLUB HOUSE100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 19 Apr 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | No | Not applicable |
Parking filed152
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| G | 37 | 37 |
| F | 58 | 58 |
| E | 57 | 57 |
Land and ownership15
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| BALASAHAB KALURAM KAMTHE | Fursungi | Pune |
| DATTATRAY SHIVRAM KAMTHE | Fursungi | Pune |
| Shankar Bhagwan Satav | Fursungi | Pune |
| Sunil Mhasku Satav | Fursungi | Pune |
| Sandeep Mhasku Satav | Fursungi | Pune |
| Pramod Vasant Kudale | Fursungi | Pune |
| Kisan D Satav | Fursungi | Pune |
| Kundalik Sudam Satav | Fursungi | Pune |
| Vasant Mahadeo Satav | Fursungi | Pune |
| Balasaheb Mahadev Satav | Fursungi | Pune |
| Dnyaneshwar Dattatray Satav | Fursungi | Pune |
| Chandrakant Mahadeo Satav | Fursungi | Pune |
| Vithal Parshuram KAmthe | Fursungi | Pune |
| Mahendra Kisan Satav | Fursungi | Pune |
| MR RAJAN SHANKAR KAMTHE | Fursungi | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MR ATIT ADMULWAR |
| Engineer | MR PARAG CHOPDA |
| Partner | Role in project |
|---|---|
| M/S Majestique Heights | - |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000064308 | Majestique Heights | Mr Shigil Gangadharn | 28/09/2020 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 6 Mar 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 20 Dec 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 20 Dec 2019 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 20 Dec 2019Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 17 Dec 2019
Documents filed106
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 106 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Disclosure of sold/ booked inventoryFile: Aqua E,F,G_compressed.pdf | 19 Apr 2024 |
| Declaration about Commencement CertificateFile: RERA.pdf | 18 Jun 2022 |
| CERSAI detailsFile: RERA.pdf | 18 Jun 2022 |
| Disclosure of sold/ booked inventoryFile: Aqua E wing_compressed.pdf | 18 Jun 2022 |
| Disclosure of sold/ booked inventoryFile: Aqua F wing_compressed.pdf | 18 Jun 2022 |
| Disclosure of sold/ booked inventoryFile: Aqua G wing_compressed.pdf | 18 Jun 2022 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: aqua.pdf | 23 Jun 2021 |
| Disclosure of sold/ booked inventoryFile: Wing E.pdf | 3 Jun 2021 |
| Disclosure of sold/ booked inventoryFile: Wing F.pdf | 3 Jun 2021 |
| Disclosure of sold/ booked inventoryFile: Wing G_compressed.pdf | 3 Jun 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5.pdf | 2 Jan 2020 |
| Layout approvalFile: 00-DEVELOPMENT PLAN-00.pdf | 20 Dec 2019 |
| Building plan approvalFile: 01.pdf | 20 Dec 2019 |
| Building plan approvalFile: 02.pdf | 20 Dec 2019 |
| Building plan approvalFile: 03.pdf | 20 Dec 2019 |
| Building plan approvalFile: 04.pdf | 20 Dec 2019 |
| Building plan approvalFile: 05.pdf | 20 Dec 2019 |
| Building plan approvalFile: 06.pdf | 20 Dec 2019 |
| Building plan approvalFile: 07.pdf | 20 Dec 2019 |
| Building plan approvalFile: 08.pdf | 20 Dec 2019 |
| Building plan approvalFile: 09.pdf | 20 Dec 2019 |
| Building plan approvalFile: 10.pdf | 20 Dec 2019 |
| Building plan approvalFile: 11.pdf | 20 Dec 2019 |
| Building plan approvalFile: 12.pdf | 20 Dec 2019 |
| Building plan approvalFile: 12.pdf | 20 Dec 2019 |
| Building plan approvalFile: 13.pdf | 20 Dec 2019 |
| Building plan approvalFile: 14.pdf | 20 Dec 2019 |
| Building plan approvalFile: 16.pdf | 20 Dec 2019 |
| Building plan approvalFile: 17.pdf | 20 Dec 2019 |
| Building plan approvalFile: 18.pdf | 20 Dec 2019 |
| Building plan approvalFile: 19.pdf | 20 Dec 2019 |
| Copy of Layout Approval (in case of layout)File: 00-DEVELOPMENT PLAN-00.pdf | 20 Dec 2019 |
| Building Plan Approval (IOD)File: 01.pdf | 20 Dec 2019 |
| Building Plan Approval (IOD)File: 02.pdf | 20 Dec 2019 |
| Building Plan Approval (IOD)File: 03.pdf | 20 Dec 2019 |
| Building Plan Approval (IOD)File: 04.pdf | 20 Dec 2019 |
| Building Plan Approval (IOD)File: 05.pdf | 20 Dec 2019 |
| Building Plan Approval (IOD)File: 06.pdf | 20 Dec 2019 |
| Building Plan Approval (IOD)File: 07.pdf | 20 Dec 2019 |
| Building Plan Approval (IOD)File: 08.pdf | 20 Dec 2019 |
| Building Plan Approval (IOD)File: 09.pdf | 20 Dec 2019 |
| Building Plan Approval (IOD)File: 10.pdf | 20 Dec 2019 |
| Building Plan Approval (IOD)File: 11.pdf | 20 Dec 2019 |
| Building Plan Approval (IOD)File: 12.pdf | 20 Dec 2019 |
| Building Plan Approval (IOD)File: 12.pdf | 20 Dec 2019 |
| Building Plan Approval (IOD)File: 13.pdf | 20 Dec 2019 |
| Building Plan Approval (IOD)File: 14.pdf | 20 Dec 2019 |
| Building Plan Approval (IOD)File: 16.pdf | 20 Dec 2019 |
| Building Plan Approval (IOD)File: 17.pdf | 20 Dec 2019 |
| Building Plan Approval (IOD)File: 18.pdf | 20 Dec 2019 |
| Building Plan Approval (IOD)File: 19.pdf | 20 Dec 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: C-C-BUILDING PLAN-00.pdf | 20 Dec 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: C-C -DEVELOPMENT PLAN.pdf | 20 Dec 2019 |
| Certificates of Architect (Form 4)File: Form-04- Club House.pdf | 20 Dec 2019 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OCCUPANCY CERTIFICATE-CLUB HOUSE.pdf | 17 Dec 2019 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: G NAD F COMPLETION CERTIFICATE.pdf | 27 Nov 2019 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: E building completion.pdf | 27 Nov 2019 |
| Certificates of Architect (Form 4)File: Form 4-AQUA.pdf | 27 Nov 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf | 19 Sep 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf | 19 Sep 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf | 19 Sep 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf | 19 Sep 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf | 19 Sep 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf | 19 Sep 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf | 19 Sep 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf | 19 Sep 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf | 19 Sep 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf | 19 Sep 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf | 19 Sep 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf | 19 Sep 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf | 19 Sep 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf | 19 Sep 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf | 19 Sep 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf | 19 Sep 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf | 19 Sep 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf | 19 Sep 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf | 19 Sep 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf | 19 Sep 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf | 19 Sep 2019 |
| Certificates of Architect (Form 4)File: FORM-04 (1).pdf | 16 Jul 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 3 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 106 filed documents as one ZIP, foldered, with a manifest
Keep Aqua Phase I on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near -13,700+ in Pune
Filed coordinates, straight-line distance. 59 registered projects within 2 km.
Ashtavinayak City Phase - 3
Ashtavinayak City Pune LLP
CELESTIA
Malpani Properties
SAMRUDDHI HEIGHTS
Shree Samruddhi Corporation
Suyog Shrushti
Suyog Developers
Ashtavinayak City Phase - 4
Ashtavinayak Reality
Everra Phase 1
Honcho Properties Private Limited
Builder: M/S Majestique Heights
M/S Majestique Heights has 4 registrations on MahaRERA, including Aqua Phase I and Aqua Phase II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Aqua Phase I is delayed beyond 1 Apr 2022?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Aqua Phase I?
The registered promoter entity is M/S Majestique Heights, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Aqua Phase I?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Aqua Phase I?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Aqua Phase I?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Aqua Phase I?
The professionals named in the filing: Architect: MR ATIT ADMULWAR; Engineer: MR PARAG CHOPDA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Aqua Phase I?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback