ANUJ INDUSTRIAL PARK
RG-MH-25274 · RERA P51700005403 · Last updated on MahaRERA portal: 28 Oct 2024
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 46 months past the filed date
- 1 complaint at MahaRERA
- Completion date moved by 48 months
- 2 extensions taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
ANUJ INDUSTRIAL PARK is a Mixed project by M/S GIRIJA DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700005403 on 11 Aug 2017. Possession was promised by 30 Dec 2022 and is now 46 months past that date. The completion date has moved by 48 months from the original filing. 1 complaint is on record with the regulator.
At a glance
Project
- NameANUJ INDUSTRIAL PARK
- TypeMixed
- Location
- DAHISAR
- Thane
- 400068
- Pincode400068
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700005403
- ReraGenie IDRG-MH-25274
Builder
- NameM/S GIRIJA DEVELOPERS
- Entity typePartnership
- PartnersNARESH VELJI GOGARI, PIYUSH MORARJI SHAH, JAYESH BALWANT JANI, BHARAT BANSILAL PANDYA, JATIN JAYSUKHBHAI PATEL, SATISH HARIBHAI PATEL
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on11 Aug 2017
- Promised completion30 Dec 2022
- Revised completionRevised to 30 Dec 2022 (originally 31 Dec 2018)
- Buildings1 building record
- Documents filed75 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| ANUJ INDUSTRIAL PARK A AND B WING | NA | 7 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 28 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 95%.
ANUJ INDUSTRIAL PARK A AND B WING: 90% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 28 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed14
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners1
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | RASIK HINGOO ASSOCIATES |
| Partner | Role in project |
|---|---|
| M/S GIRIJA DEVELOPERS | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDue to delay in getting approval from the concerned authority the project was not able to get completed in time. We would request you to kindly grant us Extension for one Year.
Reason as filed by the promoterdue to delay in obtaining permission from the competent authority the project was delayed however the project shall be completed by 31st december 2021. we request you to kindly grant us the certificate at earliest.
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12600357 | Mukesh Shrikant Shah | M/S GIRIJA DEVELOPERS | 19/01/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 28 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 28 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 28 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 2 Sep 2020Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed75
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: form 5 19-20.pdf | 28 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: form 5 20-21.pdf | 28 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form 5 22-23.pdf | 28 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1.pdf | 14 Aug 2024 |
| Certificates of CA (Form 3)File: FORM 3.pdf | 30 Jul 2024 |
| Certificates of CA (Form 3)File: Girija Developers (1).pdf | 4 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate for Rera 20.pdf | 16 Nov 2022 |
| Certificates of CA (Form 3)File: Signed Ca Certificate Girija developers Sept'22.pdf | 1 Nov 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Anuj R1 Oct 2022.pdf | 21 Oct 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ANUJ FORM 2.pdf | 17 May 2022 |
| Certificates of CA (Form 3)File: Signed Ca Certificate Girija developers.pdf | 12 May 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate for Rera 18_compressed.pdf | 13 Apr 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: GIRIJA FORM 2A.pdf | 11 Apr 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2.pdf | 29 Jan 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ANUJ.pdf | 21 Oct 2021 |
| Form 2AFile: GIRIJA FORM 2A.pdf | 19 Oct 2021 |
| Certificates of CA (Form 3)File: signed CA Certificate Girija Developers - jun'21.pdf | 3 Aug 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate for Rera.pdf | 16 Jul 2021 |
| Form 2AFile: FORM 2A_1.pdf | 14 Jul 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Rera certufucate of Anuj Industries.pdf | 1 May 2021 |
| Form 2AFile: 2A (1).pdf | 16 Apr 2021 |
| Certificates of CA (Form 3)File: signed ca certificate (6).pdf | 15 Feb 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: GAURI ANUJ FORM 1 21-01-21.pdf | 23 Jan 2021 |
| Form 2AFile: FORM 2A GIRIJA anuj.pdf | 19 Jan 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ANUJ ARCH.pdf | 21 Oct 2020 |
| Form 2AFile: ANUJ 2A.pdf | 21 Oct 2020 |
| Certificates of CA (Form 3)File: ANUJ CA.pdf | 21 Oct 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH ANUJ 01.pdf | 21 Sep 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH ANUJ 02.pdf | 21 Sep 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: Anuj CC.pdf | 2 Sep 2020 |
| Form 2AFile: FORM 2A JUNE.pdf | 31 Jul 2020 |
| Form 2AFile: FORM 2A MARCH.pdf | 31 Jul 2020 |
| Certificates of CA (Form 3)File: CA MARCH.pdf | 31 Jul 2020 |
| Certificates of CA (Form 3)File: CA JUNE.pdf | 31 Jul 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate.pdf | 16 Jan 2020 |
| Form 2AFile: FORM-2A.pdf | 16 Jan 2020 |
| Certificates of CA (Form 3)File: CACERTIFICATE.pdf | 16 Jan 2020 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: ANUJ.pdf | 22 Nov 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ANUJ INDUSTRIAL.pdf | 4 Nov 2019 |
| Form 2AFile: ANUJ INDUSTRIAL.pdf | 17 Oct 2019 |
| Certificates of CA (Form 3)File: ANUJ INDUSTRIAL.pdf | 15 Oct 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ANUJ INDUSTRIAL PARK.pdf | 31 Jul 2019 |
| Form 2AFile: ANUJ INDUSTRIAL PARK FORM 2A_compressed.pdf | 30 Jul 2019 |
| Certificates of CA (Form 3)File: ANUJ INDUSTRIAL PARK.pdf | 24 Jul 2019 |
| Form 2AFile: ANUJ.pdf | 23 May 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: anuj.pdf | 20 May 2019 |
| Certificates of CA (Form 3)File: Anuj Industrial Park.pdf | 16 May 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: arch.pdf | 28 Jan 2019 |
| Form 2AFile: form 2a.pdf | 28 Jan 2019 |
| Certificates of CA (Form 3)File: CA.pdf | 28 Jan 2019 |
| Certificates of CA (Form 5)File: anuj form 5.pdf | 29 Oct 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH ANUJ compressed.pdf | 22 Oct 2018 |
| Certificates of CA (Form 3)File: Anuj.pdf | 22 Oct 2018 |
| Proforma of Allotment letterFile: Draft RERA Agreement - Anuj.pdf | 9 Aug 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH ANUJ compressed.pdf | 3 Aug 2018 |
| Certificates of CA (Form 3)File: Anuj Gauri CA.pdf | 3 Aug 2018 |
| Certificates of CA (Form 3)File: ca comp.pdf | 19 Apr 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ANUJ ARC-ilovepdf-compressed.pdf | 12 Apr 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARC COMP.pdf | 2 Feb 2018 |
| Certificates of CA (Form 3)File: ca anuj industrial park.pdf | 2 Feb 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: compressed cc.pdf | 30 Dec 2017 |
| Certificates of CA (Form 3)File: anuj ca.pdf | 27 Nov 2017 |
| Details of encumbrancesFile: anuj encum.pdf | 29 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: anuj eng-ilovepdf-compressed (1).pdf | 29 Jul 2017 |
| Certificates of CA (Form 3)File: anuj ca.pdf | 29 Jul 2017 |
| Proforma of Allotment letterFile: anuj allot.pdf | 29 Jul 2017 |
| Layout approvalFile: anuj layout.pdf | 28 Jul 2017 |
| Building plan approvalFile: anuj iod.pdf | 28 Jul 2017 |
| PAN CardFile: anuj park pan.pdf | 28 Jul 2017 |
| Copy of the legal title reportFile: anuj title.pdf | 28 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: anuj layout.pdf | 28 Jul 2017 |
| Building Plan Approval (IOD)File: anuj iod.pdf | 28 Jul 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: anuj cc.pdf | 28 Jul 2017 |
| Declaration in FORM BFile: anuj form b.pdf | 28 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: anuj archi.pdf | 28 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 75 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep ANUJ INDUSTRIAL PARK on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near DAHISAR7,600+ in Thane
Filed coordinates, straight-line distance. 114 registered projects within 2 km.
ICON
RAGHU LEELA REALTORS PRIVATE LIMITED
ORNATE SOLITAIRE
ORNATE DAHISAR DEVELOPERS
EMPIRE HEIGHTS
EMPIRE REALTY
SHAKTI DHAM-WING A, VRINDAVAN-WING B RESIDENTI
DHARTI DEVELOPERS
RAGHUKUL CHSL
RAMNIYATI REALITIES LLP
Earth Residency Wing C and Wing D
Earth Estate Developers Pvt Ltd
See every Thane project, with the district possession charts
Builder: M/S GIRIJA DEVELOPERS
M/S GIRIJA DEVELOPERS has 1 registration on MahaRERA, including ANUJ INDUSTRIAL PARK. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What does it mean that ANUJ INDUSTRIAL PARK shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if ANUJ INDUSTRIAL PARK is delayed beyond 30 Dec 2022?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of ANUJ INDUSTRIAL PARK?
The registered promoter entity is M/S GIRIJA DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in ANUJ INDUSTRIAL PARK?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against ANUJ INDUSTRIAL PARK?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for ANUJ INDUSTRIAL PARK?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at ANUJ INDUSTRIAL PARK?
The professionals named in the filing: Architect: RASIK HINGOO ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ANUJ INDUSTRIAL PARK?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback