ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Anshul Ela D Building

Registered No litigation declared Residential / Group Housing project

Anshul Ela D Building

By Anshul Rutuja Promoters & Builders LLP

RG-MH-50427 · RERA P52100035086 · Last updated on MahaRERA portal: 25 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Apr 2028Possession promisedno revision filed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
9 of 84Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 119 documents Report an error

Anshul Ela D Building is a Residential / Group Housing project by Anshul Rutuja Promoters & Builders LLP in Pune, Maharashtra, registered with MahaRERA as P52100035086 on 10 May 2022. Possession is promised by 30 Apr 2028. 75 of the 84 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • NameAnshul Ela D Building
  • TypeResidential / Group Housing
  • Location
    • Pune Nasik Highway
    • Village Moshi
    • Moshi
    • Haveli
    • Pune
    • 412105
  • Pincode412105
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100035086
  • ReraGenie IDRG-MH-50427

Builder

  • NameAnshul Rutuja Promoters & Builders LLP
  • Entity typePartnership
  • PartnersDEEPAK VILASRAO JAGTAP, RAMESH PANDURANG UNDE, ARUN SAMPATRAO PATIL
  • Declared earlier projects1 →

Key dates

this monthRegisteredMay 2022PromisedApr 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on10 May 2022
  • Promised completion30 Apr 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed119 files

Current status

89%75 of 84 units booked

Figures as on 25 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Anshul Ela D-1 and D-2 BuildingNA8784084

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 25 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Anshul Ela D-1 and D-2 Building: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 25 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed95

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots95
Closed/Covered41
Open Space54

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,038 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on12 Dec 2025

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI5600.84
Proposed, not sanctioned5,601 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchFC Road Pune 411005

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSpace Tech
EngineerVilas Kudale
Chartered AccountantNitesh M Shaha & Co
PartnerRole in project
Anshul Rutuja Promoters & Builders LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 May 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jan 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Jan 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Apr 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2028

Documents filed119

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 119 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: AC_ElaD_June25_page-0001.pdf25 May 2026
Form 2File: EC_Ela D_June25.pdf25 May 2026
Form 3File: CA_ElaD_June25.pdf25 May 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory_June25.pdf25 May 2026
Form 1File: AC_ElaD_Sept25.pdf25 May 2026
Form 2File: EC_ElaD_Sept25_page-0001.pdf25 May 2026
Form 3File: CA_ElaD_Sept25.pdf25 May 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory_Sept25.pdf25 May 2026
Form 1File: AC_ElaD_Dec25.pdf25 May 2026
Form 2File: EC_EvaD_Dec25_page-0001.pdf25 May 2026
Form 3File: CA_ElaD_Dec25.pdf25 May 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory_Dec25.pdf25 May 2026
Form 1File: AC_ElaD_June23.pdf22 May 2026
Form 2File: EC_ElaD_June23.pdf22 May 2026
Form 3File: CA_ElaD_June23.pdf22 May 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory_June23.pdf22 May 2026
Form 1File: AC_ElaD_Sept23.pdf22 May 2026
Form 2File: EC_ElaD_Sept23.pdf22 May 2026
Form 3File: CA_ElaD_Sept23.pdf22 May 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory_Sept23.pdf22 May 2026
Form 1File: AC_ElaD_Dec23.pdf22 May 2026
Form 2File: EC_ElaD_Dec23.pdf22 May 2026
Form 3File: CA_ElaD_Dec23.pdf22 May 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory_Dec23.pdf22 May 2026
Form 1File: AC_ElaD_March24.pdf22 May 2026
Form 2File: EC_ElaD_March24.pdf22 May 2026
Form 3File: CA_ElaD_March24.pdf22 May 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory_March24.pdf22 May 2026
Form 1File: AC_ElaD_June24_page-0001.pdf22 May 2026
Form 2File: EC_ElaD_June24.pdf22 May 2026
Form 3File: CA_ElaD_June24.pdf22 May 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory_June24.pdf22 May 2026
Form 1File: AC_ElaD_Sept24.pdf22 May 2026
Form 2File: EC_ElaD_Sept24.pdf22 May 2026
Form 3File: CA_ElaD_Sept24.pdf22 May 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory_Sept24.pdf22 May 2026
Form 1File: AC_ElaD_Dec2024.pdf22 May 2026
Form 2File: EC_ElaD_Dec24.pdf22 May 2026
Form 3File: CA_ElaD_Dec2024.pdf22 May 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory_Dec24.pdf22 May 2026
Form 1File: AC_ElaD_March25.pdf22 May 2026
Form 2File: EC_ElaD_March25.pdf22 May 2026
Form 3File: CA_ElaD_March25.pdf22 May 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory_March25.pdf22 May 2026
Form 1File: AC_ElaD_June22_page-0001.pdf21 May 2026
Form 2File: EC_ElaD_June22_page-0001.pdf21 May 2026
Form 3File: CA_ElaD_June22_page-0001.pdf21 May 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory_June22.pdf21 May 2026
Form 1File: AC_ElaD_Sept22.pdf21 May 2026
Form 2File: EC_ElaD_Sept22.pdf21 May 2026
Form 3File: CA_ElaD_Sept22.pdf21 May 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory_Sept22.pdf21 May 2026
Form 1File: AC_ElaD_Dec22.pdf21 May 2026
Form 2File: EC_ElaD_Dec22.pdf21 May 2026
Form 3File: CA_ElaD_Dec22.pdf21 May 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory_Dec22.pdf21 May 2026
Form 1File: AC_ElaD_March23.pdf21 May 2026
Form 2File: EC_ElaD_March23.pdf21 May 2026
Form 3File: CA_ElaD_March23_page-0001.pdf21 May 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory_March23.pdf21 May 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AC_ElaD_March25.pdf3 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_ElaD_March25.pdf3 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EC_ElaD_March25.pdf3 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AC_ElaD_Dec2024.pdf15 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_ElaD_Dec2024.pdf15 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EC_ElaD_Dec24.pdf15 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AC_ElaD_June24_page-0001.pdf30 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AC_ElaD_Sept24.pdf30 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AC_ElaD_Sept24.pdf30 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_ElaD_Sept24.pdf30 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_ElaD_Sept24.pdf30 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_ElaD_June24.pdf29 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EC_ElaD_June24.pdf29 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EC_ElaD_Sept24.pdf29 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_ElaD_March24.pdf9 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AC_ElaD_March24.pdf12 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EC_ElaD_March24.pdf12 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Ela-D_Form5_2022_23.pdf29 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_ElaD_Dec23.pdf21 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AC_ElaD_Sept23.pdf6 Feb 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Anshul Ela A,B,CGat No 50 Hissa No 1 Moshi Talika Haveli Dist Pune168CompletedMar 2017Late, Jul 2017

How this compares with Pune

89%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Anshul Ela D Building on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Village Moshi13,700+ in Pune

2 kmAnshul Ela D BuildingCompleted 163Lapsed / revoked 119Other 152Dot size: filed unitsN

Filed coordinates, straight-line distance. 434 registered projects within 2 km.

Builder: Anshul Rutuja Promoters & Builders LLP

Anshul Rutuja Promoters & Builders LLP has 1 registration on MahaRERA, including Anshul Ela D Building. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Anshul Ela D Building is delayed beyond 30 Apr 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Anshul Ela D Building?

The registered promoter entity is Anshul Rutuja Promoters & Builders LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Anshul Ela D Building?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Anshul Ela D Building?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Anshul Ela D Building?

The professionals named in the filing: Architect: Space Tech; Engineer: Vilas Kudale; Chartered Accountant: Nitesh M Shaha & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Anshul Ela D Building?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Anshul Ela D Building. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Anshul Ela D Building to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.