Home / Browse projects / Pune, Maharashtra / ANAND SAGAR RESIDENCY

Registered No litigation declared Residential / Group Housing project

ANAND SAGAR RESIDENCY

By SHRIPAD BUILDERS & DEVELOPERS

RG-MH-26641 · RERA P52100014456 · Last updated on MahaRERA portal: 19 Dec 2022

Source: official MahaRERA filing

Red flags

  • 3 complaints at MahaRERA
  • Completion date moved by 80 months
  • 3 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2028Possession promisedmoved 80 months from the original
8 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 85%
87 of 148Units unsoldnot recorded sold or booked
3Complaints at MahaRERAon this registration
Jump to the 31 documents Report an error

ANAND SAGAR RESIDENCY is a Residential / Group Housing project by SHRIPAD BUILDERS & DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100014456 on 4 Dec 2017. Possession is promised by 30 Mar 2028. The completion date has moved by 80 months from the original filing. 61 of the 148 units on this registration are recorded sold or booked, and 8 of 22 construction stages are filed complete. 3 complaints are on record with the regulator.

At a glance

Project

  • NameANAND SAGAR RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • Near Goli Kharkhana
    • SAMTA NAGAR
    • Rajgurunagar (CT)
    • Khed
    • Pune
    • 410505
  • Pincode410505
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100014456
  • ReraGenie IDRG-MH-26641

Builder

  • NameSHRIPAD BUILDERS & DEVELOPERS
  • Entity typePartnership
  • PartnersMAKRAND VASUDEV GADGIL, NILESH MADHARAO SAMBHUS

Key dates

this monthRegisteredDec 2017First promiseJul 2021Revised toMar 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on4 Dec 2017
  • Promised completion30 Mar 2028
  • Revised completionRevised to 30 Mar 2028 (originally 30 Jul 2021)
  • Buildings2 building records
  • Documents filed31 files

Current status

41%61 of 148 units booked

Figures as on 19 Dec 2022, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building ANA8774074
Building BNA8774074

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 19 Dec 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 85%.

Building A51%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building B48%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 19 Dec 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes30%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes20%
Street LightingYes20%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed123

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots123
Closed/Covered23
Open Space100
BuildingClosed/CoveredOpen SpaceTotal
Building A225072
Building B15051

Land and ownership18

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,134 sq m
Land owned byThe promoter, with other names on the file
Named landowners18
LandownerVillageDistrict
PALLAVI VINIT BHOMERajgurunagar (CT)Pune
RAHUL PRABHAKAR KUMBHARRajgurunagar (CT)Pune
RAMCHANDRA NARAYAN GHUMATKARRajgurunagar (CT)Pune
VIJAY SHIVRAM BHOOMERajgurunagar (CT)Pune
SUNITA VIJAY BHOOMERajgurunagar (CT)Pune
PRABHAKAR TABAJI KUMBHARRajgurunagar (CT)Pune
EKNATH LAXMAN GHUMATKARRajgurunagar (CT)Pune
SHANTARAM LAXMAN GHUMATKARRajgurunagar (CT)Pune
RAJESH EKNATH GHUMATKARRajgurunagar (CT)Pune
RAHUL EKNATH GHUMATKARRajgurunagar (CT)Pune
ATUL EKNATH GHUMATKARRajgurunagar (CT)Pune
SAMIR SURESH GHUMATKARRajgurunagar (CT)Pune
MAHESH RAMCHANDR GHUMATKARRajgurunagar (CT)Pune
VISHAL RAMCHANDRA GHUMATKARRajgurunagar (CT)Pune
VIJAYA RAMCHANDRA GHUMATKARRajgurunagar (CT)Pune
YOGESH SHANTARAM GHUMATKARRajgurunagar (CT)Pune
NITESH SHANTARAM GHUMATKARRajgurunagar (CT)Pune
POONAM PRADEEP SHAVKARRajgurunagar (CT)Pune

Approvals and building plan

Sanctioning authorityRajgurunagar Muncipal Council
Permissible FSI6567.65
Proposed, not sanctioned6,568 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRAJGURUNAGAR

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMangesh D Kahane
EngineerDeepak Nalwade
Chartered AccountantCA SANGITA BISOI & ASSOCIATES
PartnerRole in project
SHRIPAD BUILDERS & DEVELOPERS-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100010631Jul 2021 → Jun 2022

Reason as filed by the promoter1. Non availability of skilled labour in pandemic period and thereafter, has delayed the work. 2. Interrupt in supply chain of materials.

EXT52100013157Jul 2021 → Jun 2024

Reason as filed by the promoterDUE TO COVID AND UNAVILABILITY OF RESOURCES.

EA28032620427Jul 2021 → Mar 2028

Reason as filed by the promoter1.Personal Reasons The project faced delays due to unavoidable personal circumstances. The promoter’s mother was hospitalized due to serious health issues, which required continuous attention and care. This difficult period, combined with the challenges posed by the COVID-19 pandemic, significantly impacted the promoter’s ability to manage the project effectively during that time. 2. Financial Constraints The project is being self-funded by the promoter. During the COVID-19 period, 2-3 bookings were cancelled, which further strained the financial resources and caused temporary delays in projec

Complaints filed with MahaRERA3

Case no.ComplainantRespondentFiled
CC12501316Balasaheb T AndhaleSHRIPAD BUILDERS & DEVELOPERS21/04/2025
CC12502881AMOL SURESH CHASKARSHRIPAD BUILDERS & DEVELOPERS16/08/2025
CC12503378Amrut Raman PatekarSHRIPAD BUILDERS & DEVELOPERS22/09/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Dec 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Nov 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Nov 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Mar 2028

Documents filed31

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Rera audit report .pdf19 Dec 2022
Copy of the legal title reportFile: LEGAL TITLE REPORT.pdf17 Dec 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf17 Dec 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf17 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A.pdf17 Dec 2022
CERSAI detailsFile: CERSAI_Search_Report_200255116946_For_Asset_Based_Search_17_12_2022_16_30_46_167.pdf17 Dec 2022
Disclosure of sold/ booked inventoryFile: CIRCULAR 29.pdf17 Dec 2022
Disclosure of sold/ booked inventoryFile: Decl of Sold unsold.pdf7 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5- RERA- ANANDSAGAR RESIDENCY 2019.pdf7 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5- RERA- ANANDSAGAR RESIDENCY 2020.pdf7 Sep 2021
Declaration about Commencement CertificateFile: Form D- Commencement Declaration.pdf6 Sep 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Architech Cert 14072021.pdf6 Sep 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 10082021.pdf6 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 31032020.pdf6 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 31032021.pdf6 Sep 2021
Certificates of CA (Form 5)File: Shripad_RERA Form 5.pdf28 Sep 2018
Commencement Certificates / NA Order for plotted developmentFile: Commment_NA 1.pdf7 Apr 2018
Commencement Certificates / NA Order for plotted developmentFile: Nagar Parishad Permission.pdf7 Apr 2018
Commencement Certificates / NA Order for plotted developmentFile: Commment_NA.pdf31 Mar 2018
Certificates of CA (Form 3)File: CA Cert F- Signed.pdf29 Nov 2017
Details of encumbrancesFile: Affidavit- Notorised.pdf28 Nov 2017
Declaration in FORM BFile: Affidavit- Notorised.pdf28 Nov 2017
Building plan approvalFile: Santion Plan.pdf26 Nov 2017
Layout approvalFile: Santion Plan.pdf26 Nov 2017
PAN CardFile: Pan Card.pdf26 Nov 2017
Copy of the legal title reportFile: Search Title.pdf26 Nov 2017
Copy of Layout Approval (in case of layout)File: Santion Plan.pdf26 Nov 2017
Building Plan Approval (IOD)File: Santion Plan.pdf26 Nov 2017
Proforma of Allotment letterFile: 1-7-ilovepdf-compressed (1).pdf26 Nov 2017
Proforma of Allotment letterFile: 8-14-ilovepdf-compressed.pdf26 Nov 2017
Proforma of Allotment letterFile: 15-27-ilovepdf-compressed.pdf26 Nov 2017

How this compares with Pune

41%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 80 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ANAND SAGAR RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SAMTA NAGAR13,700+ in Pune

2 kmANAND SAGAR RESIDENCYCompleted 9Lapsed / revoked 10Other 12Dot size: filed unitsN

Filed coordinates, straight-line distance. 31 registered projects within 2 km.

Builder: SHRIPAD BUILDERS & DEVELOPERS

SHRIPAD BUILDERS & DEVELOPERS has 1 registration on MahaRERA, including ANAND SAGAR RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if ANAND SAGAR RESIDENCY is delayed beyond 30 Mar 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ANAND SAGAR RESIDENCY?

The registered promoter entity is SHRIPAD BUILDERS & DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ANAND SAGAR RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against ANAND SAGAR RESIDENCY?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for ANAND SAGAR RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ANAND SAGAR RESIDENCY?

The professionals named in the filing: Architect: Mangesh D Kahane; Engineer: Deepak Nalwade; Chartered Accountant: CA SANGITA BISOI & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ANAND SAGAR RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ANAND SAGAR RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ANAND SAGAR RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.