Anand Dham

By Belvalkar Landmarks LLP

RG-MH-31221 · RERA P52100079555 · Last updated on MahaRERA portal: 5 Aug 2026

Source: official MahaRERA filing

Red flags

  • Rs 20.00 crore secured on the land, in favour of Aditya Birla Capital Limited

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
May 2028Possession promisedno revision filed
2 of 11Construction stages donefurthest along: Slabs of Super Structure, 42%
6 of 8Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 71 documents Report an error

Anand Dham is a Others project by Belvalkar Landmarks LLP in Pune, Maharashtra, registered with MahaRERA as P52100079555 on 12 Mar 2025. Possession is promised by 30 May 2028. 2 of the 8 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.

At a glance

Project

  • NameAnand Dham
  • TypeOthers
  • Location
    • Bhamburda
    • Shivajinagar
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411005
  • Pincode411005
  • RERA no.P52100079555
  • ReraGenie IDRG-MH-31221

Builder

  • NameBelvalkar Landmarks LLP
  • Entity typePartnership

Key dates

this monthRegisteredMar 2025PromisedMay 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on12 Mar 2025
  • Promised completion30 May 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed71 files

Current status

25%2 of 8 units booked
31.6%Work done, per cost certificate

Figures as on 5 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Anand DhamNA44808

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 5 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 42%.

Anand Dham: 25% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure42%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises5%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks27%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 5 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed9

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots9
Open Space9

Land and ownership2

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area910 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared present
Charge in favour ofAditya Birla Capital Limited
Secured amountRs 20.00 crore
CERSAI search filedYes
Declared on17 Nov 2025
LandownerVillageDistrict
Vidyanand Vasudeo BelvalkarPune (M Corp.)Pune
ROLMER ENTERPRISES PRIVATE LIMITEDMumbai CityMumbai City

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI1481.39
Proposed, not sanctioned1,461 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., Plot No. 1, S. No. 15/1, Sarthak Terraces, Opp. Gandhi Lawns, Kothrud, Pune.411038
Estimated costRs 16.64 cr
Cost incurredRs 5.26 cr
Work done31.62%
BuildingWingEstimatedIncurred
Anand DhamNARs 15.48 crRs 4.58 cr
-NARs 1.15 crRs 68.16 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMr Manoj Tatooskar
EngineerMr Vivek chavan chavan
EngineerPOOJA ASHISH DESHPANDE
Chartered AccountantMr Pushpak Bogati
Chartered AccountantBogati & Co.
PartnerRole in project
Belvalkar Landmarks LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Jan 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Feb 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Feb 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 May 2028

Documents filed71

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: FORM_02A_ANAND DHAM_MAR 26.pdf5 Aug 2026
Withdrawal Update Form 1File: FORM_01_ANAND DHAM_JUN 26.pdf25 Jul 2026
Withdrawal Update Form 2File: FORM_02_ANAND DHAM_JUN 26.pdf25 Jul 2026
Withdrawal Update Form 3File: FORM 3 ANAND DHAM JUNE 26.pdf25 Jul 2026
Withdrawal Update Form 1File: FORM_01_Anand dham_Mar 26.pdf29 Apr 2026
Withdrawal Update Form 2File: FORM_02_ANAND DHAM_MAR 26.pdf29 Apr 2026
Withdrawal Update Form 3File: FORM 3 MARCH 26- ANAND DHAM.pdf29 Apr 2026
Withdrawal Update Form 1File: FORM_01_ANAND DHAM_DEC 25.pdf31 Jan 2026
Withdrawal Update Form 1File: FORM_01_ANAND DHAM_DEC 25.pdf31 Jan 2026
Withdrawal Update Form 2File: FORM_02_ANAND DHAM_DEC 25.pdf31 Jan 2026
Withdrawal Update Form 2File: FORM_02_ANAND DHAM_DEC 25.pdf31 Jan 2026
Withdrawal Update Form 3File: FORM 3 DEC 2025 ANAND DHAM.pdf31 Jan 2026
Withdrawal Update Form 3File: FORM 3 DEC 2025 ANAND DHAM.pdf31 Jan 2026
Withdrawal Update Form 1File: FORM_01_ANAND DHAM_SEPTu002725_ (1).pdf7 Nov 2025
Withdrawal Update Form 2File: FORM_02_ANAND DHAM_SEPTu002725 (1).pdf7 Nov 2025
Withdrawal Update Form 3File: FORM 3 ANAND DHAM SEPT 2025 (1).pdf7 Nov 2025
Form 5 (FY 2024-2025)File: Anand Dham Form 5.pdf18 Sep 2025
Withdrawal Update Form 1File: FORM01_Ananddham_Jun’25 Signed.pdf2 Sep 2025
Withdrawal Update Form 2File: FORM02_ANAND DHAM_JUNu002725.pdf2 Sep 2025
Withdrawal Update Form 3File: FORM 3 ANAND DHAM.pdf2 Sep 2025
Withdrawal Update Form 1File: Form 1 CERTIFICATE.pdf22 Aug 2025
Withdrawal Update Form 2File: FORM02_ANAND DHAM_JUNu002725.pdf22 Aug 2025
Withdrawal Update Form 3File: FORM 3 ANAND DHAM.pdf22 Aug 2025
Withdrawal Update Form 1File: FORM 01 ANANDDHAM MAR 25.pdf24 Jun 2025
Withdrawal Update Form 2File: FORM_2_ENGG_CERT_ANAND_DHAM.pdf24 Jun 2025
Withdrawal Update Form 3File: FORM 3 ANAND DHAM MARCH 2025.pdf24 Jun 2025
Form 1File: FORM 01 ANANDDHAM MAR 25.pdf11 Jun 2025
Form 2File: FORM 2 ANAND DHAM MARCH 25.pdf11 Jun 2025
Form 3File: FORM 3 ANAND DHAM MARCH 2025.pdf11 Jun 2025
Disclosure of Sold and Booked InventoryFile: Ananddham MARCH 2025 - SOLD & UNSOLD.pdf11 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Anand Dham Form 3.pdf6 Mar 2025
Proforma of Agreement for saleFile: Anand Dham -RERA ATS (3).pdf28 Feb 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: DECLATION ABOUT RERA BANK ACCOUNT.pdf19 Feb 2025
Other - FinanceFile: Declaration Cum Undertaking of Co- Promoter For Bank.pdf6 Feb 2025
Other - FinanceFile: Declaration cum Undertaking of Co- Promoter.pdf6 Feb 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: FORMAT B (1).pdf6 Feb 2025
Layout approvalFile: Layout Plan_compressed.pdf5 Feb 2025
Building plan approvalFile: Building Plan_compressed.pdf5 Feb 2025
Building plan approvalFile: Floor Plan_compressed.pdf5 Feb 2025
Copy of Layout Approval (in case of layout)File: Layout Plan_compressed.pdf5 Feb 2025
Declaration in FORM BFile: Form B Promoter_rotated.pdf5 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM_1_ARCH_ANAND_DHAM_V2.pdf5 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM_2_ENGG_CERT_ANAND_DHAM.pdf5 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: Floor Plan_compressed.pdf5 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: Building Plan_compressed.pdf5 Feb 2025
Declaration about Commencement CertificateFile: Declaration to Commencment Certificate.pdf5 Feb 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOUSURE OF INT IN OTHER REAL ESTAE ORG-NILESH PURKAR.pdf5 Feb 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest of Sameer Belwalkar-.pdf5 Feb 2025
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure of Finance.pdf5 Feb 2025
PAN CardFile: Belvalkar Landmark LLP PAN.pdf21 Jan 2025
Copy of the legal title reportFile: LEGAL TITLE REPORT ANAND DHAM-10.pdf21 Jan 2025
Copy of the legal title reportFile: LEGAL TITLE REPORT ANAND DHAM-9.pdf21 Jan 2025
Copy of the legal title reportFile: LEGAL TITLE REPORT ANAND DHAM-8.pdf21 Jan 2025
Copy of the legal title reportFile: LEGAL TITLE REPORT ANAND DHAM-7.pdf21 Jan 2025
Copy of the legal title reportFile: LEGAL TITLE REPORT ANAND DHAM-6.pdf21 Jan 2025
Copy of the legal title reportFile: LEGAL TITLE REPORT ANAND DHAM-5.pdf21 Jan 2025
Copy of the legal title reportFile: LEGAL TITLE REPORT ANAND DHAM-4.pdf21 Jan 2025
Copy of the legal title reportFile: LEGAL TITLE REPORT ANAND DHAM-3.pdf21 Jan 2025
Copy of the legal title reportFile: LEGAL TITLE REPORT ANAND DHAM-2.pdf21 Jan 2025
Copy of the legal title reportFile: LEGAL TITLE REPORT ANAND DHAM-1.pdf21 Jan 2025
Details of encumbrances concerned to FinanceFile: No Encumbrance Legal.pdf21 Jan 2025
Details of encumbrances concerned to FinanceFile: No Encumbrance Finance.pdf21 Jan 2025
Proforma of Allotment letterFile: Allotment Letter.pdf21 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf21 Jan 2025
CERSAI detailsFile: Cersai Declaration.pdf21 Jan 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: FORMAT A.pdf21 Jan 2025
Deviation Report with respect to Allotment letterFile: Deviation with Respect to Allotment Letter.pdf21 Jan 2025
Details of encumbrances concerned to LegalFile: No Encumbrance Legal.pdf21 Jan 2025
Details of encumbrances concerned to LegalFile: No Encumbrance Finance.pdf21 Jan 2025
Other - TechnicalFile: Annexure A.pdf21 Jan 2025
Deviation Report with respect to model copy of AgreementFile: Deviation Agreement To Sale 1.pdf21 Jan 2025

How this compares with Pune

25%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Anand Dham on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Shivajinagar13,700+ in Pune

Builder: Belvalkar Landmarks LLP

Belvalkar Landmarks LLP has 1 registration on MahaRERA, including Anand Dham. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Anand Dham is delayed beyond 30 May 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Anand Dham?

The registered promoter entity is Belvalkar Landmarks LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Anand Dham?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Anand Dham?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Anand Dham?

The professionals named in the filing: Architect: Mr Manoj Tatooskar; Engineer: Mr Vivek chavan chavan; Engineer: POOJA ASHISH DESHPANDE; Chartered Accountant: Mr Pushpak Bogati; Chartered Accountant: Bogati & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Anand Dham?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Anand Dham. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Anand Dham to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.