AMITY
By MOHTISHAM COMPLEXES PVT LTD
RG-KA-61165 · RERA PRM/KA/RERA/1257/334/PR/230522/004895 · Last updated on RERA Karnataka portal: 16 Mar 2026
Source: official RERA Karnataka filing
Red flags
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
Saved.
AMITY is a Residential/Group Housing project by MOHTISHAM COMPLEXES PVT LTD in Dakshina Kannada, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1257/334/PR/230522/004895 on 23 May 2022. Possession is promised by 28 Feb 2026. The completion date has moved by 12 months from the original filing. 88 of the 107 units on this registration are recorded sold or booked, and 16 of 16 construction stages are filed complete.
At a glance
Project
- NameAMITY
- TypeResidential/Group Housing
- Location
- Mangalore
- Dakshina Kannada
- 575001
- Pincode575001
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1257/334/PR/230522/004895
- ReraGenie IDRG-KA-61165
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on23 May 2022
- Promised completion28 Feb 2026
- Revised completionRevised to 28 Feb 2026 (originally 28 Feb 2025)
- Buildings1 building record
- Documents filed191 files
Current status
Figures as on 16 Mar 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| AMITY | - | - | - | 107 | 0 | 107 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 16 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
16 of 16 construction stages are filed complete.
Building: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 100% |
| Retaining wall (All types) | Not applicable |
| RCC or MS Framed structure | 100% |
| Masonry Construction | 100% |
| Plastering inside , outside & Ceiling | 100% |
| Joinery: Doors, Windows, Ventilators etc | 100% |
| Basic work of Water supply, Sanitary and Electrification | 100% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 100% |
| Railing and Grill fixing | 100% |
| Electrification, Water supply and Sanitary Finishing | 100% |
| Painting | 100% |
| Fire prevention and fire fighting fitting and fixture with network | 100% |
| Weather Proof work(tile,concrete) | Not applicable |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 100% |
| Internal and External work including landscapes as per sanctioned drawings | 100% |
Progress on shared amenities33
As on 16 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 100% |
| Sewage and Drainage System | Yes | 100% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 100% |
| Energy management | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Solid waste management and disposal | Yes | 100% |
| Emergency Evacuation services | Yes | 100% |
| Internal Roads & Footpaths | Yes | 100% |
| Electricity supply transformer and substation | Yes | 100% |
| Storm water drains | Yes | 100% |
| Use of renewable energy | Yes | 100% |
| Sewage Treatment Plant (STP) | Yes | 100% |
| Parks & Tree planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Electricity | Yes | 100% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 100% |
| Club House | Yes | 100% |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | Yes | 100% |
| Indoor Sports facility | Yes | 100% |
| Swimming Pool | Yes | 100% |
| Gym | Yes | 100% |
| Parks | Yes | 100% |
| Power Backup | Yes | 100% |
| Piped Gas | Yes | 100% |
| Water and Sanitation | Yes | 100% |
| Air Conditioning | Yes | 0% |
| Staircases | Yes | 100% |
| Lifts | Yes | 100% |
| Corridor/Lobbies | Yes | 100% |
| Fire escapes | Yes | 100% |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 100% |
Land and ownership1
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| MOHTISHAM COMPLEXES PVT LTD | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 45.80 cr | Rs 32.71 cr |
| On-site expenditure-Consultants Fees | Rs 90.00 lakh | Rs 1.58 cr |
| Payment of fees | Rs 50.00 lakh | - |
| On-site expenditure-Salaries of workers | Rs 30.00 lakh | Rs 12.97 lakh |
| On-site expenditure-Site Overhead | Rs 25.00 lakh | - |
| Payment of cess | Rs 20.00 lakh | - |
| On-site expenditure-Cost Of Services(Water, Electricity, Sewage) | Rs 5.00 lakh | Rs 3.47 cr |
| Payment of taxes | - | Rs 91.77 lakh |
| Payment of charges | - | Rs 3.11 cr |
| Principal sum and interest payable to financial institutions-Scheduled Banks | - | Rs 2.19 cr |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | DHARMARAJ ASSOCIATES |
| Engineer | N MANOHAR |
| Chartered Accountant | R KRISHNAN |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterAwaiting Approvals
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed191
As listed on the registration, under the names the promoter filed them with; the newest 80 of 191 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1257/334/PR/230522/004895 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: CA CERTIFICATE.pdf | 16 Mar 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Amity Architecture Certificate.pdf | 16 Mar 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: AMITY - FORM 6.pdf | 16 Mar 2026 |
| Q3 2025-26 Water supply and sewage board | 16 Mar 2026 |
| Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 16 Mar 2026 |
| Q3 2025-26 KPTCL- BESCOM | 16 Mar 2026 |
| Q3 2025-26 Fire and Safety | 16 Mar 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: CA CERTIFICATE.pdf | 16 Mar 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Amity Architecture Certificate.pdf | 16 Mar 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: AMITY - FORM 6.pdf | 16 Mar 2026 |
| Q4 2025-26 Water supply and sewage board | 16 Mar 2026 |
| Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 16 Mar 2026 |
| Q4 2025-26 KPTCL- BESCOM | 16 Mar 2026 |
| Q4 2025-26 Fire and Safety | 16 Mar 2026 |
| CANOPY OCCUPANCY CERTIFICATEFile: CANOPY OCCUPANCY CERTIFICATE.pdf | 29 Apr 2022 |
| FERNHILL OCCUPANCY CERTIFICATEFile: FERNHILL OCCUPANCY CERTIFICATE.pdf | 29 Apr 2022 |
| SALE AGREEMENT FORMATFile: SALE AGREEMENT RERA FORMAT AMITY.pdf | 29 Apr 2022 |
| SCHEDULE AFile: SCHEDULE 'A'.pdf | 29 Apr 2022 |
| SCHEDULE BFile: SCHEDULE 'B'.pdf | 29 Apr 2022 |
| SCHEDULE B1File: SCHEDULE 'B1'.pdf | 29 Apr 2022 |
| SCHEDULE CFile: SCHEDULE 'C'.pdf | 29 Apr 2022 |
| ATTACHEMENT A TO SCHEDULE CFile: Attchement 'A' to schedule - C.pdf | 29 Apr 2022 |
| SCHEDULE DFile: SCHEDULE 'D'.pdf | 29 Apr 2022 |
| SCHEDULE EFile: SCHEDULE 'E'.pdf | 29 Apr 2022 |
| SCHEDULE FFile: SCHEDULE 'F'.pdf | 29 Apr 2022 |
| SCHEDULE GFile: SCHEDULE 'G'.pdf | 29 Apr 2022 |
| SCHEDULE HFile: SCHEDULE 'H'.pdf | 29 Apr 2022 |
| SCHEDULE IFile: SCHEDULE 'I'.pdf | 29 Apr 2022 |
| SCHEDULE JFile: SCHEDULE 'J'.pdf | 29 Apr 2022 |
| SCHEDULE KFile: SCHEDULE 'K'.pdf | 29 Apr 2022 |
| SCHEDULE LFile: SCHEDULE 'L'.pdf | 29 Apr 2022 |
| SCHEDULE MFile: SCHEDULE 'M'.pdf | 29 Apr 2022 |
| SCHEDULE NFile: SCHEDULE 'N'.pdf | 29 Apr 2022 |
| SCHEDULE OFile: SCHEDULE 'O'.pdf | 29 Apr 2022 |
| SCHEDULE PFile: SCHEDULE 'P'.pdf | 29 Apr 2022 |
| CANOPY COMPLETION CERTIFICATEFile: 1 CANOPY COMPLETION CERTIFICATE DATEED 19122020.pdf | 19 Mar 2022 |
| CANOPY KSPCB CFO DATED 09122020File: 2 CANOPY KSPCB CFO DATED 09122020.pdf | 19 Mar 2022 |
| CANOPY FIRE CLEARANCE CERTIFICATE REIVSED DATE 29102020File: 3 CANOPY FIRE CLEARANCE CERTIFICATE REIVSED DATE 29102020.pdf | 19 Mar 2022 |
| CANOPY POWER SANCTION PERMANENTFile: 4 CANOPY POWER SANCTION PERMANENT.pdf | 19 Mar 2022 |
| CANOPY WATER CONNECTION ISSUED BY MCC DATED 15032021File: 5 CANOPY WATER CONNECTION ISSUED BY MCC DATED 15032021.pdf | 19 Mar 2022 |
| CANOPY AFFIDAVITFile: 6 CANOPY AFFIDAVIT.pdf | 19 Mar 2022 |
| CANOPY ENGINEERS CERTIFICATEFile: 7 CANOPY ENGINEERS CERTIFICATE.pdf | 19 Mar 2022 |
| CANOPY ARCHITECTS CERTIFICATEFile: 8 CANOPY ARCHITECT'S CERTIFICATE.pdf | 19 Mar 2022 |
| CANOPY CA CERTIFICATEFile: 9 CANOPY -Form 4CC.pdf | 19 Mar 2022 |
| FERNHILL COMPLETION CERTIFICATEFile: 10 FERNHILL COMPLETION CERTIFICATE DATED 12012021.pdf | 19 Mar 2022 |
| FERNHILL KSPCB CFO DATED 04122020File: 11 FERNHILL CFO from KSPCB dated 04122020.pdf | 19 Mar 2022 |
| FERNHILL FIRE CLEARANCE CERTIFICATE REIVSED DATE 17122020File: 12 FERNHILL FIRE CLEARANCE CERTIFICATE dated 17122020.pdf | 19 Mar 2022 |
| FERNHILL POWER SANCTION PERMANENTFile: 13 FERNHILL POWER SANCTION PERMANENT.pdf | 19 Mar 2022 |
| FERNHILL WATER SANCTION PERMANENTFile: 14 FERNHILL PERMANENT WATER CONNECTION.pdf | 19 Mar 2022 |
| FERNHILL WATER SANCTION PERMANENTFile: 15 FERNHILL PERMANENT WATER CONNECTION 2.pdf | 19 Mar 2022 |
| CANOPY AFFIDAVITFile: 16 FERNHILL AFFIDAVIT.pdf | 19 Mar 2022 |
| FERNHILL ENGINEERS CERTIFICATEFile: 17 ENGINEERS CERTIFICATE FERNHILL.pdf | 19 Mar 2022 |
| FERNHILL ARCHITECTS CERTIFICATEFile: 18 FERNHILL ARCHITECT'S CERTIFICATE.pdf | 19 Mar 2022 |
| FERNHILL CA CERTIFICATEFile: 19 FERNHILL FORM 4CC.pdf | 19 Mar 2022 |
| CANOPY FORM 4File: 20 Canopy FORM 4 CA CERTIFICATE.pdf | 19 Mar 2022 |
| FERNHILL FORM 4File: 21 FERNHILL FORM 4 CA CERTIFICATE.pdf | 19 Mar 2022 |
| CANOPY SCREENSHOTSFile: 22 SCREENSHOT CANOPY.pdf | 19 Mar 2022 |
| FERNHILL SCREENSHOTSFile: 23 FERNHILL SCREENSHOTS.pdf | 19 Mar 2022 |
| TEMPORARY ELECTRICITY BILLFile: Amity Apartment 140422.pdf | 17 Feb 2022 |
| TEMPERORARY CONNECTION LETTERFile: MESCOM LETTER.pdf | 17 Feb 2022 |
| Mangalore ZRFile: Mangalore ZR.pdf | 17 Feb 2022 |
| RERA BANK ACCOUNTFile: RERA BANK ACCOUNT.pdf | 3 Feb 2022 |
| NON LITIGATION AFFIDAVITFile: NON LITIGATION AFFIDAVIT.pdf | 3 Feb 2022 |
| FORM BFile: FORM B.pdf | 3 Feb 2022 |
| DRAFT AOSFile: SALE AGREEMENT DRAFT.pdf | 3 Feb 2022 |
| SCHEDUE AFile: SCHEDULE A.pdf | 3 Feb 2022 |
| SCHEDULE BFile: SCHEDULE B floor plan sample.pdf | 3 Feb 2022 |
| SCHEDULE BAFile: SCHEDULE BA parking plan sample.pdf | 3 Feb 2022 |
| SCHEDULE CFile: SCHEDULE C.pdf | 3 Feb 2022 |
| SCHEDULE DFile: SCHEDULE D.pdf | 3 Feb 2022 |
| SCHEDULE EFile: SCHEDULE E.pdf | 3 Feb 2022 |
| SCHEDULE FFile: SCHEDULE F.pdf | 3 Feb 2022 |
| SCHEDULE GFile: SCHEDULE G.pdf | 3 Feb 2022 |
| SCHEDULE HFile: SCHEDULE H.pdf | 3 Feb 2022 |
| SCHEDULE IFile: SCHEDULE I.pdf | 3 Feb 2022 |
| SCHEDULE JFile: SCHEDULE J.pdf | 3 Feb 2022 |
| SCHEDULE KFile: SCHEDULE K.pdf | 3 Feb 2022 |
| SCHEDULE LFile: SCHEDULE L.pdf | 3 Feb 2022 |
| SCHEDULE MFile: SCHEDULE M.pdf | 3 Feb 2022 |
| SCHEDULE NFile: SCHEDULE N.pdf | 3 Feb 2022 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| FERNHILL | NANTOOR, MANGALORE | Completed | - | No date filed |
| CANOPY | URWASTORE MANGALORE | Completed | - | No date filed |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Dakshina Kannada
Computed across the 620+ Dakshina Kannada projects on ReraGenie, from their own filings.
Keep AMITY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Dakshina Kannada620+ in Dakshina Kannada
Filed coordinates, straight-line distance. 63 registered projects within 2 km.
SHAFCON EDEN GARDEN
SHAFCON
BHARATHI SOWPARNIKA
BHARATHI BUILDERS AND DEVELOPERS
ABISH EVARA
ABISH BUILDERS PRIVATE LIMITED
ABISH VISTA
ABISH BUILDERS PRIVATE LIMITED
ROHAN NEST
PROPERTY REAL ESTATE & DEVELOPERS
C & A ONE
C & A INFRA REALTY
See every Dakshina Kannada project, with the district possession charts
Builder: MOHTISHAM COMPLEXES PVT LTD
Mohtisham Complexes Pvt Ltd has 2 registrations on RERA Karnataka, including FERNHILL and AMITY. Its filings declare 2 earlier projects, 1 of them declared completed. Read the full track record. See more projects on the Dakshina Kannada district page.
Frequently asked questions
What are my rights if AMITY is delayed beyond 28 Feb 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of AMITY?
The registered promoter entity is MOHTISHAM COMPLEXES PVT LTD, a company as per the filing. Its GSTIN 29AABCM3814A1ZX can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in AMITY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at AMITY?
The professionals named in the filing: Architect: DHARMARAJ ASSOCIATES; Engineer: N MANOHAR; Chartered Accountant: R KRISHNAN. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in AMITY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback