ReraGenieLog inGet a buyer report

Home / Browse projects / Nagpur, Maharashtra / ALTAIR

Registered No litigation declared Residential / Group Housing project

ALTAIR

By SRI BHAGIRATH REALTY PRIVATE LIMITED

RG-MH-80711 · RERA P50500053808 · Last updated on MahaRERA portal: 25 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
0 of 11Construction stages donefurthest along: Excavation, 90%
35 of 42Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 102 documents Report an error

ALTAIR is a Residential / Group Housing project by SRI BHAGIRATH REALTY PRIVATE LIMITED in Nagpur, Maharashtra, registered with MahaRERA as P50500053808 on 1 Dec 2023. Possession is promised by 31 Dec 2026. 7 of the 42 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.

At a glance

Project

  • NameALTAIR
  • TypeResidential / Group Housing
  • Location
    • PLOT NO. 231
    • CTS NO 1751
    • SHEET 60
    • TEMPLE BAZAR ROAD
    • CIVIL LINES
    • MOUZA-SITABULDI
    • Nagpur (M Corp.)
    • Nagpur (Urban)
    • Nagpur
    • 440001
  • Pincode440001
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500053808
  • ReraGenie IDRG-MH-80711

Builder

  • NameSRI BHAGIRATH REALTY PRIVATE LIMITED
  • Entity typeCompany
  • DirectorRAMESH BHAGIRATH RANDER

Key dates

this monthRegisteredDec 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on1 Dec 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed102 files

Current status

17%7 of 42 units booked

Figures as on 25 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ALTAIRNA302542042

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 25 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 90%.

ALTAIR: 39% average across the applicable activities

ActivityProgress
Excavation90%
Basement (if any)90%
Podiums (if any)0%
Plinth90%
Stilt Floor90%
Slabs of Super Structure33%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks34%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 25 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes5%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed170

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots170
Closed/Covered170

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,188 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityNagpur Municipal Corporation (NMC)
Permissible FSI21235.2
Proposed, not sanctioned21,234 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBANK OF INDIA BUILDING, S V PATEL ROAD, NAGPUR

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSKA CONSORTIUM
EngineerSHIVESH KOLHE
EngineerREHAN QAMAR
Chartered AccountantSumit R Chandwani
Chartered AccountantAshish Agrawal
PartnerRole in project
SRI BHAGIRATH REALTY PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Oct 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Apr 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Apr 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed102

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 102 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 Architect Certificate March 2026.pdf25 Apr 2026
Form 2File: Form 2 Engineer Certificate March 2026.pdf25 Apr 2026
Form 3File: Form 3 CA Certificate March 2026.pdf25 Apr 2026
Disclosure of Sold and Booked InventoryFile: Sold Book Inventory.pdf25 Apr 2026
Form 1File: Architect Certificate Dec 25.pdf21 Jan 2026
Form 2File: Engineer Certificate Dec 25.pdf21 Jan 2026
Form 3File: CA Certificate Dec 25.pdf21 Jan 2026
Disclosure of Sold and Booked InventoryFile: Sold Book Inventory Dec 25.pdf21 Jan 2026
Form 1File: Form 1 Architect's Certificate Sept 25.pdf25 Oct 2025
Form 2File: Form 2 Engineer's Certificate Sept 25.pdf25 Oct 2025
Form 3File: Form 3 CA Certificate Sept 25.pdf25 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory Sept 25.pdf25 Oct 2025
Form 2A (FY 2024-2025)File: Form 2A FY 24-25_ALTAIR.pdf30 Sep 2025
Form 5 (FY 2024-2025)File: Form 5 FY 24-25 Altair.pdf30 Sep 2025
Form 1File: Architects certificate.pdf22 Jul 2025
Form 2File: Engineer Certificate.pdf22 Jul 2025
Form 3File: Final CA Certificate..pdf22 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Book Inventory.pdf22 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 CA Certificate.pdf20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Engineers Certificate.pdf20 Apr 2025
Layout approvalFile: plan 1.pdf18 Apr 2025
Layout approvalFile: plan 2.pdf18 Apr 2025
Layout approvalFile: plan 3.pdf18 Apr 2025
Building plan approvalFile: plan 4.pdf18 Apr 2025
Building plan approvalFile: plan 5.pdf18 Apr 2025
Building plan approvalFile: plan 6.pdf18 Apr 2025
Copy of Layout Approval (in case of layout)File: plan 1.pdf18 Apr 2025
Copy of Layout Approval (in case of layout)File: plan 2.pdf18 Apr 2025
Copy of Layout Approval (in case of layout)File: plan 3.pdf18 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf18 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: building permit.pdf18 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: plan 4.pdf18 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: plan 5.pdf18 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: plan 6.pdf18 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Book Inventory.pdf18 Apr 2025
Declaration about Commencement CertificateFile: form d.pdf18 Apr 2025
Declaration about Commencement CertificateFile: Form D.pdf2 Apr 2025
Building plan approvalFile: SANCTION PLAN 1.pdf1 Apr 2025
Building plan approvalFile: SANCTION PLAN 2.pdf1 Apr 2025
Building plan approvalFile: SANCTION PLAN 6.pdf1 Apr 2025
Building plan approvalFile: SANCTION PLAN 4.pdf1 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4.pdf1 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: building permit.pdf1 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: SANCTION PLAN 1.pdf1 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: SANCTION PLAN 2.pdf1 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: SANCTION PLAN 6.pdf1 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: SANCTION PLAN 4.pdf1 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 Form 3 - Altair - Dec 24.pdf28 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form 1 - Altair - Dec 24.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Form 2 - Altair - Dec 24.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: 5 Sold Booked Inv - Altair - Dec 24.pdf20 Jan 2025
Declaration about Commencement CertificateFile: 4 Form D - Altair - Sep 24.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form 1 - Altair - Sep 24.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 Form 3 - Altair - Sep 24.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Form 2 - Altair - Sep 24.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: 5 Sold Book Inventory - Altair - Sep 24.pdf19 Oct 2024
Declaration about Commencement CertificateFile: 4 Form D - Altair - Sep 24.pdf19 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2 FORM 2A - Altair - FY 23-24.pdf19 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 1 FORM 5 - Altair - FY 23-24.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Form 2 - Altair - June 24.pdf2 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form 1 - Altair - June 24.pdf1 Aug 2024
Disclosure of sold/ booked inventoryFile: 4 Sold Book Inventory - Altair - June 24.pdf27 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 Form 3 - Altair - June 24.pdf27 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg_removed.pdf29 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate ALTAIR.pdf29 Apr 2024
Declaration about Commencement CertificateFile: Form D.pdf26 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf26 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold Book Inventory.pdf26 Apr 2024
Other - TechnicalFile: cc verification.pdf23 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sri Bhagirat CA Certificate.pdf19 Oct 2023
Copy of the legal title reportFile: Tittle Verification.pdf18 Oct 2023
Copy of the legal title reportFile: Legal Tittle Report (1).pdf9 Oct 2023
Proforma of Agreement for saleFile: DRAFT AGREEMENT FOR RERA-1.pdf9 Oct 2023
Proforma of Allotment letterFile: allotment letter.pdf9 Oct 2023
Layout approvalFile: SANCTION PLAN 1.pdf2 Oct 2023
Layout approvalFile: SANCTION PLAN 2.pdf2 Oct 2023
Layout approvalFile: SANCTION PLAN 3.pdf2 Oct 2023
Building plan approvalFile: SANCTION PLAN 1.pdf2 Oct 2023
Building plan approvalFile: SANCTION PLAN 2.pdf2 Oct 2023
Building plan approvalFile: SANCTION PLAN 3.pdf2 Oct 2023

How this compares with Nagpur

17%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ALTAIR on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MOUZA-SITABULDI2,800+ in Nagpur

2 kmALTAIRCompleted 42Lapsed / revoked 21Other 53Dot size: filed unitsN

Filed coordinates, straight-line distance. 116 registered projects within 2 km.

Builder: SRI BHAGIRATH REALTY PRIVATE LIMITED

SRI BHAGIRATH REALTY PRIVATE LIMITED has 1 registration on MahaRERA, including ALTAIR. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if ALTAIR is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ALTAIR?

The registered promoter entity is SRI BHAGIRATH REALTY PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ALTAIR?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ALTAIR?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ALTAIR?

The professionals named in the filing: Architect: SKA CONSORTIUM; Engineer: SHIVESH KOLHE; Engineer: REHAN QAMAR; Chartered Accountant: Sumit R Chandwani; Chartered Accountant: Ashish Agrawal. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ALTAIR?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ALTAIR. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ALTAIR to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.