Home / Browse projects / Pune, Maharashtra / AKSHA AMBAR II
AKSHA AMBAR II
RG-MH-18839 · RERA P52100077655 · Last updated on MahaRERA portal: 18 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
AKSHA AMBAR II is a Others project by CONCORD PROPERTIES in Pune, Maharashtra, registered with MahaRERA as P52100077655 on 17 Oct 2024. Possession is promised by 31 Dec 2027. 83 of the 141 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.
At a glance
Project
- NameAKSHA AMBAR II
- TypeOthers
- Location
- DUDULGAON
- Pimpri Chinchawad (M Corp.)
- Haveli
- Pune
- 412105
- Pincode412105
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100077655
- ReraGenie IDRG-MH-18839
Builder
- NameCONCORD PROPERTIES
- Entity typePartnership
- GSTIN27AAHFC6875G1Z4
- PartnersBHARAT LALARAM CHOUDHARY, BABULAL POONARAM CHOUDHARY, MAHENDRA SURESH THAKUR, FATIMA ABDULREHMAN CHAUDHARY, IMRAN ABDULREHMAN CHAUDHARY, ZIKRULLAH ABBASALI CHAUDHARY, SATISHKUMAR RAVJIBHAI PATEL
- Other registrations2 more →
- Completed1 of 3
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on17 Oct 2024
- Promised completion31 Dec 2027
- Revised completionNone
- Buildings1 building record
- Documents filed76 files
Current status
Figures as on 18 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A BUILDING | NA | 12 | 0 | 124 | 17 | 141 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 18 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 55%.
A BUILDING: 46% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 55% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 40% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 10% |
Progress on shared amenities15
As on 18 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed235
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership17
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| SANDEEP KISAN GONDEKAR | Alandi Rural | Pune |
| GITA DATTA VAJE | Alandi Rural | Pune |
| ASHWINI SACHIN ARGADE | Alandi Rural | Pune |
| SHITAL KANTILAL GHANVAT | Alandi Rural | Pune |
| USHA SHAHJI OZARKAR | Alandi Rural | Pune |
| ASHABAI BALU PATHADE | Alandi Rural | Pune |
| RAJSHRI KRISHNA AKA BABU KU-HADE | Alandi Rural | Pune |
| INDUBAI KRISHNA AKA BABU KU-HADE | Alandi Rural | Pune |
| MAYUR AKA MALHARI KRISHNA AKA BABU KU-HADE | Alandi Rural | Pune |
| SACHIN KRISHNA AKA BABU KURHADE | Alandi Rural | Pune |
| BABUBAI VITHOBA KU-HADE | Alandi Rural | Pune |
| ROHIT VIJAY SHINDE | Alandi Rural | Pune |
| SUVARNA ATUL GUNDAL | Alandi Rural | Pune |
| PUSHPA AKA CHANDRABHAGA VIJAY SHINDE | Alandi Rural | Pune |
| MINAL SACHIN SHINDE | Alandi Rural | Pune |
| SANDEEP VIJAY KU-HADE | Alandi Rural | Pune |
| KAVIITA VIJAY KU-HADE | Alandi Rural | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| A BUILDING | NA | Rs 32.00 cr | Rs 24.27 cr |
| - | NA | Rs 1.00 cr | - |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | DREAM SPACE |
| Engineer | SANGRAM PATIL |
| Engineer | Shailesh Oswal |
| Chartered Accountant | PGMJ & ASSOCIATES |
| Chartered Accountant | NITISH VAIDYA & ASSOCIATES |
| Partner | Role in project |
|---|---|
| CONCORD PROPERTIES | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 27 Jun 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 22 Jul 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 26 Jun 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 26 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed76
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 1 Q4 FY 25-26.pdf | 18 Apr 2026 |
| Withdrawal Update Form 2File: FORM 2 Q4 FY 25-26.pdf | 18 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 Q4 FY 25-26.pdf | 18 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 Q3 FY 25-26.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 Q3 FY 25-26.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 Q3 FY 25-26.pdf | 20 Jan 2026 |
| Withdrawal Update Form 1File: Q2 FORM 1 AKSHA AMBAR II ARCHITECT CERTIFICATE.pdf | 16 Oct 2025 |
| Withdrawal Update Form 2File: Q2 FORM 2 AKSHA AMBAR II ENGINEER CERTIFICATE (1).pdf | 16 Oct 2025 |
| Withdrawal Update Form 3File: Q2 FORM 3 AMBAR II CA CERTIFICATE.pdf | 16 Oct 2025 |
| Withdrawal Update Form 1File: AKSHA AMBAR 2 FORM 1 ARCHITECT CERTIFICATE.pdf | 15 Oct 2025 |
| Withdrawal Update Form 2File: FORM 2 ENGINEER CERTIFICATE AKSHA AMBAR II.pdf | 15 Oct 2025 |
| Withdrawal Update Form 3File: AKSHA AMBAR II FORM 3 CA CERTIFICATE.pdf | 15 Oct 2025 |
| Form 5 (FY 2024-2025)File: Form 5 Final.pdf | 30 Sep 2025 |
| Form 1File: FORM 1 AKSHA AMBAR ll.pdf | 16 Jul 2025 |
| Form 2File: FORM 2 AKSHA AMBAR ll.pdf | 16 Jul 2025 |
| Form 3File: Form 3 Final.pdf | 16 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY AMBAR II A WING.pdf | 16 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Final.pdf | 22 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 AKSHA AMBAR ll.pdf | 20 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 AKSHA AMBAR ll.pdf | 20 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD INVENTORY AMBAR II A WING.pdf | 20 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE AKSHA AMBAR II.pdf | 18 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 FY 24-25 Q3_.pdf | 18 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENG CERTIFICATE AKSHA AMBAR II.pdf | 18 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: AMBAR II SOLD CIRCULAR-.pdf | 18 Feb 2025 |
| Deviation Report with respect to model copy of AgreementFile: AKSHA AMBAR ll DEVIATION REPORT_compressed.pdf | 22 Jan 2025 |
| Proforma of Agreement for saleFile: Agreement To Sale.pdf | 22 Jan 2025 |
| Other - FinanceFile: Declartion Uploaded.pdf | 14 Oct 2024 |
| Other - LegalFile: DECLARATION.pdf | 7 Oct 2024 |
| Other - LegalFile: DECLARATION 1.pdf | 7 Oct 2024 |
| Other - LegalFile: DECLARATION 2.pdf | 7 Oct 2024 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf | 7 Oct 2024 |
| Other - FinanceFile: DECLARATION.pdf | 7 Oct 2024 |
| Other - FinanceFile: DECLARATION 1.pdf | 7 Oct 2024 |
| Other - FinanceFile: DECLARATION 2.pdf | 7 Oct 2024 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B Final.pdf | 7 Oct 2024 |
| Other - LegalFile: DECLARATION Kavita.pdf | 11 Aug 2024 |
| Other - LegalFile: DECLARATION PUSHPA.pdf | 11 Aug 2024 |
| Other - LegalFile: DECLARATION Sachin.pdf | 11 Aug 2024 |
| Other - TechnicalFile: CC Mail.pdf | 5 Aug 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Promoter Declaration BABULAL CHAUDHARY.pdf | 5 Aug 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Promoter Declaration BHARAT CHAUDHARY.pdf | 5 Aug 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Promoter Declaration FATIMA BANO CHAUDHARY.pdf | 5 Aug 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Promoter Declaration IMRAN CHAUDHARY.pdf | 5 Aug 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Promoter Declaration SATISH PATEL.pdf | 5 Aug 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Promoter Declartion MAHINDER THAKUR.pdf | 5 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Signed Edit in Carpet_compressed (1).pdf | 26 Jul 2024 |
| Other - TechnicalFile: Order 50.pdf | 25 Jul 2024 |
| Layout approvalFile: LAYOUT Uploaded.pdf | 22 Jul 2024 |
| Details of encumbrances concerned to FinanceFile: No Financial Encumbrance.pdf | 22 Jul 2024 |
| Details of encumbrances concerned to FinanceFile: No Legal Encumbrance.pdf | 22 Jul 2024 |
| Copy of Layout Approval (in case of layout)File: LAYOUT Uploaded.pdf | 22 Jul 2024 |
| Proforma of Allotment letterFile: FINAL ALLOTMENT LETTER.pdf | 22 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 FINAL Uploaded.pdf | 22 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Uploaded.pdf | 22 Jul 2024 |
| CERSAI detailsFile: CERSAI REPORT.pdf | 22 Jul 2024 |
| Deviation Report with respect to Allotment letterFile: No Deviation Allotment Letter.pdf | 22 Jul 2024 |
| Details of encumbrances concerned to LegalFile: No Financial Encumbrance.pdf | 22 Jul 2024 |
| Details of encumbrances concerned to LegalFile: No Legal Encumbrance.pdf | 22 Jul 2024 |
| Deviation Report with respect to model copy of AgreementFile: No Deviation Agreement to sale.pdf | 22 Jul 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Promoter Decalration ZIKRULLAH CHAUDHARY.pdf | 22 Jul 2024 |
| Disclosure for secured/unsecured finance availed for the projectFile: Discloser availed for the project.pdf | 22 Jul 2024 |
| Copy of the legal title reportFile: Final Legal Title_compressed.pdf | 27 Jun 2024 |
| Proforma of Agreement for saleFile: Final Agreement To Sale.pdf | 27 Jun 2024 |
| Building plan approvalFile: FRONT ELEVATION.pdf | 26 Jun 2024 |
| Building plan approvalFile: TERRACE FLOOR PLAN.pdf | 26 Jun 2024 |
| Building plan approvalFile: SHOPS FLOOR PLAN.pdf | 26 Jun 2024 |
| Building plan approvalFile: LIFT ELEVATION PARKING.pdf | 26 Jun 2024 |
| PAN CardFile: Firm PAN.pdf | 26 Jun 2024 |
| Declaration in FORM BFile: FORM B Of Promoter.pdf | 26 Jun 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement.pdf | 26 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: LIFT ELEVATION PARKING.pdf | 26 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: SHOPS FLOOR PLAN.pdf | 26 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: TERRACE FLOOR PLAN.pdf | 26 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: FRONT ELEVATION.pdf | 26 Jun 2024 |
| Declaration about Commencement CertificateFile: Declaration about CC.pdf | 26 Jun 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 76 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep AKSHA AMBAR II on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near DUDULGAON13,700+ in Pune
Filed coordinates, straight-line distance. 155 registered projects within 2 km.
TANISH PARK
TANISH DEVELOPERS
Ajinkya Towers
APAK Bussiness Innovation Pvt Ltd
SILVER GARDENIA
SILVER PROMOTERS AND DEVELOPERS
Mangalam Life Park
Mangalam Buildcorp
SingaPune Ph 3
Xrbia Mirth Properties LLP
SingaPune Ph 2
Xrbia Mirth Properties LLP
Builder: CONCORD PROPERTIES
Concord Properties has 3 registrations on MahaRERA, including AKSHA AMULYAM and AKSHA AMBAR. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if AKSHA AMBAR II is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of AKSHA AMBAR II?
The registered promoter entity is CONCORD PROPERTIES, a partnership as per the filing. Its GSTIN 27AAHFC6875G1Z4 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in AKSHA AMBAR II?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for AKSHA AMBAR II?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at AKSHA AMBAR II?
The professionals named in the filing: Architect: DREAM SPACE; Engineer: SANGRAM PATIL; Engineer: Shailesh Oswal; Chartered Accountant: PGMJ & ASSOCIATES; Chartered Accountant: NITISH VAIDYA & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in AKSHA AMBAR II?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback