Registered Litigation declared Residential / Group Housing project

AKSA TOWER

By HFI INDUSTRIES

RG-MH-07285 · RERA P51800055503 · Last updated on MahaRERA portal: 20 Jul 2026

Source: official MahaRERA filing

Red flags

  • Possession 1 months past the filed date
  • Litigation declared, 1 case
  • 1 complaint at MahaRERA
  • Completion date moved by 18 months
  • 2 extensions taken

Clear

  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Sep 2026Possession promised1 month past this date
9 of 11Construction stages donefurthest along: Basement (if any), 0%
49 of 65Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 79 documents Report an error

AKSA TOWER is a Residential / Group Housing project by HFI INDUSTRIES in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800055503 on 2 Apr 2024. Possession was promised by 30 Sep 2026 and is now 1 months past that date. The completion date has moved by 18 months from the original filing. 16 of the 65 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameAKSA TOWER
  • TypeResidential / Group Housing
  • Location
    • FAIRDEAL ROAD
    • JOGESHWARI
    • Bandivali
    • Andheri
    • Mumbai Suburban
    • 400102
  • Pincode400102
  • RERA no.P51800055503
  • ReraGenie IDRG-MH-07285

Builder

  • NameHFI INDUSTRIES
  • Entity typePartnership
  • PartnersMOHAMED FAROOQUE HANIF JATU, HANIF MUSHTAK KHAN, SHABBIR NAZIR KHAN, ASHFAQ NAZIR KHAN, MOHAMED TARIQ FAROOQUE JATU, MOHAMED SADIQ FAROOQUE JATU, FAISAL FAROOQUE JATU, IQBAL ABDUL KHALID AHMED

Key dates

1 months past promisethis monthRegisteredApr 2024First promiseMar 2025Revised toSep 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on2 Apr 2024
  • Promised completion30 Sep 2026
  • Revised completionRevised to 30 Sep 2026 (originally 31 Mar 2025)
  • Buildings1 building record
  • Documents filed79 files

Current status

25%16 of 65 units booked
92.5%Work done, per cost certificate

Figures as on 20 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING 3FNA181765065

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

BUILDING 3F: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 20 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed43

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots43
Closed/Covered43

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area6,512 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on23 Jul 2025
LandownerVillageDistrict
S K BuildersAndheriMumbai Suburban
Abdul Ahad Vajid AlikhanAndheriMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI4225.59
Proposed, not sanctioned4,226 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMADINA MANZIL S V ROAD GOREGAON WEST MUMBAI
Estimated costRs 26.14 cr
Cost incurredRs 24.17 cr
Work done92.46%
BuildingWingEstimatedIncurred
BUILDING 3FNARs 25.04 crRs 23.50 cr
-NARs 1.10 crRs 66.69 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSARANG ARCHITECT
EngineerHanware Consultants
EngineerNILESH GURAL DALWANI
Chartered AccountantSHASHANK R JAIN AND ASSOCIATES
Chartered AccountantParas Thakkar Associates
PartnerRole in project
HFI INDUSTRIES-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800024787Mar 2025 → Nov 2025

Reason as filed by the promoterWe are making the application to Extend the completion date of our above project Under Section 6 of Real Estate (Regulations and Development) Act, 2016 upto 30/11/2025

EA12112518311Mar 2025 → Sep 2026

Reason as filed by the promoterWe are in the process of obtaining the requisite No Objection Certificates (NOCs) necessary for the issuance of the Occupation Certificate (OC). We anticipate receiving the OC well before 30th August 2026. The on-site work has been completed up to approximately 85% overall.

Litigation declared1

CaseCourtStatus
165/2023/2023Hon'ble Bombay High CourtOngoing

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000480028dilawar sikandar khanHFI INDUSTRIES TAREEQ JHATU17/04/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Mar 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Jan 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Jan 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed79

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 HFI 30062026.pdf20 Jul 2026
Withdrawal Update Form 2File: Form 2 HFI 30062026.pdf20 Jul 2026
Withdrawal Update Form 3File: Form 3 HFI 30062026_compressed.pdf20 Jul 2026
Form 2A (FY 2025-2026)File: Form 2A System Generated of HFI FY 25-26 SCAN.pdf9 Jun 2026
Withdrawal Update Form 1File: Form 1.pdf21 Apr 2026
Withdrawal Update Form 2File: form 2.pdf21 Apr 2026
Withdrawal Update Form 3File: Form 3.pdf21 Apr 2026
Withdrawal Update Form 1File: HFI RERA FORM - 1.pdf20 Jan 2026
Withdrawal Update Form 2File: HFI RERA FORM - 2.pdf20 Jan 2026
Withdrawal Update Form 3File: HFI RERA Form - 3.pdf20 Jan 2026
Form 2A (FY 2024-2025)File: Form 2A System Generated 31032025 Signed.pdf18 Nov 2025
Form 5 (FY 2024-2025)File: Form 5 HFI 31032025 -Signed.pdf10 Nov 2025
Withdrawal Update Form 1File: Form 1 HFI 30092025.pdf13 Oct 2025
Withdrawal Update Form 2File: Form 2 HFI 30092025.pdf13 Oct 2025
Withdrawal Update Form 3File: Form 3 HFI 30092025.pdf13 Oct 2025
Withdrawal Update Form 1File: Form-1 of HFI 30062025.pdf11 Aug 2025
Withdrawal Update Form 2File: Form -2 of HFI 30062025.pdf11 Aug 2025
Withdrawal Update Form 3File: Form 3 of HFI 30062025.pdf11 Aug 2025
Form 1File: Form-1 of HFI 30062025.pdf18 Jul 2025
Form 2File: Form -2 of HFI 30062025.pdf18 Jul 2025
Form 3File: Form 3 of HFI 30062025.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold & unsold of HFI 30062025.pdf18 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31032025.pdf25 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 HFI 31032025 - Final.pdf25 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 31032025.pdf25 Apr 2025
Other - TechnicalFile: RESIGNATION LETTER TO MAHARERA FOR HFI PROJECT - AQSA TOWER.pdf10 Mar 2025
Declaration about Commencement CertificateFile: DECLARATION ABOUT CC.pdf24 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf21 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERTIFICATE.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Aksa Tower 31122024_Scanned.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG CERTIFICATE.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 architect 30092024.pdf21 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 30092024 final-compressed.pdf21 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 engineering 30092024.pdf21 Oct 2024
Declaration in FORM BFile: Form B.pdf16 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold 300624.pdf16 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold 300924.pdf16 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold 151024.pdf16 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf8 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf8 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 HFI 30062024.pdf8 Aug 2024
Copy of the legal title reportFile: Title report of Aksa pdf with Stamp.pdf27 Mar 2024
Other - LegalFile: Order No 50.pdf23 Mar 2024
Other - LegalFile: Declaration of Plot Area Megerd.pdf23 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: BMC Letter.pdf27 Feb 2024
Declaration about Commencement CertificateFile: Declaration of CC.pdf27 Feb 2024
Proforma of Agreement for saleFile: AGREEMENT FOR SALE.pdf27 Feb 2024
Other - TechnicalFile: BMC Letter.pdf27 Feb 2024
Deviation Report with respect to model copy of AgreementFile: DEVIATION SHEET of AFS.pdf26 Jan 2024
Details of encumbrances concerned to FinanceFile: LEGAL ENCUMBRANCE.pdf25 Jan 2024
Details of encumbrances concerned to LegalFile: LEGAL ENCUMBRANCE.pdf25 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: Notesheet.pdf25 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer certificate.pdf25 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf25 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DOI-FAROOQUE-1.pdf25 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DOI-TARIQ-2.pdf25 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DOI-SADIQ-3.pdf25 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DOI-FAISAL-4.pdf25 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DOI-HANIF-5.pdf25 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DOI-SHABIR-6.pdf25 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DOI-ASHFAQ-7.pdf25 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DOI-IQBAL-8.pdf25 Jan 2024
Other - LegalFile: HFI - Deed of Retirment and Reconstitution of Partnership _compressed.pdf25 Jan 2024
Layout approvalFile: Drawing-1-2.pdf15 Jan 2024
Building plan approvalFile: Drawing-1-2.pdf15 Jan 2024
Building plan approvalFile: Drawing -3-4.pdf15 Jan 2024
Copy of Layout Approval (in case of layout)File: Drawing-1-2.pdf15 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: Drawing-1-2.pdf15 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: Drawing -3-4.pdf15 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Arch Certificate.pdf15 Jan 2024
Details of encumbrances concerned to FinanceFile: ENCUMBERANCE TO LEGAL-Final-mERGED.pdf5 Jan 2024
Details of encumbrances concerned to LegalFile: ENCUMBERANCE TO LEGAL-Final-mERGED.pdf5 Jan 2024
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf26 Dec 2023
Deviation Report with respect to Allotment letterFile: Deviation Report - Allotment Letter 1.pdf21 Dec 2023
Declaration in FORM BFile: Form - B.pdf14 Dec 2023
PAN CardFile: HFI PAN CARD.pdf13 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: CC TO BE UPLOADED.pdf13 Dec 2023
CERSAI detailsFile: DECLARTION OF CERSAI.pdf13 Dec 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK ACOUNT DECLARATION.pdf13 Dec 2023

How this compares with Mumbai Suburban

25%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 18 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AKSA TOWER on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near JOGESHWARI6,700+ in Mumbai Suburban

Builder: HFI INDUSTRIES

HFI INDUSTRIES has 1 registration on MahaRERA, including AKSA TOWER. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if AKSA TOWER is delayed beyond 30 Sep 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AKSA TOWER?

The registered promoter entity is HFI INDUSTRIES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AKSA TOWER?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against AKSA TOWER?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for AKSA TOWER?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AKSA TOWER?

The professionals named in the filing: Architect: SARANG ARCHITECT; Engineer: Hanware Consultants; Engineer: NILESH GURAL DALWANI; Chartered Accountant: SHASHANK R JAIN AND ASSOCIATES; Chartered Accountant: Paras Thakkar Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AKSA TOWER?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AKSA TOWER. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AKSA TOWER to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.