Home / Browse projects / Ahmednagar, Maharashtra / AKASHGANGA
AKASHGANGA
RG-MH-00392 · RERA P52200000214 · Last updated on MahaRERA portal: 12 Mar 2025
Source: official MahaRERA filing
Red flags
- Completion date moved by 126 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Ahmednagar registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
AKASHGANGA is a Residential / Group Housing project by NAVRANG DEVELOPERS in Ahmednagar, Maharashtra, registered with MahaRERA as P52200000214 on 10 Jul 2017. The registration is recorded completed; possession was promised by 31 Dec 2029. The completion date has moved by 126 months from the original filing.
At a glance
Project
- NameAKASHGANGA
- TypeResidential / Group Housing
- Location
- MANDAVGAN
- LAXMINAGAR
- Shrigonda(MCL)
- Shrigonda
- Ahmednagar
- 413701
- Pincode413701
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52200000214
- ReraGenie IDRG-MH-00392
Builder
- NameNAVRANG DEVELOPERS
- Entity typePartnership
- PartnersMILIND RAMDAS POTE, MANOHAR RAMDAS POTE, VILAS DHONDIBHAU SHITOLE, DATTATRAY SURYABHAN DESHMUKH, SATISH NARAYAN KASARE, SACHIN NARAYAN KASARE, NITA SUNIL JADHAV, DATTATRAY BABASAHEB SHITOLE
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on10 Jul 2017
- Promised completion31 Dec 2029
- Revised completionRevised to 31 Dec 2029 (originally 6 Jun 2019)
- Buildings1 building record
- Documents filed81 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Akashganga-C | NA | 8 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 12 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
Akashganga-C: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 12 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 100% |
Parking filed48
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | PRASAD SHRIPAD KULKARNI |
| Engineer | PANKSJ ZAWARE |
| Partner | Role in project |
|---|---|
| NAVRANG DEVELOPERS | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe have started construction of another wing. Wing C has already been completed in December 2018. Extension has been taken on account of recent circular stating One Plot One Registration
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 30 Jun 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 30 Jun 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 26 Dec 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 30 Jun 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 25 Jan 2021
Documents filed81
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of CA (Form 3)File: IMG_20250312_0001.pdf | 12 Mar 2025 |
| Other - TechnicalFile: Rera Fee.pdf | 14 Feb 2025 |
| Other - LegalFile: Cheque.pdf | 10 Feb 2025 |
| Other - FinanceFile: Cheque.pdf | 10 Feb 2025 |
| Other - TechnicalFile: Cheque.pdf | 10 Feb 2025 |
| Other - TechnicalFile: Letter For Demand Draft.pdf | 10 Feb 2025 |
| Other - LegalFile: self decl new.pdf | 15 Jan 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: FORMAT A new signed.pdf | 15 Jan 2025 |
| Other - TechnicalFile: Annexure A new signed.pdf | 15 Jan 2025 |
| Building plan approvalFile: Sanction Plan-highlighted-output.pdf | 26 Dec 2024 |
| Building Plan Approval (IOD)File: Sanction Plan-highlighted-output.pdf | 26 Dec 2024 |
| Declaration about Commencement CertificateFile: new decl abt commencement cert.pdf | 26 Dec 2024 |
| Declaration about Commencement CertificateFile: new decl abt commencement cert (ONLY wing b).pdf | 26 Dec 2024 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: format A navrang.pdf | 26 Dec 2024 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: RERA BANK ACCOUNT OPENING CERTIFICATE (1) NEW.pdf | 26 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 2A march 2020.pdf | 16 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 2A march 2021.pdf | 16 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2A march 2022.pdf | 16 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2A march 2023.pdf | 16 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2A march 2024.pdf | 16 Dec 2024 |
| Declaration in FORM BFile: form 9 B.pdf | 13 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: form 5 navrang 18-19.pdf | 13 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: form 5 navrang 19-20.pdf | 13 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: form 5 navrang 20-21.pdf | 13 Dec 2024 |
| Other - TechnicalFile: req letter.pdf | 13 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: form 5 navrang 21-22.pdf | 13 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 (22-23).pdf | 13 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 (23-24).pdf | 13 Dec 2024 |
| Certificates of CA (Form 5)File: form 5 navrang 23-24.pdf | 4 Dec 2024 |
| Certificates of CA (Form 5)File: form 5 navrang 22-23.pdf | 4 Dec 2024 |
| Certificates of CA (Form 5)File: form 5 navrang 20-21.pdf | 3 Dec 2024 |
| Certificates of CA (Form 5)File: form 5 navrang 21-22.pdf | 3 Dec 2024 |
| Certificates of CA (Form 5)File: form 5 navrang 19-20.pdf | 3 Dec 2024 |
| Certificates of CA (Form 5)File: form 5 navrang 18-19.pdf | 3 Dec 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 31-03-2023.pdf | 30 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30-09-2024.pdf | 30 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30-06-2024.pdf | 30 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 31-03-2024.pdf | 30 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30-09-2023.pdf | 30 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30-06-2023.pdf | 30 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 31-12-2023.pdf | 30 Nov 2024 |
| Certificates of CA (Form 3)File: FORM 3 MAR 23.pdf | 30 Nov 2024 |
| Certificates of CA (Form 3)File: FORM 3 JUN 23.pdf | 30 Nov 2024 |
| Certificates of CA (Form 3)File: FORM 3 SEP 23.pdf | 30 Nov 2024 |
| Certificates of CA (Form 3)File: FORM 3 DEC 23.pdf | 30 Nov 2024 |
| Certificates of CA (Form 3)File: FORM 3 MAR 24.pdf | 30 Nov 2024 |
| Certificates of CA (Form 3)File: FORM 3 JUN 24.pdf | 30 Nov 2024 |
| Certificates of CA (Form 3)File: FORM 3 SEP 24.pdf | 30 Nov 2024 |
| Certificates of CA (Form 3)File: 31 3 23.pdf | 28 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: 31 3 23.pdf | 27 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: 30 6 23.pdf | 27 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: 30 9 23.pdf | 27 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: 31 12 23.pdf | 27 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: 31 3 24.pdf | 27 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: 30 6 24.pdf | 27 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: 30 9 24.pdf | 27 Nov 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 31 March 2023.pdf | 23 Nov 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 30 june 2023.pdf | 23 Nov 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 30 Sep 2023.pdf | 23 Nov 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 31 Dec 2023.pdf | 23 Nov 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 31 march 24.pdf | 23 Nov 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 30 june 2024.pdf | 23 Nov 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 30 sep 2024.pdf | 23 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion certificate.pdf | 25 Jan 2021 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Society registration.pdf | 3 Jun 2019 |
| Certificates of CA (Form 5)File: Form-5.pdf | 11 Jan 2019 |
| Certificates of Architect (Form 4)File: FORM-4.pdf | 11 Jan 2019 |
| Certificates of CA (Form 5)File: NAVRANG.pdf | 10 Oct 2018 |
| Details of encumbrancesFile: Encrumbance Declaration.pdf | 6 Jul 2017 |
| Declaration in FORM BFile: Form- B Declaration-min.pdf | 6 Jul 2017 |
| Layout approvalFile: Layout.PDF | 30 Jun 2017 |
| Building plan approvalFile: Sanction plan.pdf | 30 Jun 2017 |
| PAN CardFile: PAN CARD.pdf | 30 Jun 2017 |
| Copy of the legal title reportFile: Search report.pdf | 30 Jun 2017 |
| Copy of Layout Approval (in case of layout)File: Layout.PDF | 30 Jun 2017 |
| Building Plan Approval (IOD)File: Sanction plan.pdf | 30 Jun 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement cerificate.pdf | 30 Jun 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA FORM- 1.pdf | 30 Jun 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM2.pdf | 30 Jun 2017 |
| Certificates of CA (Form 3)File: FORM- 3.pdf | 30 Jun 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Ahmednagar
Computed across the 490+ Ahmednagar projects on ReraGenie, from their own filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 81 filed documents as one ZIP, foldered, with a manifest
Keep AKASHGANGA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near LAXMINAGAR490+ in Ahmednagar
Filed coordinates, straight-line distance. 9 registered projects within 2 km.
YAMUNA ENCLAVE
Deepali Dattu Nawale
GANGOTRI PHASE 2
RAJENDRA BHAU GANJURE, VILAS SANJAY GANJUR
GIRIRAJ
S K DEVELOPERS
Gangotri Apartment
K.K. Developers
PANDHARI HEIGHTS
VASTU BUILDERS AND DEVELOPERS
Shiv Apartment
SHIV DEVELOPERS
See every Ahmednagar project, with the district possession charts
Builder: NAVRANG DEVELOPERS
NAVRANG DEVELOPERS has 1 registration on MahaRERA, including AKASHGANGA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Ahmednagar district page.
Frequently asked questions
What are my rights if AKASHGANGA is delayed beyond 31 Dec 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of AKASHGANGA?
The registered promoter entity is NAVRANG DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in AKASHGANGA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for AKASHGANGA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at AKASHGANGA?
The professionals named in the filing: Architect: PRASAD SHRIPAD KULKARNI; Engineer: PANKSJ ZAWARE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in AKASHGANGA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback