AG BUSINESS PARK
RG-MH-97167 · RERA P52100047954 · Last updated on MahaRERA portal: 30 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 24 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
AG BUSINESS PARK is a Commercial project by A G Constructions in Pune, Maharashtra, registered with MahaRERA as P52100047954 on 2 Dec 2022. Possession is promised by 31 Jan 2028. The completion date has moved by 24 months from the original filing. 0 of the 15 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.
At a glance
Project
- NameAG BUSINESS PARK
- TypeCommercial
- Location
- Baner
- Haveli
- Pune
- 411005
- Pincode411005
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100047954
- ReraGenie IDRG-MH-97167
Builder
- NameA G Constructions
- Entity typePartnership
- PartnerAbhijit Subhash Gaikwad
- Declared earlier projects4 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on2 Dec 2022
- Promised completion31 Jan 2028
- Revised completionRevised to 31 Jan 2028 (originally 31 Jan 2026)
- Buildings1 building record
- Documents filed191 files
Current status
Figures as on 30 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| AG BUSINESS PARK | NA | 21 | 15 | 0 | 15 | 15 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 30 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 95%.
AG BUSINESS PARK: 43% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 95% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 20% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 5% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 30 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed1678
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| AG BUSINESS PARK | NA | Rs 69.53 cr | Rs 34.78 cr |
| - | NA | Rs 6.28 cr | Rs 5.74 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | projection studio |
| Engineer | Nitin Narayan Marne |
| Chartered Accountant | CA Priyesh Jain |
| Chartered Accountant | M/S bhutada mundada & co |
| Chartered Accountant | nilesh raut |
| Partner | Role in project |
|---|---|
| A G Constructions | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe project completion date is required to be extended from 31/01/2026 to 31/01/2028 due to subsequent revision and increase in the sanctioned scope of the project. The project was earlier sanctioned up to 8 floors vide sanction dated 13/10/2022. Thereafter, revised sanction up to the 14th floor was obtained on 04/02/2025. Due to the additional sanctioned floors and related balance construction, services, finishing, and completion formalities, further time is required to complete the project as per the latest sanctioned plan. It is further submitted that no units have been sold or booked in th
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 24 Oct 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 30 May 2026 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 30 May 2026 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 12 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Jan 2028
Documents filed191
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 191 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Layout approvalFile: Sanction plan 1-15 01042026 Hi.pdf | 30 May 2026 |
| Building plan approvalFile: Sanction plan 2-15 01042026.pdf | 30 May 2026 |
| Building plan approvalFile: Sanction plan 3-15 01042026.pdf | 30 May 2026 |
| Building plan approvalFile: Sanction plan 4-15 01042026.pdf | 30 May 2026 |
| Building plan approvalFile: Sanction plan 5-15 01042026.pdf | 30 May 2026 |
| Building plan approvalFile: Sanction plan 6-15 01042026.pdf | 30 May 2026 |
| Building plan approvalFile: Sanction plan 7-15 01042026.pdf | 30 May 2026 |
| Building plan approvalFile: Sanction plan 8-15 01042026.pdf | 30 May 2026 |
| Building plan approvalFile: Sanction plan 9-15 01042026.pdf | 30 May 2026 |
| Building plan approvalFile: Sanction plan 10-15 01042026.pdf | 30 May 2026 |
| Building plan approvalFile: Sanction plan 11-15 01042026.pdf | 30 May 2026 |
| Building plan approvalFile: Sanction plan 12-15 01042026.pdf | 30 May 2026 |
| Building plan approvalFile: Sanction plan 13-15 01042026.pdf | 30 May 2026 |
| Building plan approvalFile: Sanction plan 14-15 01042026.pdf | 30 May 2026 |
| Building plan approvalFile: Sanction plan 15-15 01042026.pdf | 30 May 2026 |
| Form 2A (FY 2024-2025)File: scan-sign-copy_Form-2A Engineer Certificate_31032025.pdf | 13 May 2026 |
| Form 2A (FY 2025-2026)File: scan-sign-copy_Form-2A Engineer Certificate_31032026.pdf | 13 May 2026 |
| Form 5 (FY 2024-2025)File: Form-5 RERA Audit Report FY 2024-25.pdf | 13 May 2026 |
| Form 5 (FY 2025-2026)File: Form-5 RERA Audit Report FY 2025-26.pdf | 13 May 2026 |
| Withdrawal Update Form 1File: Form-1 Architect Certificate 31122025.pdf | 7 May 2026 |
| Withdrawal Update Form 2File: Form-2 Engineer Certificate 31122025.pdf | 7 May 2026 |
| Withdrawal Update Form 3File: Form-3 CA Certificate 31122025 v5.pdf | 7 May 2026 |
| Withdrawal Update Form 1File: Form-1 Architect Certificate 31122025.pdf | 6 May 2026 |
| Withdrawal Update Form 2File: Form-2 Engineer Certificate 31122025.pdf | 6 May 2026 |
| Withdrawal Update Form 3File: Form-3 CA Certificate 31122025 v5.pdf | 6 May 2026 |
| Form 2A (FY 2022-2023)File: Form-2A Quality Assurance FY 2022-23.pdf | 6 May 2026 |
| Form 2A (FY 2023-2024)File: Form-2A Quality Assurance FY 2023-24.pdf | 6 May 2026 |
| Form 1File: Form-1 Architect Certificate 30092025.pdf | 21 Feb 2026 |
| Form 2File: Form-2 Engineer Certificate 30092025.pdf | 21 Feb 2026 |
| Form 3File: Form-3 CA Certificate 30092025.pdf | 21 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory-30092025.pdf | 21 Feb 2026 |
| Form 1File: Form-1 Architect Certificate 31122025.pdf | 21 Feb 2026 |
| Form 2File: Form-2 Engineer Certificate 31122025.pdf | 21 Feb 2026 |
| Form 3File: Form-3 CA Certificate 31122025.pdf | 21 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory-31122025.pdf | 21 Feb 2026 |
| Form 1File: Form-1 Architect Certificate 30062025.pdf | 8 Aug 2025 |
| Form 2File: Form-2 Engineer Certificate 30062025.pdf | 8 Aug 2025 |
| Form 3File: Form-3 CA Certificate 30062025 Sign.pdf | 8 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Inventory Certificate 30062025.pdf | 8 Aug 2025 |
| Form 1File: Form-1 Architect Certificate 31032025.pdf | 8 Aug 2025 |
| Form 2File: Form-2 Engineer Certificate 31032025.pdf | 8 Aug 2025 |
| Form 3File: Form-3 CA Certificate 31032025 Sign.pdf | 8 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Inventory Certificate 31032025.pdf | 8 Aug 2025 |
| Form 1File: Form-1 Architect Certificate 31122024.pdf | 8 Aug 2025 |
| Form 2File: Form-2 Engineer Certificate 31122024.pdf | 8 Aug 2025 |
| Form 3File: Form-3 CA Certificate 31122024.pdf | 8 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory 31122024.pdf | 8 Aug 2025 |
| Form 1File: Form-1 Architect Certificate 30092024.pdf | 8 Aug 2025 |
| Form 2File: Form-2 Engineer Certificate 30092024.pdf | 8 Aug 2025 |
| Form 3File: Form-3 CA Certificate 30092024.pdf | 8 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory 30092024.pdf | 8 Aug 2025 |
| Form 1File: Form-1 Architect Certificate 30062024.pdf | 8 Aug 2025 |
| Form 2File: Form-2 Engineer Certificate 30062024.pdf | 8 Aug 2025 |
| Form 3File: Form-3 CA Certificate 30062024.pdf | 8 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory 30062024.pdf | 8 Aug 2025 |
| Form 1File: Form-1 Architect Certificate 31032024.pdf | 8 Aug 2025 |
| Form 2File: Form-2 Engineer Certificate 31032024.pdf | 8 Aug 2025 |
| Form 3File: Form-3 CA Certificate 31032024.pdf | 8 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory 31032024.pdf | 8 Aug 2025 |
| Form 1File: Form-1 Architect Certificate 31122023.pdf | 8 Aug 2025 |
| Form 2File: Form-2 Engineer Certificate 31122023.pdf | 8 Aug 2025 |
| Form 3File: Form-3 CA Certificate 31122023.pdf | 8 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory 31122023.pdf | 8 Aug 2025 |
| Form 1File: Form-1 Architect Certificate 30092023.pdf | 8 Aug 2025 |
| Form 2File: Form-2 Engineer Certificate 30092023.pdf | 8 Aug 2025 |
| Form 3File: Form-3 CA Certificate 30092023.pdf | 8 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory 30092023.pdf | 8 Aug 2025 |
| Form 1File: Form-1 Architect Certificate 30062023.pdf | 8 Aug 2025 |
| Form 2File: Form-2 Engineer Certificate 30062023.pdf | 8 Aug 2025 |
| Form 3File: Form-3 CA Certificate 30062023.pdf | 8 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory 30062023.pdf | 8 Aug 2025 |
| Form 1File: Form-1 Architect Certificate 31032023.pdf | 8 Aug 2025 |
| Form 2File: Form-2 Engineer Certificate 31032023.pdf | 8 Aug 2025 |
| Form 3File: Form-3 CA Certificate 31032023.pdf | 8 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory 31032023.pdf | 8 Aug 2025 |
| Form 1File: Form-1 Architect Certificate 31122022.pdf | 8 Aug 2025 |
| Form 2File: Form-2 Engineer Certificate 21102022.pdf | 8 Aug 2025 |
| Form 3File: Form-3 CA Certificate 22102022.pdf | 8 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory 31122022.pdf | 8 Aug 2025 |
| Building plan approvalFile: Sanctioned Plan 01-14 04022025.pdf | 12 Mar 2025 |
Promoter's earlier projects4
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| WESTONE | SR NO 36 1 36 2 PARKHE WASTI | 67 | - | Completed | Dec 2019 | Oct 2019 |
| WEST ONEP52100011779 | Wakad, Pune | - | Aug 2017 | Completed | Dec 2019 | Late, Aug 2021 |
| IMPERIAL TOWER | NIBM MOHAMADWADI | 143 | - | Completed | Jun 2018 | Jun 2018 |
| A G TRADE CENTER | IT PARK | 14 | - | Completed | Jan 2014 | Jan 2014 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 191 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep AG BUSINESS PARK on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Baner13,700+ in Pune
Filed coordinates, straight-line distance. 294 registered projects within 2 km.
VENKATESH LAUREL
SHREE VENKATESH BUILDCON PVT LTD
One Place - F C Road
PALASH REALTORS LLP
NIRMAN SHREYAS
PRIVEUS PROJECTS LLP
NEELRATNA
Kotibhaskar Infrastructures &Developers Pv
GBs Business Hub
Growstone Ventures LLP
SAI CHAMBERS
MILIND RAMKRISHNA UPASANI
Builder: A G Constructions
A G Constructions has 1 registration on MahaRERA, including AG BUSINESS PARK. Its filings disclose 4 earlier MahaRERA projects: declares 3 of 4 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if AG BUSINESS PARK is delayed beyond 31 Jan 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of AG BUSINESS PARK?
The registered promoter entity is A G Constructions, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in AG BUSINESS PARK?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for AG BUSINESS PARK?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at AG BUSINESS PARK?
The professionals named in the filing: Architect: projection studio; Engineer: Nitin Narayan Marne; Chartered Accountant: CA Priyesh Jain; Chartered Accountant: M/S bhutada mundada & co; Chartered Accountant: nilesh raut. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in AG BUSINESS PARK?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback