AG BUSINESS PARK

By A G Constructions

RG-MH-97167 · RERA P52100047954 · Last updated on MahaRERA portal: 30 May 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jan 2028Possession promisedmoved 24 months from the original
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 95%
15 of 15Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 191 documents Report an error

AG BUSINESS PARK is a Commercial project by A G Constructions in Pune, Maharashtra, registered with MahaRERA as P52100047954 on 2 Dec 2022. Possession is promised by 31 Jan 2028. The completion date has moved by 24 months from the original filing. 0 of the 15 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameAG BUSINESS PARK
  • TypeCommercial
  • Location
    • Baner
    • Haveli
    • Pune
    • 411005
  • Pincode411005
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100047954
  • ReraGenie IDRG-MH-97167

Builder

  • NameA G Constructions
  • Entity typePartnership
  • PartnerAbhijit Subhash Gaikwad
  • Declared earlier projects4 →

Key dates

this monthRegisteredDec 2022First promiseJan 2026Revised toJan 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on2 Dec 2022
  • Promised completion31 Jan 2028
  • Revised completionRevised to 31 Jan 2028 (originally 31 Jan 2026)
  • Buildings1 building record
  • Documents filed191 files

Current status

0%0 of 15 units booked
53.5%Work done, per cost certificate

Figures as on 30 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AG BUSINESS PARKNA211501515

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 95%.

AG BUSINESS PARK: 43% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.5%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 30 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed1678

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1,678
Closed/Covered1,678

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area6,080 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on4 May 2026

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI28058.9
Proposed, not sanctioned27,702 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAundh Pune
Estimated costRs 75.81 cr
Cost incurredRs 40.52 cr
Work done53.45%
BuildingWingEstimatedIncurred
AG BUSINESS PARKNARs 69.53 crRs 34.78 cr
-NARs 6.28 crRs 5.74 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
Architectprojection studio
EngineerNitin Narayan Marne
Chartered AccountantCA Priyesh Jain
Chartered AccountantM/S bhutada mundada & co
Chartered Accountantnilesh raut
PartnerRole in project
A G Constructions-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA07052620858Jan 2026 → Jan 2028

Reason as filed by the promoterThe project completion date is required to be extended from 31/01/2026 to 31/01/2028 due to subsequent revision and increase in the sanctioned scope of the project. The project was earlier sanctioned up to 8 floors vide sanction dated 13/10/2022. Thereafter, revised sanction up to the 14th floor was obtained on 04/02/2025. Due to the additional sanctioned floors and related balance construction, services, finishing, and completion formalities, further time is required to complete the project as per the latest sanctioned plan. It is further submitted that no units have been sold or booked in th

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Oct 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 May 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 May 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Jan 2028

Documents filed191

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 191 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Layout approvalFile: Sanction plan 1-15 01042026 Hi.pdf30 May 2026
Building plan approvalFile: Sanction plan 2-15 01042026.pdf30 May 2026
Building plan approvalFile: Sanction plan 3-15 01042026.pdf30 May 2026
Building plan approvalFile: Sanction plan 4-15 01042026.pdf30 May 2026
Building plan approvalFile: Sanction plan 5-15 01042026.pdf30 May 2026
Building plan approvalFile: Sanction plan 6-15 01042026.pdf30 May 2026
Building plan approvalFile: Sanction plan 7-15 01042026.pdf30 May 2026
Building plan approvalFile: Sanction plan 8-15 01042026.pdf30 May 2026
Building plan approvalFile: Sanction plan 9-15 01042026.pdf30 May 2026
Building plan approvalFile: Sanction plan 10-15 01042026.pdf30 May 2026
Building plan approvalFile: Sanction plan 11-15 01042026.pdf30 May 2026
Building plan approvalFile: Sanction plan 12-15 01042026.pdf30 May 2026
Building plan approvalFile: Sanction plan 13-15 01042026.pdf30 May 2026
Building plan approvalFile: Sanction plan 14-15 01042026.pdf30 May 2026
Building plan approvalFile: Sanction plan 15-15 01042026.pdf30 May 2026
Form 2A (FY 2024-2025)File: scan-sign-copy_Form-2A Engineer Certificate_31032025.pdf13 May 2026
Form 2A (FY 2025-2026)File: scan-sign-copy_Form-2A Engineer Certificate_31032026.pdf13 May 2026
Form 5 (FY 2024-2025)File: Form-5 RERA Audit Report FY 2024-25.pdf13 May 2026
Form 5 (FY 2025-2026)File: Form-5 RERA Audit Report FY 2025-26.pdf13 May 2026
Withdrawal Update Form 1File: Form-1 Architect Certificate 31122025.pdf7 May 2026
Withdrawal Update Form 2File: Form-2 Engineer Certificate 31122025.pdf7 May 2026
Withdrawal Update Form 3File: Form-3 CA Certificate 31122025 v5.pdf7 May 2026
Withdrawal Update Form 1File: Form-1 Architect Certificate 31122025.pdf6 May 2026
Withdrawal Update Form 2File: Form-2 Engineer Certificate 31122025.pdf6 May 2026
Withdrawal Update Form 3File: Form-3 CA Certificate 31122025 v5.pdf6 May 2026
Form 2A (FY 2022-2023)File: Form-2A Quality Assurance FY 2022-23.pdf6 May 2026
Form 2A (FY 2023-2024)File: Form-2A Quality Assurance FY 2023-24.pdf6 May 2026
Form 1File: Form-1 Architect Certificate 30092025.pdf21 Feb 2026
Form 2File: Form-2 Engineer Certificate 30092025.pdf21 Feb 2026
Form 3File: Form-3 CA Certificate 30092025.pdf21 Feb 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory-30092025.pdf21 Feb 2026
Form 1File: Form-1 Architect Certificate 31122025.pdf21 Feb 2026
Form 2File: Form-2 Engineer Certificate 31122025.pdf21 Feb 2026
Form 3File: Form-3 CA Certificate 31122025.pdf21 Feb 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory-31122025.pdf21 Feb 2026
Form 1File: Form-1 Architect Certificate 30062025.pdf8 Aug 2025
Form 2File: Form-2 Engineer Certificate 30062025.pdf8 Aug 2025
Form 3File: Form-3 CA Certificate 30062025 Sign.pdf8 Aug 2025
Disclosure of Sold and Booked InventoryFile: Inventory Certificate 30062025.pdf8 Aug 2025
Form 1File: Form-1 Architect Certificate 31032025.pdf8 Aug 2025
Form 2File: Form-2 Engineer Certificate 31032025.pdf8 Aug 2025
Form 3File: Form-3 CA Certificate 31032025 Sign.pdf8 Aug 2025
Disclosure of Sold and Booked InventoryFile: Inventory Certificate 31032025.pdf8 Aug 2025
Form 1File: Form-1 Architect Certificate 31122024.pdf8 Aug 2025
Form 2File: Form-2 Engineer Certificate 31122024.pdf8 Aug 2025
Form 3File: Form-3 CA Certificate 31122024.pdf8 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory 31122024.pdf8 Aug 2025
Form 1File: Form-1 Architect Certificate 30092024.pdf8 Aug 2025
Form 2File: Form-2 Engineer Certificate 30092024.pdf8 Aug 2025
Form 3File: Form-3 CA Certificate 30092024.pdf8 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory 30092024.pdf8 Aug 2025
Form 1File: Form-1 Architect Certificate 30062024.pdf8 Aug 2025
Form 2File: Form-2 Engineer Certificate 30062024.pdf8 Aug 2025
Form 3File: Form-3 CA Certificate 30062024.pdf8 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory 30062024.pdf8 Aug 2025
Form 1File: Form-1 Architect Certificate 31032024.pdf8 Aug 2025
Form 2File: Form-2 Engineer Certificate 31032024.pdf8 Aug 2025
Form 3File: Form-3 CA Certificate 31032024.pdf8 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory 31032024.pdf8 Aug 2025
Form 1File: Form-1 Architect Certificate 31122023.pdf8 Aug 2025
Form 2File: Form-2 Engineer Certificate 31122023.pdf8 Aug 2025
Form 3File: Form-3 CA Certificate 31122023.pdf8 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory 31122023.pdf8 Aug 2025
Form 1File: Form-1 Architect Certificate 30092023.pdf8 Aug 2025
Form 2File: Form-2 Engineer Certificate 30092023.pdf8 Aug 2025
Form 3File: Form-3 CA Certificate 30092023.pdf8 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory 30092023.pdf8 Aug 2025
Form 1File: Form-1 Architect Certificate 30062023.pdf8 Aug 2025
Form 2File: Form-2 Engineer Certificate 30062023.pdf8 Aug 2025
Form 3File: Form-3 CA Certificate 30062023.pdf8 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory 30062023.pdf8 Aug 2025
Form 1File: Form-1 Architect Certificate 31032023.pdf8 Aug 2025
Form 2File: Form-2 Engineer Certificate 31032023.pdf8 Aug 2025
Form 3File: Form-3 CA Certificate 31032023.pdf8 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory 31032023.pdf8 Aug 2025
Form 1File: Form-1 Architect Certificate 31122022.pdf8 Aug 2025
Form 2File: Form-2 Engineer Certificate 21102022.pdf8 Aug 2025
Form 3File: Form-3 CA Certificate 22102022.pdf8 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory 31122022.pdf8 Aug 2025
Building plan approvalFile: Sanctioned Plan 01-14 04022025.pdf12 Mar 2025

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise1 delivered late
ProjectLocationFlatsRegisteredStatusPromisedDelivered
WESTONESR NO 36 1 36 2 PARKHE WASTI67-CompletedDec 2019Oct 2019
WEST ONEP52100011779Wakad, Pune-Aug 2017CompletedDec 2019Late, Aug 2021
IMPERIAL TOWERNIBM MOHAMADWADI143-CompletedJun 2018Jun 2018
A G TRADE CENTERIT PARK14-CompletedJan 2014Jan 2014

How this compares with Pune

0%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 24 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AG BUSINESS PARK on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Baner13,700+ in Pune

2 kmAG BUSINESS PARKCompleted 113Lapsed / revoked 41Other 140Dot size: filed unitsN

Filed coordinates, straight-line distance. 294 registered projects within 2 km.

Builder: A G Constructions

A G Constructions has 1 registration on MahaRERA, including AG BUSINESS PARK. Its filings disclose 4 earlier MahaRERA projects: declares 3 of 4 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if AG BUSINESS PARK is delayed beyond 31 Jan 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AG BUSINESS PARK?

The registered promoter entity is A G Constructions, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AG BUSINESS PARK?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AG BUSINESS PARK?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AG BUSINESS PARK?

The professionals named in the filing: Architect: projection studio; Engineer: Nitin Narayan Marne; Chartered Accountant: CA Priyesh Jain; Chartered Accountant: M/S bhutada mundada & co; Chartered Accountant: nilesh raut. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AG BUSINESS PARK?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AG BUSINESS PARK. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AG BUSINESS PARK to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.