Home / Browse projects / Satara, Maharashtra / ADITI AARAMBH

Completed No litigation declared Residential / Group Housing project

ADITI AARAMBH

By Vijay Rajaram Pawar

RG-MH-72092 · RERA P52700046263 · Last updated on MahaRERA portal: 27 Oct 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 7 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Satara registration emailed to you, free during the pilot beta.
Jul 2025Possession promisedregistration recorded completed
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 66%
61 of 61Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 31 documents Report an error

ADITI AARAMBH is a Residential / Group Housing project by Vijay Rajaram Pawar in Satara, Maharashtra, registered with MahaRERA as P52700046263 on 20 Jun 2022. The registration is recorded completed; possession was promised by 1 Jul 2025. The completion date has moved by 7 months from the original filing. 0 of the 61 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameADITI AARAMBH
  • TypeResidential / Group Housing
  • Location
    • NA
    • Patan (CT)
    • Patan
    • Satara
    • 415206
  • Pincode415206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52700046263
  • ReraGenie IDRG-MH-72092

Builder

  • NameVijay Rajaram Pawar
  • Entity typeIndividual
  • Declared earlier projects1 →

Key dates

this monthRegisteredJun 2022First promiseDec 2024Revised toJul 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on20 Jun 2022
  • Promised completion1 Jul 2025
  • Revised completionRevised to 1 Jul 2025 (originally 31 Dec 2024)
  • Buildings1 building record
  • Documents filed31 files

Current status

0%0 of 61 units booked
44.8%Work done, per cost certificate

Figures as on 27 Oct 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ADITI AARAMBHNA66481361

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 27 Oct 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 66%.

ADITI AARAMBH: 33% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure66%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 27 Oct 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,738 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on27 Oct 2025

Approvals and building plan

Sanctioning authorityTAHSIL OFFICE PATAN
Permissible FSI2500.0
Proposed, not sanctioned2,500 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPATAN
Estimated costRs 5.97 cr
Cost incurredRs 2.67 cr
Work done44.77%
BuildingWingEstimatedIncurred
ADITI AARAMBHNARs 5.17 crRs 2.59 cr
-NARs 80.00 lakhRs 8.00 lakh

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMRS LASHMI MANTHAN SHEWALE SHEWALE
EngineerER VAIBHAV LAXMAN KHORATE KHORATE
Chartered AccountantSAMEER PATIL
PartnerRole in project
Vijay Rajaram Pawar-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52700027713Dec 2024 → Jul 2025

Reason as filed by the promoterPOST FACTO

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Jun 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Jun 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Sep 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed31

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1ADITI AARAMBH.pdf27 Oct 2025
Withdrawal Update Form 2File: FORM 2 ADITI AARAMBH.pdf27 Oct 2025
Withdrawal Update Form 3File: FORM 3 ADITI AARAMBH.pdf27 Oct 2025
Occupational CertificateFile: OC - ADITI AARAMBH.pdf27 Oct 2025
Building plan approvalFile: Rewised Aaditi Aarambh Plan-compressed_11zon.pdf26 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: Rewised Aaditi Aarambh Plan-compressed_11zon.pdf26 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf26 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf26 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf26 Sep 2023
Commencement Certificates / NA Order for plotted developmentFile: CC_compressed.pdf20 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf14 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf14 Feb 2023
Disclosure of sold/ booked inventoryFile: SOLD-UNSOLD.pdf14 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf14 Feb 2023
Layout approvalFile: Sanctioned Plan_compressed.pdf14 Jun 2022
Building plan approvalFile: Sanctioned Plan_compressed.pdf14 Jun 2022
PAN CardFile: Pan Card Vijay.pdf14 Jun 2022
Copy of the legal title reportFile: Leagal Report_compressed.pdf14 Jun 2022
Details of encumbrancesFile: NON ENCUMBRANCES.pdf14 Jun 2022
Copy of Layout Approval (in case of layout)File: Sanctioned Plan_compressed.pdf14 Jun 2022
Building Plan Approval / NA Order for plotted developmentFile: Sanctioned Plan_compressed.pdf14 Jun 2022
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf14 Jun 2022
Commencement Certificates / NA Order for plotted developmentFile: CC 2_compressed.pdf14 Jun 2022
Declaration about Commencement CertificateFile: Declaration Form.pdf14 Jun 2022
Declaration in FORM BFile: FORM B.pdf14 Jun 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf14 Jun 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_compressed (1).pdf14 Jun 2022
CERSAI detailsFile: CERSAI.pdf14 Jun 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_compressed.pdf14 Jun 2022
Proforma of Allotment letterFile: ALLTMENT_compressed (1) 2.pdf14 Jun 2022
Proforma of Allotment letterFile: AGREEMENT FOR SALE.pdf14 Jun 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Aditi HeightsPatan Tal Patan Dist Satara Pin 41520620CompletedJan 2012Late, Dec 2012

How this compares with Satara

0%of this project is bookeddistrict median 15%
16%of Satara projects moved their completion datethis one moved by 7 months
35%of Satara registrations have lapsed or been cancelledthis one is completed

Computed across the 1,100+ Satara projects on ReraGenie, from their own filings.

Keep ADITI AARAMBH on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NA1,100+ in Satara

Builder: Vijay Rajaram Pawar

Vijay Rajaram Pawar has 1 registration on MahaRERA, including ADITI AARAMBH. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Satara district page.

Frequently asked questions

What are my rights if ADITI AARAMBH is delayed beyond 1 Jul 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ADITI AARAMBH?

The registered promoter entity is Vijay Rajaram Pawar, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ADITI AARAMBH?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ADITI AARAMBH?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ADITI AARAMBH?

The professionals named in the filing: Architect: MRS LASHMI MANTHAN SHEWALE SHEWALE; Engineer: ER VAIBHAV LAXMAN KHORATE KHORATE; Chartered Accountant: SAMEER PATIL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ADITI AARAMBH?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ADITI AARAMBH. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ADITI AARAMBH to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.