ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / ADI PRIME

Registration lapsed No litigation declared Commercial project

ADI PRIME

By ADI ESTATES

RG-MH-12894 · RERA P52100021659 · Last updated on MahaRERA portal: 29 May 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • Completion date moved by 24 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
4 of 11Construction stages donefurthest along: Staircases, 85%
0Complaints at MahaRERAon this registration
Jump to the 120 documents Report an error

ADI PRIME is a Commercial project by ADI ESTATES in Pune, Maharashtra, registered with MahaRERA as P52100021659 on 19 Jul 2019. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 24 months from the original filing.

At a glance

Project

  • NameADI PRIME
  • TypeCommercial
  • Location
    • MOSHI CHIKHALI ROAD
    • NEXT TO SWARAJ
    • Borhadewadi
    • Haveli
    • Pune
    • 412105
  • Pincode412105
  • RERA no.P52100021659
  • ReraGenie IDRG-MH-12894

Builder

  • NameADI ESTATES
  • Entity typePartnership
  • GSTIN27ABLFA8068J1ZW
  • PartnersSURESH DEV PURI, ASHOK NENARAM CHOUDHARI

Key dates

10 months past promisethis monthRegisteredJul 2019First promiseDec 2023Revised toDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on19 Jul 2019
  • Promised completion31 Dec 2025
  • Revised completionRevised to 31 Dec 2025 (originally 30 Dec 2023)
  • Buildings1 building record
  • Documents filed120 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ADI PRIMENA100000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 85%.

ADI PRIME: 70% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)80%
Podiums (if any)0%
Plinth80%
Stilt Floor80%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%

Progress on shared amenities15

As on 29 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed72

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots72
Closed/Covered72

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,359 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI5070.81
Proposed, not sanctioned2,352 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAgarwal bldg 127 telco road, chichwad, Pune-411019

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
ADI ESTATES-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100018102Dec 2023 → Dec 2024

Reason as filed by the promoterSome of labours working on the site of the Applicant who had gone back to native during the festivals. Ganesh Festival , Navratri and Diwali back to back festivals had made labour supply shortage That slowed down construction activity on the site. Without labour work has been stoped .Shortage of certain material in the markets due to the supply chain disruptions and scarcity of materials like metals and semi-conductors.License for installation and working of lift is awaited. causing delayed in the lift installation.

EXT52100027612Dec 2023 → Dec 2025

Reason as filed by the promoterSub: Extension to the project: ADI PRIME, bearing Registration No. P52100021659. We, hereby apply for extension u/s 7(3) of the registered project bearing vide no. P52100021659 up to 31/12/2025.

Litigation declared3

CaseCourtStatus
special civil suit 682/2016Shri V R JagdaleWS and say
215/2018/2018CIVIL COURT JUNIOR DIVISIONFor filling of reply and hearing on rejection of plaint application
283/2017/2017SDO HAVELIORDER PASSED

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Jun 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 May 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 May 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 May 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed120

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 120 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Layout approvalFile: Layout Approval_compressed.pdf29 May 2025
Building plan approvalFile: Building Plan 1_compressed.pdf29 May 2025
Building plan approvalFile: Building Plan 2_compressed.pdf29 May 2025
Building plan approvalFile: Building Plan 3_compressed.pdf29 May 2025
Building plan approvalFile: Building Plan 4_compressed.pdf29 May 2025
Building plan approvalFile: Building Plan 5_compressed.pdf29 May 2025
Building plan approvalFile: Building Plan 6_compressed.pdf29 May 2025
Building plan approvalFile: Building Plan 7_compressed.pdf29 May 2025
Copy of Layout Approval (in case of layout)File: Layout Approval_compressed.pdf29 May 2025
Declaration in FORM BFile: Form B -Declaration by promoter.pdf29 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arch Certificate.pdf29 May 2025
Certificates of CA (Form 3)File: Form 3 CA Certificate - March 2024_11zon.pdf29 May 2025
Certificates of CA (Form 3)File: Form 3 CA Certificate - March 2025_11zon.pdf29 May 2025
Certificates of CA (Form 3)File: Form 3 CA Certificate - Dec 2024_11zon.pdf29 May 2025
Certificates of CA (Form 3)File: Form 3 CA Certificate - Sept 2024_11zon.pdf29 May 2025
Certificates of CA (Form 3)File: Form 3 CA Certificate - June 2024_11zon (1).pdf29 May 2025
Certificates of CA (Form 3)File: Form 3 CA Certificate - Dec 2023_compressed.pdf29 May 2025
Certificates of CA (Form 3)File: Form 3 CA Certificate - Sept 2023_compressed.pdf29 May 2025
Certificates of CA (Form 3)File: Form 3 CA Certificate - June 2023_compressed.pdf29 May 2025
Certificates of CA (Form 3)File: Form 3 CA Certificate - March 2023_compressed.pdf29 May 2025
Certificates of CA (Form 3)File: Form 3 CA Certificate - Dec 2022_compressed.pdf29 May 2025
Certificates of CA (Form 3)File: Form 3 CA Certificate - Sept 2022_compressed.pdf29 May 2025
Certificates of CA (Form 3)File: Form 3 CA Certificate - June 2022_compressed.pdf29 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Eng Certificate - Sept 2024_11zon.pdf29 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate - March 2025_11zon.pdf29 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Eng Certificate - Dec 2024_11zon.pdf29 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Eng Certificate - June 2024_11zon.pdf29 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Eng Certificate - March 2024_compressed.pdf29 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Eng Certificate - Dec 2023_compressed.pdf29 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Eng Certificate - June 2023_compressed.pdf29 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Eng Certificate - March 2023_compressed.pdf29 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Eng Certificate - Dec 2022_compressed.pdf29 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Eng Certificate - Sept 2022_compressed.pdf29 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Eng Certificate - June 2022_compressed.pdf29 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Eng Certificate - Sept 2023_compressed.pdf29 May 2025
Commencement Certificates / NA Order for plotted developmentFile: CC_compressed.pdf29 May 2025
Building Plan Approval (IOD)File: Building Plan 4_compressed.pdf29 May 2025
Building Plan Approval (IOD)File: Building Plan 7_compressed.pdf29 May 2025
Building Plan Approval (IOD)File: Building Plan 6_compressed.pdf29 May 2025
Building Plan Approval (IOD)File: Building Plan 5_compressed.pdf29 May 2025
Building Plan Approval (IOD)File: Building Plan 3_compressed.pdf29 May 2025
Building Plan Approval (IOD)File: Building Plan 2_compressed.pdf29 May 2025
Building Plan Approval (IOD)File: Building Plan 1_compressed.pdf29 May 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - June 2022.pdf29 May 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - March 2025.pdf29 May 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - Dec 2024.pdf29 May 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - Sept 2024.pdf29 May 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - June 2024.pdf29 May 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - March 2024_compressed.pdf29 May 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - Dec 2023.pdf29 May 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - Sept 2023.pdf29 May 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - June 2023.pdf29 May 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - March 2023.pdf29 May 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - Dec 2022.pdf29 May 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - Sept 2022.pdf29 May 2025
Declaration about Commencement CertificateFile: CC Declaration.pdf29 May 2025
Other - TechnicalFile: Plinth Certificate.pdf29 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A-2023-24 ADI ESTATE.pdf18 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 LAtest Form 2023-24 signed.pdf18 Feb 2025
Declaration in FORM BFile: Form B -29-12-2024_compressed.pdf1 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A-2022-23 ADI ESTATE (1).pdf29 Dec 2023
Disclosure of sold/ booked inventoryFile: Rera Sold Enventory.pdf29 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 ADI ESTATE (1).pdf29 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A-2022-23 ADI ESTATE.pdf21 Dec 2023
Certificates of CA (Form 3)File: Fomr 3 March 2023-compressed.pdf21 Dec 2023
Certificates of CA (Form 3)File: Fomr 3 Nov 2023-compressed.pdf21 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 ADI ESTATE.pdf21 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form - 2 A 21-22.pdf27 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A -22-23.pdf27 Apr 2023
Certificates of CA (Form 3)File: ADI ESTATES CA CERTIFICATE March 20.pdf27 Apr 2023
Certificates of CA (Form 3)File: ADI ESTATES CA CERTIFICATE March 21.pdf27 Apr 2023
Certificates of CA (Form 3)File: ADI ESTATES CA CERTIFICATE March 22.pdf27 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5.pdf26 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 2021.pdf26 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 2022.pdf26 Apr 2023
Building plan approvalFile: 4.pdf31 Aug 2021
Building plan approvalFile: 5.pdf31 Aug 2021
Building plan approvalFile: 6.pdf31 Aug 2021
Building plan approvalFile: 7.pdf31 Aug 2021
Building plan approvalFile: 8.pdf31 Aug 2021

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 24 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ADI PRIME on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEXT TO SWARAJ13,700+ in Pune

Builder: ADI ESTATES

ADI ESTATES has 1 registration on MahaRERA, including ADI PRIME. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that ADI PRIME shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if ADI PRIME is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ADI PRIME?

The registered promoter entity is ADI ESTATES, a partnership as per the filing. Its GSTIN 27ABLFA8068J1ZW can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ADI PRIME?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ADI PRIME?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in ADI PRIME?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ADI PRIME. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ADI PRIME to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.