Home / Browse projects / Pune, Maharashtra / ABHANG RECIDENCY

Registered No litigation declared Residential / Group Housing project

ABHANG RECIDENCY

By SAI DEVELOPERS

RG-MH-16698 · RERA P52100027212 · Last updated on MahaRERA portal: 27 Apr 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 36 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedmoved 36 months from the original
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 93%
18 of 20Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 146 documents Report an error

ABHANG RECIDENCY is a Residential / Group Housing project by SAI DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100027212 on 24 Nov 2020. Possession is promised by 30 Jun 2027. The completion date has moved by 36 months from the original filing. 2 of the 20 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameABHANG RECIDENCY
  • TypeResidential / Group Housing
  • Location
    • CTS 41
    • 43
    • 44 DEHU
    • DEHU
    • Haveli
    • Pune
    • 411031
  • Pincode411031
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100027212
  • ReraGenie IDRG-MH-16698

Builder

  • NameSAI DEVELOPERS
  • Entity typeOthers
  • Named personVISHWANATH VASANT JARE
  • Other registrations34 more →
  • Completed19 of 35
  • No longer live9 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

this monthRegisteredNov 2020First promiseJun 2024Revised toJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on24 Nov 2020
  • Promised completion30 Jun 2027
  • Revised completionRevised to 30 Jun 2027 (originally 30 Jun 2024)
  • Buildings1 building record
  • Documents filed146 files

Current status

10%2 of 20 units booked
96.8%Work done, per cost certificate

Figures as on 27 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ABHANG RECIDENCYNA4020020

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 27 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 93%.

ABHANG RECIDENCY: 52% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure93%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises84%
Sanitary Fittings within the flats / premises28%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.20%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 27 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes70%
Water SupplyNoNot applicable
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes45%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed101

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots101
Closed/Covered32
Open Space69

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area336 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on30 Apr 2026
LandownerVillageDistrict
SHANTABAI BHAU CHAVANPune (M Corp.)Pune

Approvals and building plan

Sanctioning authoritypcmc
Permissible FSI479.47
Proposed, not sanctioned479 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchTHERMAX CHOWK PCMC PUNE
Estimated costRs 1.07 cr
Cost incurredRs 1.03 cr
Work done96.77%
BuildingWingEstimatedIncurred
ABHANG RECIDENCYNARs 97.81 lakhRs 94.36 lakh
-NARs 9.11 lakhRs 9.11 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAJIT THAKUR
EngineerATUL BHARAT SURYAWANSHI
EngineerJAY GANESH ASSOCIATES
Chartered Accountantprashantsing MOHANSING PARDESHI
Chartered AccountantKaustubh Gore
PartnerRole in project
SAI DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100024452Jun 2024 → Jun 2027

Reason as filed by the promoterThe current completion date for our project is 30th June 2024. However, due to unforeseen circumstances and challenges, including road issue from other developers we are unable to complete the project within the stipulated time frame. Now all the issues are resolved. In light of these challenges, we respectfully request an extension of the project completion date to 30th June 2027. This extension will allow us to ensure the highest standards of construction and deliver the project to our esteemed customers as per the promised quality.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Oct 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Aug 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Oct 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Aug 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed146

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 146 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form1.pdf27 Apr 2026
Form 2File: Form 2.pdf27 Apr 2026
Form 3File: Form3-.pdf27 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold sign.pdf27 Apr 2026
Form 2A (FY 2024-2025)File: Form2A Engineers Certificate Signed.pdf17 Feb 2026
Form 5 (FY 2024-2025)File: form 5 sai developer signed.pdf5 Feb 2026
Form 1File: Form 1 q3.pdf21 Jan 2026
Form 2File: signed form 2.pdf21 Jan 2026
Form 3File: form 3.pdf21 Jan 2026
Disclosure of Sold and Booked InventoryFile: 3Q 25-26 SOLD UNSOLD Abhang Residency Sai Developers.pdf21 Jan 2026
Form 2File: From-2 Sai Developers Abhang Residecy Qtr-2.pdf28 Nov 2025
Disclosure of Sold and Booked InventoryFile: Discolsure of Sold Abhang Residency.pdf28 Nov 2025
Form 1File: Form 1 Qtr-2 Architect's Certificate Sai Developers_page-0001.pdf28 Nov 2025
Form 3File: from 3.pdf28 Nov 2025
Form 1File: Form-1 Archiitect's Certificate 1st Qtr 25-26.pdf14 Aug 2025
Form 2File: Form-2 Engineer's Certificate 1st Qtr 25-26.pdf14 Aug 2025
Form 3File: Abhang Residency sign.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Abhang Residency 1st 25-26.pdf14 Aug 2025
Form 1File: form 1.pdf23 May 2025
Form 2File: Form 2 signed.pdf23 May 2025
Form 3File: form 3 signed.pdf23 May 2025
Disclosure of Sold and Booked InventoryFile: disclosure of sold unsold.pdf23 May 2025
Form 1File: form 1 April 24 to June 24.pdf17 May 2025
Form 2File: form 2 april 24 to june 24_0001.pdf17 May 2025
Form 3File: april to june 24.pdf17 May 2025
Disclosure of Sold and Booked InventoryFile: disclosure of sold unsold inventory.pdf17 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q2 Form 1 Arc Ajit Thakur.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q3 Form 1 Arc Ajit Thakur.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 for 01072024 to30092024.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 for 01102024TO31122024.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From-2 010724TO300924.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From-2 EC 011024311224.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD Abhang Resi20.pdf20 Jan 2025
Layout approvalFile: Sanction Plan Abhang Residency, Dehu_compressed.pdf13 Aug 2024
Copy of Layout Approval (in case of layout)File: Sanction Plan Abhang Residency, Dehu_compressed.pdf13 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: april 23 to june 23.pdf13 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: july to sep 23.pdf13 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: oct to dec 23.pdf13 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 jan 24 to march 24.pdf13 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 April 24 to June 24.pdf13 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A 2023-24.pdf13 Aug 2024
Disclosure of sold/ booked inventoryFile: disclosure of sold unsold inventory.pdf13 Aug 2024
Disclosure of sold/ booked inventoryFile: declaration sold unsold inventory.pdf13 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: nov 20 to dec 20.pdf13 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: jan to march 21.pdf13 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: april 21 to june 21 form 3.pdf13 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: july to sep 21.pdf13 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: oct 21 to dec 21.pdf13 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: jan 22 to march 22.pdf13 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: april 22 to june 22.pdf13 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: july to sep 22.pdf13 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: oct to dec 22.pdf13 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: jan to march 23.pdf13 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: april to june 23.pdf13 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: july to sep 23.pdf13 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: oct to dec 23.pdf13 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: jan to march 24.pdf13 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: april to june 24.pdf13 Aug 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 21-22_merged FINAL.pdf13 Aug 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: fy 2022 23 final.pdf13 Aug 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: fy 23 24 final.pdf13 Aug 2024
Declaration in FORM BFile: form b_0001.pdf12 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: NOV TO DEC 20.pdf12 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: JAN 21 TO MARCH 21.pdf12 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: APRIL 21 TO JUNE 21.pdf12 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: JULY 21 TO SEP 21.pdf12 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: OCT 21 TO DEC 21.pdf12 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: JAN 22 MARCH 22.pdf12 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: APRIL 22 TO JUNE 22.pdf12 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: JULY TO SEP 22.pdf12 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: OCT 22 TO DEC 22.pdf12 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: JAN TO MARCH 23.pdf12 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 01 FROM-2 Nov 20-Dec 20 ENGINEERS CERTIFICATE.pdf12 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 02 FROM-2 jan 21-march 21 ENGINEERS CERTIFICATE.pdf12 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 03 FROM-2 April 21-June 21 ENGINEERS CERTIFICATE.pdf12 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 04 FROM-2 July-Sep 21 ENGINEERS CERTIFICATE.pdf12 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 05 FROM-2 Oct 21-Dec 21 ENGINEERS CERTIFICATE.pdf12 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 06 FROM-2 Jan 22-March ENGINEERS CERTIFICATE.pdf12 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 07 FROM-2 April 22- June 22 ENGINEER CERTIFICATE_0001.pdf12 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 08 FROM-2 July 22-Sep 22 ENGINEERS CERTIFICATE.pdf12 Aug 2024

How this compares with Pune

10%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 36 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ABHANG RECIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DEHU13,700+ in Pune

2 kmABHANG RECIDENCYCompleted 13Lapsed / revoked 9Other 17Dot size: filed unitsN

Filed coordinates, straight-line distance. 39 registered projects within 2 km.

Builder: SAI DEVELOPERS

SAI DEVELOPERS has 35 registrations on MahaRERA, including SAI SHOPPING COMPLEX and SAI DEVELOPERS. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if ABHANG RECIDENCY is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ABHANG RECIDENCY?

The registered promoter entity is SAI DEVELOPERS, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ABHANG RECIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ABHANG RECIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ABHANG RECIDENCY?

The professionals named in the filing: Architect: AJIT THAKUR; Engineer: ATUL BHARAT SURYAWANSHI; Engineer: JAY GANESH ASSOCIATES; Chartered Accountant: prashantsing MOHANSING PARDESHI; Chartered Accountant: Kaustubh Gore. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ABHANG RECIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ABHANG RECIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ABHANG RECIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.