Home / Browse projects / Nashik, Maharashtra / ABH UDYOG BHAVAN

Registration lapsed No litigation declared Commercial project

ABH UDYOG BHAVAN

By TANU REALITY LLP

RG-MH-39858 · RERA P51600051774 · Last updated on MahaRERA portal: 6 Nov 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
36 of 44Construction stages doneacross 4 buildings; furthest along: Basement (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 87 documents Report an error

ABH UDYOG BHAVAN is a Commercial project by TANU REALITY LLP in Nashik, Maharashtra, registered with MahaRERA as P51600051774 on 27 Jun 2023. Possession was promised by 30 Dec 2025 and is now 10 months past that date. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • NameABH UDYOG BHAVAN
  • TypeCommercial
  • Location
    • Aurangabad Road
    • Nandur Naka
    • Nashik (M Corp.)
    • Nashik
    • 422006
  • Pincode422006
  • RERA no.P51600051774
  • ReraGenie IDRG-MH-39858

Builder

  • NameTANU REALITY LLP
  • Entity typePartnership
  • PartnersNISHIT VIJAYGOPAL ATAL, REETESH DHARAMPAL HANSWANI, PRASHANT MOHANLAL BAGMAR, PRASHANT MOHANLAL BAGMAR, REETESH DHARAMPAL HANSWANI, NISHIT VIJAYGOPAL ATAL
  • Other registrations6 more →
  • Completed6 of 7
  • No longer live1 lapsed, de-registered or revoked

Key dates

10 months past promisethis monthRegisteredJun 2023First promiseDec 2024Revised toDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on27 Jun 2023
  • Promised completion30 Dec 2025
  • Revised completionRevised to 30 Dec 2025 (originally 31 Dec 2024)
  • Buildings4 building records
  • Documents filed87 files

Current status

61.9%Work done, per cost certificate

Figures as on 6 Nov 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building No 1NA10000
Building No 2NA10000
Building No 3NA10000
Building No 4NA10000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 6 Nov 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

36 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Basement (if any), at 0%.

Building No 182%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building No 282%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building No 382%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building No 482%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 6 Nov 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed153

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots153
Open Space153
BuildingOpen SpaceTotal
Building No 13838
Building No 23838
Building No 33838
Building No 43939

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,245 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI3938.28
Proposed, not sanctioned3,938 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNASHIK
Estimated costRs 8.82 cr
Cost incurredRs 5.46 cr
Work done61.89%
BuildingWingEstimatedIncurred
Building No 2NARs 2.09 crRs 1.30 cr
Building No 3NARs 2.09 crRs 1.28 cr
Building No 4NARs 2.09 crRs 1.28 cr
Building No 1NARs 1.90 crRs 1.27 cr
-NARs 65.16 lakhRs 32.78 lakh

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr Pankaj Jadhav
EngineerAMIT ATAL
Chartered AccountantCA KRISHNA JAJOO
PartnerRole in project
TANU REALITY LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51600025505Dec 2024 → Dec 2025

Reason as filed by the promoterWe writing to inform you about several challenges that have impacted the timeline of the ongoing construction project. Despite our best efforts to mitigate these issues, we have encountered several obstacles that have caused delays. One of the major challenges we've faced has been disruptions to the supply chain, which have hindered the timely procurement of crucial materials. Key items, such as steel and concrete, experienced delays due to shortages, transportation bottlenecks, and logistical issues. These delays resulted in extended lead times and, in some instances, forced us to consider ma

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Jun 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Mar 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Mar 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed87

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form-1 Udyog Bhavan.pdf6 Nov 2025
Form 2File: Form-2 Udyog Bhawan.pdf6 Nov 2025
Form 3File: Form-3 Udyog Bhawan.pdf6 Nov 2025
Disclosure of Sold and Booked InventoryFile: Inventory summary-UB.pdf6 Nov 2025
Form 1File: Form-1 Udyog Bhavan.pdf6 Nov 2025
Form 2File: Form-2 Udyog Bhawan.pdf6 Nov 2025
Form 3File: Form-3 Udyog Bhawan.pdf6 Nov 2025
Disclosure of Sold and Booked InventoryFile: Inventory summary-UB.pdf6 Nov 2025
Form 1File: Form-1 Udyog Bhavan.pdf6 Nov 2025
Form 2File: Form-2 Udyog Bhawan.pdf6 Nov 2025
Form 3File: Form-3 Udyog Bhawan.pdf6 Nov 2025
Disclosure of Sold and Booked InventoryFile: Inventory summary-UB.pdf6 Nov 2025
Form 1File: Form-1 Udyog Bhavan.pdf6 Nov 2025
Form 2File: Form-2 Udyog Bhawan.pdf6 Nov 2025
Form 3File: Form-3 Udyog Bhawan.pdf6 Nov 2025
Disclosure of Sold and Booked InventoryFile: Inventory summary-UB.pdf6 Nov 2025
Form 1File: Form-1 Udyog Bhavan.pdf6 Nov 2025
Form 1File: Form-1 Udyog Bhavan.pdf6 Nov 2025
Form 2File: Form-2 Udyog Bhawan.pdf6 Nov 2025
Form 3File: Form-3 Udyog Bhawan.pdf6 Nov 2025
Disclosure of Sold and Booked InventoryFile: Inventory summary-UB.pdf6 Nov 2025
Withdrawal Update Form 1File: Form-1--UB.pdf22 Aug 2025
Withdrawal Update Form 1File: Form-1--UB.pdf22 Aug 2025
Withdrawal Update Form 2File: Form-2 UB.pdf22 Aug 2025
Withdrawal Update Form 2File: Form-2 UB.pdf22 Aug 2025
Withdrawal Update Form 3File: Form-3 UB.pdf22 Aug 2025
Withdrawal Update Form 3File: Form-3 UB.pdf22 Aug 2025
Form 1File: Form-1 U B.pdf17 Jun 2025
Form 2File: Form-2 U B.pdf17 Jun 2025
Form 3File: Udyog Bhavan Form-3.pdf17 Jun 2025
Disclosure of Sold and Booked InventoryFile: Inventory Summary-U B.pdf17 Jun 2025
Form 2A (FY 2024-2025)File: Form-2A UB.pdf17 Jun 2025
Declaration in FORM BFile: Form B Udyog Bhavan.pdf12 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: UB Form-3.pdf19 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: UB Form-1.pdf18 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: UB Form-2.pdf18 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure of inventory UB.pdf18 Feb 2025
Declaration in FORM BFile: Form-B Udyog bhavan-New.pdf30 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 UB.pdf30 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2A UB.pdf30 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form-5 U B.pdf30 Dec 2024
Disclosure of sold/ booked inventoryFile: Inventory Sammary ABH UB1.pdf12 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 UB.pdf4 Dec 2024
Disclosure of sold/ booked inventoryFile: Inventory Sammary ABH U B.pdf4 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2Udyog Bhawan.pdf16 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2Udyog Bhawan.pdf16 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 UB.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Udyog Bhavan.pdf16 Oct 2024
Disclosure of sold/ booked inventoryFile: Udyog Bhawan Inventory.pdf11 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ABH UB Form-2.pdf1 Aug 2024
Disclosure of sold/ booked inventoryFile: ABH UB Inventory Summary.pdf30 Jul 2024
Disclosure of sold/ booked inventoryFile: UDB Inventory.pdf2 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 UB.pdf2 Jul 2024
Details of encumbrances concerned to FinanceFile: Details of Encumbrances-Finance.pdf21 Jun 2024
Details of encumbrances concerned to LegalFile: Details of Encumbrances-Finance.pdf21 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: U B-Form-1 Architect certificate.pdf21 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 _rotated.pdf24 Apr 2024
Disclosure of sold/ booked inventoryFile: ABH U B -2 Sold unsold summery.pdf13 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 Udyog bhawan Tanu reality.pdf10 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Udyog Bhavan.pdf3 Nov 2023
Copy of the legal title reportFile: Title-78.pdf19 Jun 2023
Declaration about Commencement CertificateFile: 20230619154117.pdf19 Jun 2023
Details of encumbrances concerned to FinanceFile: Encumbrance_ABH UB.pdf15 Jun 2023
Details of encumbrances concerned to LegalFile: Encumbrance_ABH UB.pdf15 Jun 2023
CERSAI detailsFile: No CERSAI Report_ABH UB.pdf15 Jun 2023
Other - LegalFile: SALEDEED_1.pdf25 May 2023
Other - LegalFile: SALEDEED_2.pdf25 May 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Seperate Bank Account_ABH UB_Revised.pdf23 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure_Ritesh Hanswani.pdf9 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_ABH UB_uploaded.pdf8 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_ABH UB_uploaded.pdf8 May 2023
Declaration in FORM BFile: RERA Form B_ABH UB.pdf12 Apr 2023
Details of encumbrances concerned to FinanceFile: Non-encumbrance_ABH UB_Revised.pdf8 Apr 2023
Details of encumbrances concerned to LegalFile: Non-encumbrance_ABH UB_Revised.pdf8 Apr 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate with undertaking and Index II_Uploaded.pdf8 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_ABH UB_uploaded.pdf8 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure_Nishit Atal.pdf8 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure_Prashant Bagmar.pdf8 Apr 2023
Proforma of Agreement for saleFile: Model_AFS_in_English.pdf8 Apr 2023
Deviation Report with respect to Allotment letterFile: Deviation Report_Allotment Letter_ABH UB.pdf8 Apr 2023

How this compares with Nashik

10%of Nashik projects moved their completion datethis one moved by 12 months
19%of Nashik registrations have lapsed or been cancelledthis one is among them

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ABH UDYOG BHAVAN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Nandur Naka4,100+ in Nashik

Builder: TANU REALITY LLP

TANU REALITY LLP has 7 registrations on MahaRERA, including TOWN SQUARE and ABH SAMRUDDHI. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What does it mean that ABH UDYOG BHAVAN shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if ABH UDYOG BHAVAN is delayed beyond 30 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ABH UDYOG BHAVAN?

The registered promoter entity is TANU REALITY LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ABH UDYOG BHAVAN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ABH UDYOG BHAVAN?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ABH UDYOG BHAVAN?

The professionals named in the filing: Architect: Ar Pankaj Jadhav; Engineer: AMIT ATAL; Chartered Accountant: CA KRISHNA JAJOO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ABH UDYOG BHAVAN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ABH UDYOG BHAVAN. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ABH UDYOG BHAVAN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.