ReraGenieLog inGet a buyer report

Home / Browse projects / Solapur, Maharashtra / Aastha Residency

Registered No litigation declared Residential / Group Housing project

Aastha Residency

By Nitin Hukumchand Rathod

RG-MH-17101 · RERA P52600028323 · Last updated on MahaRERA portal: 15 Apr 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 18 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Solapur registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 18 months from the original
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 68%
0Complaints at MahaRERAon this registration
Jump to the 154 documents Report an error

Aastha Residency is a Residential / Group Housing project by Nitin Hukumchand Rathod in Solapur, Maharashtra, registered with MahaRERA as P52600028323 on 18 Feb 2021. Possession is promised by 31 Dec 2026. The completion date has moved by 18 months from the original filing.

At a glance

Project

  • NameAastha Residency
  • TypeResidential / Group Housing
  • Location
    • Solapur
    • Solapur (M Corp.)
    • Solapur North
    • 413003
  • Pincode413003
  • RERA no.P52600028323
  • ReraGenie IDRG-MH-17101

Builder

  • NameNitin Hukumchand Rathod
  • Entity typeIndividual
  • Other registrations2 more →
  • Completed2 of 3
  • Declared earlier projects1 →

Key dates

this monthRegisteredFeb 2021First promiseJun 2025Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on18 Feb 2021
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 1 Jun 2025)
  • Buildings1 building record
  • Documents filed154 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Aastha ResidencyNA100000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 15 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 68%.

Aastha Residency: 51% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure68%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises43%
Sanitary Fittings within the flats / premises33%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks12%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.5%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.5%

Progress on shared amenities15

As on 15 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed173

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots173
Open Space173

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,456 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
Sagar Rameshchandra Kharade Prop. Of SRK InfraAurangabad (M Corp.)Aurangabad
Vrushali Vivek Navale Prop NIsa VenturesPune (M Corp.)Pune

Approvals and building plan

Sanctioning authoritySolapur Municipal Corporation
Permissible FSI4230.71
Proposed, not sanctioned4,231 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchJule Solapur Solapur

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRahul Khamitkar
EngineerRahul Khamitkar
Chartered AccountantCA Aditya Kondale
Chartered AccountantHiremath Patil Udgiri and Associates
PartnerRole in project
Nitin Hukumchand Rathod-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52600017635Jun 2025 → Dec 2026

Reason as filed by the promoterTO' The MahaRERA. Subject: Extension to the project bearing registration number P52600028323. Sir, I, Nitin Hukumchand Rathod, hereby apply for extension u/s 7(3) of the registered project bearing vide no PP52600028323. As prescribed under_circular no 07/2019 dated 08 Feb 2019, the consent of 51% of the allottees is enclosed herewith.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Feb 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Dec 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Oct 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed154

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 154 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: FORM-1_ARCHITECT CERTIFICATE_AASTHA WING B (1).pdf15 Apr 2026
Form 2File: FORM- 2 - Engineer Aastha.pdf15 Apr 2026
Form 3File: FORM-3_CA CERTIFICATE_AASTHA WING B.pdf15 Apr 2026
Disclosure of Sold and Booked InventoryFile: AASTHA-B-SOLD BOOKED INVENTORY.pdf15 Apr 2026
Form 1File: Form 1.pdf16 Jan 2026
Form 2File: Form 2.pdf16 Jan 2026
Form 3File: Form 03.pdf16 Jan 2026
Disclosure of Sold and Booked InventoryFile: INVENTORY.pdf16 Jan 2026
Form 5 (FY 2024-2025)File: Portal Form 5 20242025 Sign.pdf1 Dec 2025
Form 1File: FORM 01_ARCHITECT CERTIFICATE_AASTHA (1).pdf19 Oct 2025
Form 2File: FORM 2_ENGINEER CERTIFICATE_AASTHA (1).pdf19 Oct 2025
Form 3File: FORM-3.pdf19 Oct 2025
Disclosure of Sold and Booked InventoryFile: AASTHA_SOLD INVENTORY.pdf19 Oct 2025
Form 1File: Form 1 - Architect.pdf19 Jul 2025
Form 2File: Form 2 - Engineer Aastha.pdf19 Jul 2025
Form 3File: FORM-3-CA.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: AASTHA-B-SOLD.pdf19 Jul 2025
Form 1File: Form 1 - Architect.pdf19 Jul 2025
Form 2File: Form 2 - Engineer Aastha.pdf19 Jul 2025
Form 3File: FORM-3-CA.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: AASTHA-B-SOLD.pdf19 Jul 2025
Form 1File: Form 1 - Architect.pdf19 Jul 2025
Form 2File: Form 2 - Engineer Aastha.pdf19 Jul 2025
Form 3File: FORM-3-CA.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: AASTHA-B-SOLD.pdf19 Jul 2025
Form 1File: Form 1 - Architect.pdf19 Jul 2025
Form 2File: Form 2 - Engineer Aastha.pdf19 Jul 2025
Form 3File: FORM-3-CA.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: AASTHA-B-SOLD.pdf19 Jul 2025
Form 1File: Form 1 - Architect.pdf19 Jul 2025
Form 2File: Form 2 - Engineer Aastha.pdf19 Jul 2025
Form 3File: FORM-3-CA.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Inventory.pdf19 Jul 2025
Form 1File: Form 1 - Architect.pdf19 Jul 2025
Form 2File: Form 2 - Engineer Aastha.pdf19 Jul 2025
Form 3File: FORM-3-CA.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Inventory.pdf19 Jul 2025
Form 1File: Form 1 - Architect.pdf19 Jul 2025
Form 2File: Form 2 - Engineer Aastha.pdf19 Jul 2025
Form 3File: FORM-3-CA.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Inventory.pdf19 Jul 2025
Form 1File: Form 1 - Architect.pdf19 Jul 2025
Form 2File: Form 2 - Engineer Aastha.pdf19 Jul 2025
Form 3File: FORM-3-CA.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Inventory.pdf19 Jul 2025
Form 1File: Form 1 - Architect.pdf19 Jul 2025
Form 2File: Form 2 - Engineer Aastha.pdf19 Jul 2025
Form 3File: FORM-3-CA.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Inventory.pdf19 Jul 2025
Form 1File: Form 1 - Architect.pdf19 Jul 2025
Form 2File: Form 2 - Engineer Aastha.pdf19 Jul 2025
Form 3File: FORM-3-CA.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Inventory.pdf19 Jul 2025
Form 1File: Form 1 - Architect.pdf19 Jul 2025
Form 2File: Form 2 - Engineer Aastha.pdf19 Jul 2025
Form 3File: FORM-3-CA.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Inventory.pdf19 Jul 2025
Form 1File: Form 1 - Architect.pdf19 Jul 2025
Form 2File: Form 2 - Engineer Aastha.pdf19 Jul 2025
Form 3File: FORM-3-CA.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Inventory.pdf19 Jul 2025
Form 1File: Form 1 - Architect.pdf19 Jul 2025
Form 2File: Form 2 - Engineer Aastha.pdf19 Jul 2025
Form 3File: FORM-3-CA.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Inventory.pdf19 Jul 2025
Form 1File: Form 1 - Architect.pdf19 Jul 2025
Form 2File: Form 2 - Engineer Aastha.pdf19 Jul 2025
Form 3File: FORM-3-CA.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Inventory.pdf19 Jul 2025
Form 1File: Form 1 - Architect.pdf19 Jul 2025
Form 2File: Form 2 - Engineer Aastha.pdf19 Jul 2025
Form 3File: FORM-3-CA.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Inventory.pdf19 Jul 2025
Form 1File: Form 1 - Architect.pdf19 Jul 2025
Form 2File: Form 2 - Engineer Aastha.pdf19 Jul 2025
Form 3File: FORM-3-CA.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Inventory.pdf19 Jul 2025
Form 1File: Form 1 - Architect.pdf19 Jul 2025
Form 2File: Form 2 - Engineer Aastha.pdf19 Jul 2025
Form 3File: FORM-3-CA.pdf19 Jul 2025

How this compares with Solapur

15%of Solapur projects moved their completion datethis one moved by 18 months
39%of Solapur registrations have lapsed or been cancelledthis one is on the register

Computed across the 550+ Solapur projects on ReraGenie, from their own filings.

Keep Aastha Residency on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Solapur550+ in Solapur

Builder: Nitin Hukumchand Rathod

NITIN HUKUMCHAND RATHOD has 3 registrations on MahaRERA, including AARYA RESIDENCY and AKSHAY LABH. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Solapur district page.

Frequently asked questions

What are my rights if Aastha Residency is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Aastha Residency?

The registered promoter entity is Nitin Hukumchand Rathod, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Aastha Residency?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Aastha Residency?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Aastha Residency?

The professionals named in the filing: Architect: Rahul Khamitkar; Engineer: Rahul Khamitkar; Chartered Accountant: CA Aditya Kondale; Chartered Accountant: Hiremath Patil Udgiri and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Aastha Residency?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Aastha Residency. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Aastha Residency to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.