Home / Browse projects / Pune, Maharashtra / AARYARAJ ELEGANCE
AARYARAJ ELEGANCE
RG-MH-26148 · RERA P52100013626 · Last updated on MahaRERA portal: 7 Mar 2024
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 40 months past the filed date
- Completion date moved by 38 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
AARYARAJ ELEGANCE is a Residential / Group Housing project by AARYARAJ DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100013626 on 16 Oct 2017. Possession was promised by 30 Jun 2023 and is now 40 months past that date. The completion date has moved by 38 months from the original filing.
At a glance
Project
- NameAARYARAJ ELEGANCE
- TypeResidential / Group Housing
- Location
- sHIVANE VILLAGE ROAD
- MAUJE SHIVANE
- Shivne (Part)
- Haveli
- Pune
- 411023
- Pincode411023
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100013626
- ReraGenie IDRG-MH-26148
Builder
- NameAARYARAJ DEVELOPERS
- Entity typePartnership
- GSTIN27ABFFA0666A1ZX
- PartnersSAGAR SURENDRA LAIGUDE, GAJANAN SURENDRA LAIGUDE, SURENDRA BABURAO LAIGUDE, KISHOR MANOHAR BETTIGIRI, SANGRAM SURENDRA LAIGUDE
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on16 Oct 2017
- Promised completion30 Jun 2023
- Revised completionRevised to 30 Jun 2023 (originally 30 Apr 2020)
- Buildings1 building record
- Documents filed73 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| AARYARAJ ELEGANCE | NA | 5 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 7 Mar 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
AARYARAJ ELEGANCE: 82% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 7 Mar 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | GANESH MADHUKAR WAYDANDE |
| Engineer | SANGARM SURENDRA LAIGUDE |
| Chartered Accountant | PRASAD MALKAR |
| Chartered Accountant | indrajit tambade |
| Partner | Role in project |
|---|---|
| AARYARAJ DEVELOPERS | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterConstruction and development work is already completed. However Possession is delayed due to Lockdown caused by COVID -19 outbreak and Government Restrictions. We require time for completing Possession Process , Forming Association of Allotee and executing conveyance deed.
Reason as filed by the promoterWe had completed 95% of project till now. The delay happened due to shortage of labor and material due to Pandemic. We require some additional time to complete the development work and hand over possession of project , form association of allottees and complete the hand over process. Due to Pandemic project approving authority is working with limited strength which results in to delay in getting occupancy certificate. We already had communicated this to our allottees and seek consent from them for further extension of Project Validity Period. We request us to grant us 2 years extension for our
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 29 Sep 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 29 Sep 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 29 Sep 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 3 Mar 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed73
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form -5 2022-23.pdf | 7 Mar 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FROM -1 ARCHITECT CERTIFICATE.pdf | 1 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2 A Engineer Certificate Aaryaraj .pdf | 1 Feb 2024 |
| Certificates of CA (Form 3)File: Form -3 CA certificate Q3 2023-24_compressed.pdf | 1 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 RERA Architects Q1 2023-24 08112023.pdf | 9 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 RERA Architects Q2 2023-24 07102023.pdf | 9 Nov 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA ENGINEER FORM 2 Q2 2023-24 08112023.pdf | 9 Nov 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Rara engineer form 2 Q2 2023-24 07102023.pdf | 9 Nov 2023 |
| Certificates of CA (Form 3)File: FROM 3 CA CERTIFICATE_compressed.pdf | 9 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: TINGRE ELITE PHASE 1.pdf | 18 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form -5 2021-22.pdf | 18 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARCHITECTS CERTIFICATE Q4 13042023-_compressed.pdf | 15 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2.pdf | 15 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM-2A 2022-23.pdf | 15 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM- 5 2019-20.pdf | 29 Mar 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects certificate form 1.pdf | 10 Aug 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's certificate form -2 Q2 2022-23_compressed.pdf | 10 Aug 2022 |
| Certificates of CA (Form 3)File: aaryaraj developers form 3 q1_compressed.pdf | 10 Aug 2022 |
| Certificates of CA (Form 3)File: aryaraj form 3 - Q-4 21-22_compressed.pdf | 17 Jun 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5- 2020-21.pdf | 17 Jun 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects certificate form-1 q4.pdf | 11 Apr 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: from engineer's certificate form -2_compressed.pdf | 11 Apr 2022 |
| Engineers Certificate on Quality Assurance (Form 2A)File: from2A_compressed.pdf | 11 Apr 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARCHITECTURE CERTIFICATE Q3_compressed.pdf | 10 Mar 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: from-2 Engineer's Certificate Q3 FINAL_compressed.pdf | 10 Mar 2022 |
| Certificates of CA (Form 3)File: FORM -3 Q3 2021-22.pdf | 9 Mar 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM -1 ARCHITECT CERTICIATE.pdf | 21 Oct 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA ENGINEER FORM 2 04102021.pdf | 21 Oct 2021 |
| Certificates of CA (Form 3)File: form 3 q2 21-22.pdf | 21 Oct 2021 |
| Declaration about Commencement CertificateFile: DECLARATION 001.pdf | 30 Jul 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architecture certificate form 1.pdf | 30 Jul 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM -2 ENGINEER CERTIFICATE.pdf | 30 Jul 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM-2A.pdf | 30 Jul 2021 |
| Certificates of CA (Form 3)File: form 3 aryaraj.pdf | 30 Jul 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: AARYARAJ DEVELOPERS ANUAL REPORT 2020-2021.pdf | 30 Jul 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ilovepdf_merged.pdf | 14 Jun 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 RERA ENGINEER CERTIFICATE.pdf | 14 Jun 2021 |
| Disclosure of sold/ booked inventoryFile: aaryaraj developers Disclosure of sold inventory Q4 20-21.pdf | 24 May 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT FORM 1.pdf | 25 Nov 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER FORM 2.pdf | 25 Nov 2020 |
| Details of Restarting of Construction work post lockdownFile: rera covid 19.pdf | 23 Jun 2020 |
| Certificates of CA (Form 3)File: Aaryaraj Developers Form 3_compressed.pdf | 18 Feb 2020 |
| Engineers Certificate on Quality Assurance (Form 2A)File: FORM-2A 1-1-2020.pdf | 1 Feb 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architecture certificate form 1 1-10-2020.pdf | 31 Jan 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ENGINEER CERTIFICATE 01012020_compressed.pdf | 31 Jan 2020 |
| Certificates of CA (Form 3)File: Aaryaraj Developers RERA form 3_compressed.pdf | 16 Nov 2019 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: CA FORM 5.pdf | 16 Nov 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE FORM 1.pdf | 22 Oct 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE FORM 2_compressed.pdf | 22 Oct 2019 |
| Engineers Certificate on Quality Assurance (Form 2A)File: FORM 2A.pdf | 22 Oct 2019 |
| Certificates of CA (Form 5)File: CA FORM 5.pdf | 22 Oct 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Aaryaraj Developers Architectural certificate 1-7-2019.pdf | 31 Jul 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Aaryaraj Developers Engineer certificate 1-7-2019.pdf | 31 Jul 2019 |
| Certificates of CA (Form 3)File: Aaryaraj Developers ca for 3_compressed.pdf | 31 Jul 2019 |
| Certificates of CA (Form 5)File: FROM 5 CA_1.pdf | 7 Aug 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: PMRDA.pdf | 3 Mar 2018 |
| OtherFile: NA ORDER.pdf | 3 Mar 2018 |
| Declaration in FORM BFile: form B.pdf | 15 Dec 2017 |
| Building plan approvalFile: plan 1.pdf | 29 Sep 2017 |
| Building plan approvalFile: plan2.pdf | 29 Sep 2017 |
| Layout approvalFile: plan 1.pdf | 29 Sep 2017 |
| Layout approvalFile: plan2.pdf | 29 Sep 2017 |
| PAN CardFile: PAN.pdf | 29 Sep 2017 |
| Copy of the legal title reportFile: Legal title Reprot.pdf | 29 Sep 2017 |
| Details of encumbrancesFile: Encumbrances.pdf | 29 Sep 2017 |
| Copy of Layout Approval (in case of layout)File: plan 1.pdf | 29 Sep 2017 |
| Copy of Layout Approval (in case of layout)File: plan2.pdf | 29 Sep 2017 |
| Building Plan Approval (IOD)File: plan 1.pdf | 29 Sep 2017 |
| Building Plan Approval (IOD)File: plan2.pdf | 29 Sep 2017 |
| Declaration in FORM BFile: Form B Declaration.pdf | 29 Sep 2017 |
| Certificates of CA (Form 3)File: CA certificate.pdf | 29 Sep 2017 |
| Proforma of Allotment letterFile: Agreement of Sales.pdf | 29 Sep 2017 |
| Proforma of Allotment letterFile: allotment letter.pdf | 29 Sep 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 73 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep AARYARAJ ELEGANCE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near MAUJE SHIVANE13,700+ in Pune
Filed coordinates, straight-line distance. 35 registered projects within 2 km.
Mont Vert Kingstown Sector 1 Residential Wings
Niraj Kumar Associates Pvt Ltd
RANJAI
Shinde & Patil Construction
SAI NISARG
SHRI SAI SHRADDHA DEVELOPERS
ANSHRAJ ICON
VIJAY DEVELOPERS
Belview
Tranquil Infratech LLP
Audumbar Nest A1 A2 and B Building
Om Chidanand Developers
Builder: AARYARAJ DEVELOPERS
AARYARAJ DEVELOPERS has 1 registration on MahaRERA, including AARYARAJ ELEGANCE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that AARYARAJ ELEGANCE shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if AARYARAJ ELEGANCE is delayed beyond 30 Jun 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of AARYARAJ ELEGANCE?
The registered promoter entity is AARYARAJ DEVELOPERS, a partnership as per the filing. Its GSTIN 27ABFFA0666A1ZX can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in AARYARAJ ELEGANCE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for AARYARAJ ELEGANCE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at AARYARAJ ELEGANCE?
The professionals named in the filing: Architect: GANESH MADHUKAR WAYDANDE; Engineer: SANGARM SURENDRA LAIGUDE; Chartered Accountant: PRASAD MALKAR; Chartered Accountant: indrajit tambade. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in AARYARAJ ELEGANCE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback