Registration lapsed No litigation declared Residential / Group Housing project

AARYARAJ ELEGANCE

By AARYARAJ DEVELOPERS

RG-MH-26148 · RERA P52100013626 · Last updated on MahaRERA portal: 7 Mar 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 40 months past the filed date
  • Completion date moved by 38 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2023Possession promised40 months past this date
9 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 73 documents Report an error

AARYARAJ ELEGANCE is a Residential / Group Housing project by AARYARAJ DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100013626 on 16 Oct 2017. Possession was promised by 30 Jun 2023 and is now 40 months past that date. The completion date has moved by 38 months from the original filing.

At a glance

Project

  • NameAARYARAJ ELEGANCE
  • TypeResidential / Group Housing
  • Location
    • sHIVANE VILLAGE ROAD
    • MAUJE SHIVANE
    • Shivne (Part)
    • Haveli
    • Pune
    • 411023
  • Pincode411023
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100013626
  • ReraGenie IDRG-MH-26148

Builder

  • NameAARYARAJ DEVELOPERS
  • Entity typePartnership
  • GSTIN27ABFFA0666A1ZX
  • PartnersSAGAR SURENDRA LAIGUDE, GAJANAN SURENDRA LAIGUDE, SURENDRA BABURAO LAIGUDE, KISHOR MANOHAR BETTIGIRI, SANGRAM SURENDRA LAIGUDE

Key dates

40 months past promisethis monthRegisteredOct 2017First promiseApr 2020Revised toJun 2023

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on16 Oct 2017
  • Promised completion30 Jun 2023
  • Revised completionRevised to 30 Jun 2023 (originally 30 Apr 2020)
  • Buildings1 building record
  • Documents filed73 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AARYARAJ ELEGANCENA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 7 Mar 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

AARYARAJ ELEGANCE: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 7 Mar 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,100 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityPMRDA
Permissible FSI2839.38
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSR NO 118 JAIDEVNAGAR SINHGAD ROAD PUNE 411030

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGANESH MADHUKAR WAYDANDE
EngineerSANGARM SURENDRA LAIGUDE
Chartered AccountantPRASAD MALKAR
Chartered Accountantindrajit tambade
PartnerRole in project
AARYARAJ DEVELOPERS-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100006128Apr 2020 → Jul 2021

Reason as filed by the promoterConstruction and development work is already completed. However Possession is delayed due to Lockdown caused by COVID -19 outbreak and Government Restrictions. We require time for completing Possession Process , Forming Association of Allotee and executing conveyance deed.

EXT52100010644Apr 2020 → Jun 2023

Reason as filed by the promoterWe had completed 95% of project till now. The delay happened due to shortage of labor and material due to Pandemic. We require some additional time to complete the development work and hand over possession of project , form association of allottees and complete the hand over process. Due to Pandemic project approving authority is working with limited strength which results in to delay in getting occupancy certificate. We already had communicated this to our allottees and seek consent from them for further extension of Project Validity Period. We request us to grant us 2 years extension for our

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Sep 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Sep 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Sep 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Mar 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed73

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form -5 2022-23.pdf7 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FROM -1 ARCHITECT CERTIFICATE.pdf1 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2 A Engineer Certificate Aaryaraj .pdf1 Feb 2024
Certificates of CA (Form 3)File: Form -3 CA certificate Q3 2023-24_compressed.pdf1 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 RERA Architects Q1 2023-24 08112023.pdf9 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 RERA Architects Q2 2023-24 07102023.pdf9 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA ENGINEER FORM 2 Q2 2023-24 08112023.pdf9 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Rara engineer form 2 Q2 2023-24 07102023.pdf9 Nov 2023
Certificates of CA (Form 3)File: FROM 3 CA CERTIFICATE_compressed.pdf9 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: TINGRE ELITE PHASE 1.pdf18 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form -5 2021-22.pdf18 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARCHITECTS CERTIFICATE Q4 13042023-_compressed.pdf15 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2.pdf15 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM-2A 2022-23.pdf15 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM- 5 2019-20.pdf29 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects certificate form 1.pdf10 Aug 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's certificate form -2 Q2 2022-23_compressed.pdf10 Aug 2022
Certificates of CA (Form 3)File: aaryaraj developers form 3 q1_compressed.pdf10 Aug 2022
Certificates of CA (Form 3)File: aryaraj form 3 - Q-4 21-22_compressed.pdf17 Jun 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5- 2020-21.pdf17 Jun 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects certificate form-1 q4.pdf11 Apr 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: from engineer's certificate form -2_compressed.pdf11 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A)File: from2A_compressed.pdf11 Apr 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARCHITECTURE CERTIFICATE Q3_compressed.pdf10 Mar 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: from-2 Engineer's Certificate Q3 FINAL_compressed.pdf10 Mar 2022
Certificates of CA (Form 3)File: FORM -3 Q3 2021-22.pdf9 Mar 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM -1 ARCHITECT CERTICIATE.pdf21 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA ENGINEER FORM 2 04102021.pdf21 Oct 2021
Certificates of CA (Form 3)File: form 3 q2 21-22.pdf21 Oct 2021
Declaration about Commencement CertificateFile: DECLARATION 001.pdf30 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architecture certificate form 1.pdf30 Jul 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM -2 ENGINEER CERTIFICATE.pdf30 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM-2A.pdf30 Jul 2021
Certificates of CA (Form 3)File: form 3 aryaraj.pdf30 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: AARYARAJ DEVELOPERS ANUAL REPORT 2020-2021.pdf30 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ilovepdf_merged.pdf14 Jun 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 RERA ENGINEER CERTIFICATE.pdf14 Jun 2021
Disclosure of sold/ booked inventoryFile: aaryaraj developers Disclosure of sold inventory Q4 20-21.pdf24 May 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT FORM 1.pdf25 Nov 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER FORM 2.pdf25 Nov 2020
Details of Restarting of Construction work post lockdownFile: rera covid 19.pdf23 Jun 2020
Certificates of CA (Form 3)File: Aaryaraj Developers Form 3_compressed.pdf18 Feb 2020
Engineers Certificate on Quality Assurance (Form 2A)File: FORM-2A 1-1-2020.pdf1 Feb 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architecture certificate form 1 1-10-2020.pdf31 Jan 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ENGINEER CERTIFICATE 01012020_compressed.pdf31 Jan 2020
Certificates of CA (Form 3)File: Aaryaraj Developers RERA form 3_compressed.pdf16 Nov 2019
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: CA FORM 5.pdf16 Nov 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE FORM 1.pdf22 Oct 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE FORM 2_compressed.pdf22 Oct 2019
Engineers Certificate on Quality Assurance (Form 2A)File: FORM 2A.pdf22 Oct 2019
Certificates of CA (Form 5)File: CA FORM 5.pdf22 Oct 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Aaryaraj Developers Architectural certificate 1-7-2019.pdf31 Jul 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Aaryaraj Developers Engineer certificate 1-7-2019.pdf31 Jul 2019
Certificates of CA (Form 3)File: Aaryaraj Developers ca for 3_compressed.pdf31 Jul 2019
Certificates of CA (Form 5)File: FROM 5 CA_1.pdf7 Aug 2018
Commencement Certificates / NA Order for plotted developmentFile: PMRDA.pdf3 Mar 2018
OtherFile: NA ORDER.pdf3 Mar 2018
Declaration in FORM BFile: form B.pdf15 Dec 2017
Building plan approvalFile: plan 1.pdf29 Sep 2017
Building plan approvalFile: plan2.pdf29 Sep 2017
Layout approvalFile: plan 1.pdf29 Sep 2017
Layout approvalFile: plan2.pdf29 Sep 2017
PAN CardFile: PAN.pdf29 Sep 2017
Copy of the legal title reportFile: Legal title Reprot.pdf29 Sep 2017
Details of encumbrancesFile: Encumbrances.pdf29 Sep 2017
Copy of Layout Approval (in case of layout)File: plan 1.pdf29 Sep 2017
Copy of Layout Approval (in case of layout)File: plan2.pdf29 Sep 2017
Building Plan Approval (IOD)File: plan 1.pdf29 Sep 2017
Building Plan Approval (IOD)File: plan2.pdf29 Sep 2017
Declaration in FORM BFile: Form B Declaration.pdf29 Sep 2017
Certificates of CA (Form 3)File: CA certificate.pdf29 Sep 2017
Proforma of Allotment letterFile: Agreement of Sales.pdf29 Sep 2017
Proforma of Allotment letterFile: allotment letter.pdf29 Sep 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 38 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AARYARAJ ELEGANCE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MAUJE SHIVANE13,700+ in Pune

2 kmAARYARAJ ELEGANCECompleted 11Lapsed / revoked 13Other 11Dot size: filed unitsN

Filed coordinates, straight-line distance. 35 registered projects within 2 km.

Builder: AARYARAJ DEVELOPERS

AARYARAJ DEVELOPERS has 1 registration on MahaRERA, including AARYARAJ ELEGANCE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that AARYARAJ ELEGANCE shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if AARYARAJ ELEGANCE is delayed beyond 30 Jun 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AARYARAJ ELEGANCE?

The registered promoter entity is AARYARAJ DEVELOPERS, a partnership as per the filing. Its GSTIN 27ABFFA0666A1ZX can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AARYARAJ ELEGANCE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AARYARAJ ELEGANCE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AARYARAJ ELEGANCE?

The professionals named in the filing: Architect: GANESH MADHUKAR WAYDANDE; Engineer: SANGARM SURENDRA LAIGUDE; Chartered Accountant: PRASAD MALKAR; Chartered Accountant: indrajit tambade. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AARYARAJ ELEGANCE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AARYARAJ ELEGANCE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AARYARAJ ELEGANCE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.