ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / 71P

Registered No litigation declared Others project

71P

By LIVING HABITATS PRIVATE LIMITED

RG-MH-05841 · RERA P51800051382 · Last updated on MahaRERA portal: 30 May 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 15 months
  • 1 extension taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 15 months from the original
3 of 11Construction stages donefurthest along: Stilt Floor, 50%
38 of 60Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 95 documents Report an error

71P is a Others project by LIVING HABITATS PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800051382 on 8 Jun 2023. Possession is promised by 31 Dec 2026. The completion date has moved by 15 months from the original filing. 22 of the 60 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • Name71P
  • TypeOthers
  • Location
    • KASTURBA CROSS ROAD NO 4
    • BORIVALI EAST
    • MUMBAI
    • Kanheri
    • Borivali
    • Mumbai Suburban
    • 400066
  • Pincode400066
  • RERA no.P51800051382
  • ReraGenie IDRG-MH-05841

Builder

  • NameLIVING HABITATS PRIVATE LIMITED
  • Entity typeCompany
  • DirectorSANJAY PARMESHWAR MITTAL

Key dates

this monthRegisteredJun 2023First promiseSep 2025Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on8 Jun 2023
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Sep 2025)
  • Buildings1 building record
  • Documents filed95 files

Current status

37%22 of 60 units booked
75.7%Work done, per cost certificate

Figures as on 30 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
71PNA12660060

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 50%.

71P: 40% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor50%
Slabs of Super Structure41%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks25%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%

Progress on shared amenities15

As on 30 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes75%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes50%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes25%
Electrical meter room, sub-station, receiving stationYes75%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed87

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots87
Closed/Covered87

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,505 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on1 Aug 2025
LandownerVillageDistrict
STATE BANK OF INDIA EMPLOYEES PRASHANT CHS LTDKanheriMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI4867.62
Proposed, not sanctioned2,304 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch215, FREE PRESS HOUSE, FREE PRESS MARG, NARIMAN POINT, MUMBAI-400021
Estimated costRs 17.05 cr
Cost incurredRs 12.90 cr
Work done75.68%
BuildingWingEstimatedIncurred
71PNARs 17.05 crRs 12.90 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAR MEHTA
ArchitectPARIN SHAH
EngineerBHAVESHR PARMAR
EngineerJACOB BASTYAW DSOUZA
Chartered AccountantANKESH GUPTA & CO
Chartered AccountantNEHALI DOSHI
PartnerRole in project
LIVING HABITATS PRIVATE LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA08082502342Sep 2025 → Dec 2026

Reason as filed by the promoterWe would like to respectfully bring to your attention that the project has encountered certain unforeseen technical challenges that have adversely impacted the originally proposed timelines for completion. We wish to place on record the following reasons for the delay: 1. Structural Redesign or Change in Planning Based on technical site evaluations and safety audits, certain aspects of the structural layout and MEP systems had to be redesigned to meet updated technical standards and ensure long-term safety and quality. 2. Delay in Statutory Clearances/Utility Approvals The redesigning and revi

Litigation declared7

CaseCourtStatus
200107/2020/2020CITY CIVIL DINDOSHIRECORDING EVIDENCE
200108/2020/2020CITY CIVIL DINDOSHIAPPEARANCE
200109/2020/2020CITY CIVIL DINDOSHIAPPEARANCE
200110/2020/2020CITY CIVIL DINDOSHIAPPEARANCE
200111/2020/2020CITY CIVIL DINDOSHIRECOREDING EVIDENCE
200112/2020/2020CITY CIVIL DINDOSHINOTICE TO BE SERVED EVIDENCE
1470/2019BOMBAY HIGH COURTArbitration application file with high court for new arbitration pending with high court

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
SM12600157Bhakti AchrekarLIVING HABITATS PRIVATE LIMITED05/03/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 May 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Oct 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Oct 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed95

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 95 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 architects certificate 71P Mar 26 -signed.pdf30 May 2026
Withdrawal Update Form 2File: ENGINEER FORM 2 - 71P march 26 -signed.pdf30 May 2026
Withdrawal Update Form 3File: CA Certificate 71P - March -2026 signed.pdf30 May 2026
Withdrawal Update Form 1File: form 1.pdf10 Mar 2026
Withdrawal Update Form 2File: form 2.pdf10 Mar 2026
Withdrawal Update Form 3File: form 3.pdf10 Mar 2026
Withdrawal Update Form 1File: ARCHITECT FORM 1 (2).pdf28 Nov 2025
Withdrawal Update Form 2File: ENGINEER FORM 2.pdf28 Nov 2025
Withdrawal Update Form 3File: Signed CA Certificate 71P Sept25.pdf28 Nov 2025
Layout approvalFile: Approved Amended Drawing_compressed (1).pdf6 Oct 2025
Building plan approvalFile: Approved Amended Certificate.pdf6 Oct 2025
Layout approvalFile: Amended Plans 27032025 - Pg 1.pdf2 Apr 2025
Layout approvalFile: Amended Plans 27032025 - Pg 2.pdf2 Apr 2025
Layout approvalFile: Amended Plans 27032025 - Pg 3.pdf2 Apr 2025
Layout approvalFile: Amended Plans 27032025 - Pg 4.pdf2 Apr 2025
Layout approvalFile: Amended Plans 27032025 - Pg 5.pdf2 Apr 2025
Layout approvalFile: Amended Plans 27032025 - Pg 6.pdf2 Apr 2025
Layout approvalFile: Amended Plans 27032025 - Pg 7.pdf2 Apr 2025
Layout approvalFile: Amended Plans 27032025 - Pg 8.pdf2 Apr 2025
Layout approvalFile: Amended Plans 27032025 - Pg 9.pdf2 Apr 2025
Building plan approvalFile: Amended Plan Approval Letter 27032025.pdf2 Apr 2025
Copy of Layout Approval (in case of layout)File: Amended Plans 27032025 - Pg 1.pdf2 Apr 2025
Copy of Layout Approval (in case of layout)File: Amended Plans 27032025 - Pg 2.pdf2 Apr 2025
Copy of Layout Approval (in case of layout)File: Amended Plans 27032025 - Pg 3.pdf2 Apr 2025
Copy of Layout Approval (in case of layout)File: Amended Plans 27032025 - Pg 4.pdf2 Apr 2025
Copy of Layout Approval (in case of layout)File: Amended Plans 27032025 - Pg 5.pdf2 Apr 2025
Copy of Layout Approval (in case of layout)File: Amended Plans 27032025 - Pg 6.pdf2 Apr 2025
Copy of Layout Approval (in case of layout)File: Amended Plans 27032025 - Pg 7.pdf2 Apr 2025
Copy of Layout Approval (in case of layout)File: Amended Plans 27032025 - Pg 8.pdf2 Apr 2025
Copy of Layout Approval (in case of layout)File: Amended Plans 27032025 - Pg 9.pdf2 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Amended Plan Approval Letter 27032025.pdf2 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: CC REVALIDATION.pdf25 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA Certificate 30-06-23.pdf18 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA Certificate 30-09-23.pdf18 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA Certificate 31-12-23.pdf18 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA Certificate 31-03-24.pdf18 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA Certificate 30-06-24.pdf18 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA Certificate 30-09-24.pdf18 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA Certificate 31-12-24.pdf18 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Annual CA Certificate 31032024.pdf14 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arch Certificate 30062024.pdf31 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arch Certificate 30092024.pdf31 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arch Certificate 31122024.pdf31 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arch Certificate 31032024.pdf31 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Eng Certificate 31032024.pdf31 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Eng Certificate 31122024.pdf31 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Eng Certificate 30092024.pdf31 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Eng Certificate 30062024.pdf31 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Eng Quality Assurance Cert 31032023.pdf31 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Eng Quality Assurance Cert 31032024.pdf31 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Eng Quality Assurance Cert 30062024.pdf31 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Eng Quality Assurance Cert 30092024.pdf31 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Eng Quality Assurance Cert 31122024.pdf31 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1.pdf11 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERT.pdf11 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM-2A.pdf11 Jan 2024
Other - LegalFile: Declaration of Prashant CHS Ltd_.pdf11 Sep 2023
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE new.pdf23 May 2023
Details of encumbrances concerned to LegalFile: ENCUMBRANCE new.pdf23 May 2023
Other - LegalFile: POA_1-12.pdf23 May 2023
Other - LegalFile: POA_13-end.pdf23 May 2023
Copy of the legal title reportFile: LIVING HABITANT-SBI PRASHANT CHS-TITLE CERTIFICATE -17-11-2022.pdf22 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: SPM and BSM Declaration of Interest.pdf22 May 2023
Other - TechnicalFile: Clearification for units.pdf22 May 2023
Layout approvalFile: Plans 5.pdf10 May 2023
Layout approvalFile: Plans 6.pdf10 May 2023
Layout approvalFile: Plans 7.pdf10 May 2023
Building plan approvalFile: IOD.pdf10 May 2023
Layout approvalFile: Plans 1.pdf10 May 2023
Layout approvalFile: Plans 2.pdf10 May 2023
Layout approvalFile: Plans 3.pdf10 May 2023
Layout approvalFile: Plans 4.pdf10 May 2023
PAN CardFile: Company pan card.pdf10 May 2023
Details of encumbrances concerned to FinanceFile: No encumbrance.pdf10 May 2023
Details of encumbrances concerned to LegalFile: No encumbrance.pdf10 May 2023
Copy of Layout Approval (in case of layout)File: Plans 1.pdf10 May 2023
Copy of Layout Approval (in case of layout)File: Plans 2.pdf10 May 2023
Copy of Layout Approval (in case of layout)File: Plans 3.pdf10 May 2023
Copy of Layout Approval (in case of layout)File: Plans 4.pdf10 May 2023
Copy of Layout Approval (in case of layout)File: Plans 5.pdf10 May 2023

How this compares with Mumbai Suburban

37%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 15 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep 71P on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BORIVALI EAST, MUMBAI6,700+ in Mumbai Suburban

Builder: LIVING HABITATS PRIVATE LIMITED

LIVING HABITATS PRIVATE LIMITED has 1 registration on MahaRERA, including 71P. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if 71P is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of 71P?

The registered promoter entity is LIVING HABITATS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in 71P?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against 71P?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for 71P?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at 71P?

The professionals named in the filing: Architect: AR MEHTA; Architect: PARIN SHAH; Engineer: BHAVESHR PARMAR; Engineer: JACOB BASTYAW DSOUZA; Chartered Accountant: ANKESH GUPTA & CO; Chartered Accountant: NEHALI DOSHI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in 71P?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About 71P. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save 71P to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.