Home / Browse projects / Pune, Maharashtra / 7 BUSINESS SQUARE

Registered No litigation declared Others project

7 BUSINESS SQUARE

By NAIKNAVARE BUILDCON PVT LTD

RG-MH-13048 · RERA P52100022523 · Last updated on MahaRERA portal: 3 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 48 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 48 months from the original
11 of 11Construction stages doneevery applicable stage filed complete
3 of 87Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 272 documents Report an error

7 BUSINESS SQUARE is a Others project by NAIKNAVARE BUILDCON PVT LTD in Pune, Maharashtra, registered with MahaRERA as P52100022523 on 30 Sep 2019. Possession is promised by 31 Dec 2027. The completion date has moved by 48 months from the original filing. 84 of the 87 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete.

At a glance

Project

  • Name7 BUSINESS SQUARE
  • TypeOthers
  • Location
    • CTS NO 1108/7 F.P NO 487/7 SHIROLE PLOT GANESHKHIND ROAD SHIVAJINAGAR PUNE
    • SHIVAJINAGAR
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411006
  • Pincode411006
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100022523
  • ReraGenie IDRG-MH-13048

Builder

  • NameNAIKNAVARE BUILDCON PVT LTD
  • Entity typeCompany
  • Managing DirectorHEMANT DATTAJI NAIKNAVARE
  • Other registrations7 more →
  • Completed6 of 8
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects4 →

Key dates

this monthRegisteredSep 2019First promiseDec 2023Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on30 Sep 2019
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 30 Dec 2023)
  • Buildings1 building record
  • Documents filed272 files

Current status

97%84 of 87 units booked
100.0%Work done, per cost certificate

Figures as on 3 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
7 BUSINESS SQUARENA181508787

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 3 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

7 BUSINESS SQUARE: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 3 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes100%

Parking filed112

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots112
Closed/Covered109
Open Space3

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,096 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authoritySRA
Permissible FSI11952.22
Proposed, not sanctioned10,354 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPUNE MAIN BRANCH
Estimated costRs 64.69 cr
Cost incurredRs 64.69 cr
Work done100.0%
BuildingWingEstimatedIncurred
7 BUSINESS SQUARENARs 62.19 crRs 62.19 cr
-NARs 2.50 crRs 2.50 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGAURI NAIKNAVARE
ArchitectKRUPALI KADAM
EngineerSUNIL MULIK
EngineerDEVIDAS YANKULE
Chartered AccountantSHRISHIMAL AND ASSOCIATES
Chartered AccountantNAHAR JAIN AND ASSOCIATES
PartnerRole in project
NAIKNAVARE BUILDCON PVT LTD-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100019774Dec 2023 → Dec 2025

Reason as filed by the promoterTo, The MahaRERA, Subject: Correction Under Section 14(2) of the 7 Business Square Project bearing Registration No. P52100022523 This is to inform you that 7 Business Square is now completed with O.C. up to 12th floors as per RERA. Further, we have got FSI sanctioned from PMC Authority for 13th, 14th and 15th floor. Accordingly consents were taken from more than 2/3 of our existing customers and are attached herewith for your reference. Kindly grant us RERA extension and permission to construct and sell the same. Your co-operation is highly solicited. Extension up to 31/12/2025 for the fresh c

EXT52100018492Dec 2023 → Dec 2024

Reason as filed by the promoterTo MahaRERA MUMBAI Subject : Application for the extension of “7 BUSINESS SQUARE” with reason P52100022523 in RERA Dear Sir, We Have registered our 7 BUSINESS SQUARE P52100022523 under RERA. The proposed completion date for the said project was 30th Dec 2023. But considering poor market scenario of sale here we are in need of Project Extension for further 12 months. i.e upto 29 December 2024. We will complete our balance work and can get Occupation Certificate during course of extension period and we will upload the Occupancy certificate along with Form 4. So it is our sincere request to autho

EA04062621238Dec 2023 → Dec 2027

Reason as filed by the promoterThe project has been substantially completed and Occupancy Certificate has already been obtained for the major portion of the project. However, Occupancy Certificate in respect of the balance two store units is pending due to certain observations and compliance requirements raised by the Competent Authority during scrutiny of the project completion proposal. The Promoter is actively pursuing the matter with the concerned authorities and undertaking all necessary compliances to obtain the Occupancy Certificate for the said units at the earliest. The extension is sought solely for completion of

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 4 Jul 2024

Documents filed272

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 272 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: 7 BS Form 1.pdf3 Aug 2026
Withdrawal Update Form 1File: FORM 1 7BS MARCH END.pdf3 Aug 2026
Withdrawal Update Form 2File: FORM 2 7BS MARCH 2026.pdf3 Aug 2026
Withdrawal Update Form 2File: FORM 2 7BS MARCH 2026.pdf3 Aug 2026
Withdrawal Update Form 3File: Form 3 7BS June 26_11zon.pdf3 Aug 2026
Withdrawal Update Form 3File: FORM 3 7BS MARCH END.pdf3 Aug 2026
Form 2A (FY 2026-2027)File: f974021d-ab51-4d61-aeff-703a524b5613 (1).pdf3 Aug 2026
Withdrawal Update Form 1File: 7bs f1 31_03_2026.pdf10 Jun 2026
Withdrawal Update Form 2File: FORM 2 7BS MARCH 2026.pdf10 Jun 2026
Withdrawal Update Form 3File: Form 3 7BS March 26_removed-merged_11zon.pdf10 Jun 2026
Form 2A (FY 2025-2026)File: Form 2A 7BS.pdf10 Jun 2026
Form 2A (FY 2024-2025)File: Form 2A 7BS 24_25.pdf10 Jun 2026
Form 2A (FY 2019-2020)File: Form 2A 7BS 19_20.pdf10 Jun 2026
Form 2A (FY 2020-2021)File: Form 2A 7BS 19_20 (1).pdf10 Jun 2026
Form 2A (FY 2021-2022)File: Form 2A 7BS 21_22.pdf10 Jun 2026
Form 2A (FY 2022-2023)File: Form 2A 7BS 22_23.pdf10 Jun 2026
Form 2A (FY 2023-2024)File: Form 2A 7BS 23_24.pdf10 Jun 2026
Form 2A (FY 2024-2025)File: Form 2A 7BS 24_25.pdf10 Jun 2026
Form 2A (FY 2025-2026)File: Form 2A 7BS.pdf10 Jun 2026
Form 1File: 7BS RERA JAN MARCH 2025 - Uploaded.pdf3 Jun 2026
Form 2File: 7BS - Uploaded.pdf3 Jun 2026
Form 3File: 7 Business - Uploaded.pdf3 Jun 2026
Disclosure of Sold and Booked InventoryFile: 7 Businees Square - Disclosure Sold_Booked Inventory.pdf3 Jun 2026
Form 5 (FY 2021-2022)File: form 5 21-22 7BS.pdf23 Apr 2026
Form 5 (FY 2023-2024)File: for m 5 23-24.pdf23 Apr 2026
Form 5 (FY 2022-2023)File: form 5 21-22 7BS.pdf23 Apr 2026
Withdrawal Update Form 1File: 7BS FORM 1.pdf20 Jan 2026
Withdrawal Update Form 2File: 7 BS.pdf20 Jan 2026
Withdrawal Update Form 3File: 7 BUSINESS FORM 3 20_01_2026.pdf20 Jan 2026
Form 5 (FY 2024-2025)File: Form 5 7BS.pdf26 Dec 2025
Form 1File: 7BS FORM1.pdf15 Oct 2025
Form 2File: 7BS FORM 2.pdf15 Oct 2025
Form 3File: 7BS FORM 3.pdf15 Oct 2025
Disclosure of Sold and Booked InventoryFile: 7BS SOLD UNSOLD.pdf15 Oct 2025
Form 1File: 7BS FORM 1.pdf18 Jul 2025
Form 2File: 7BS FORM 2.pdf18 Jul 2025
Form 3File: 7 BUSINESS FORM 3.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: 7 Bs sold unsold.pdf18 Jul 2025
Self-declaration of Quarterly ProgressFile: 7BS SELF DECLARATION.pdf18 Jul 2025
Certificates of CA (Form 3)File: 7 Business.pdf18 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 7BS.pdf11 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7BS.pdf8 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7BS RERA JAN MARCH 2025.pdf26 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 7BS 2A.pdf18 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7BS OCT-DEC 2024 (1).pdf17 Jan 2025
Certificates of CA (Form 3)File: Form 3 7BS Dec 24 (2)_compressed.pdf16 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7 BUSINESS SQUARE.pdf16 Jan 2025
Disclosure of sold/ booked inventoryFile: 7BS.pdf16 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 7BS - 2023-24.pdf7 Nov 2024
Certificates of CA (Form 3)File: 7 BUSINESS1 FORM3_compressed (1).pdf29 Oct 2024
Certificates of CA (Form 3)File: 7BS_Form 3 Sept 24.pdf24 Oct 2024
OtherFile: 7BS 13 TH TO 15TH FLOOR AREA STATEMENT.pdf22 Oct 2024
Other - TechnicalFile: 7BS 13 TH TO 15TH FLOOR AREA STATEMENT.pdf22 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 7BS.pdf16 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7BS.pdf15 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7BS-RERA JULY SEP 2024.pdf9 Oct 2024
Disclosure of sold/ booked inventoryFile: 7 BS.pdf9 Oct 2024
Certificates of CA (Form 3)File: 7 business merged_compressed (1).pdf22 Jul 2024
Certificates of CA (Form 3)File: 7 BUSINESS .PDF20 Jul 2024
Disclosure of sold/ booked inventoryFile: 7 BS.pdf10 Jul 2024
Home Buyer /Allottee Grievance Redressal CellFile: 7BS.pdf10 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7 BS.pdf6 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: APRIL-JUNE 2024 7 BS.pdf4 Jul 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 702 floor compliction.pdf4 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 7BS.pdf3 Jul 2024
Details of encumbrancesFile: NO ENC 7BS.pdf15 May 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate 6.pdf15 May 2024
Declaration in FORM BFile: 7BS FOEM B RDN SIR.pdf15 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 7BS.pdf15 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: order no 39- HDN Sir.pdf15 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: order no 39-RDN sir.pdf15 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank account details 7BS.pdf15 May 2024
Building plan approvalFile: Sanction Plan no 1 5.pdf14 May 2024
Building plan approvalFile: Sanction Plan no 2 8.pdf14 May 2024
Building plan approvalFile: Sanction Plan no 3 7.pdf14 May 2024
Building plan approvalFile: Sanction Plan no 4 7.pdf14 May 2024
Building plan approvalFile: Sanction Plan no 5 7.pdf14 May 2024
Building plan approvalFile: Sanction Plan no 6 7.pdf14 May 2024
Building plan approvalFile: Sanction Plan no 7 7.pdf14 May 2024
Building plan approvalFile: Sanction Plan no 8 7.pdf14 May 2024

How this compares with Pune

97%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 48 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep 7 BUSINESS SQUARE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SHIVAJINAGAR13,700+ in Pune

2 km7 BUSINESS SQUARECompleted 116Lapsed / revoked 117Other 35Dot size: filed unitsN

Filed coordinates, straight-line distance. 268 registered projects within 2 km.

Builder: NAIKNAVARE BUILDCON PVT LTD

NAIKNAVARE BUILDCON PVT LTD has 8 registrations on MahaRERA, including NEELAYA and NAIKNAVARE KUTUMB PRIME. Its filings disclose 4 earlier MahaRERA projects: declares 3 of 4 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if 7 BUSINESS SQUARE is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of 7 BUSINESS SQUARE?

The registered promoter entity is NAIKNAVARE BUILDCON PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in 7 BUSINESS SQUARE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for 7 BUSINESS SQUARE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at 7 BUSINESS SQUARE?

The professionals named in the filing: Architect: GAURI NAIKNAVARE; Architect: KRUPALI KADAM; Engineer: SUNIL MULIK; Engineer: DEVIDAS YANKULE; Chartered Accountant: SHRISHIMAL AND ASSOCIATES; Chartered Accountant: NAHAR JAIN AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in 7 BUSINESS SQUARE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About 7 BUSINESS SQUARE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save 7 BUSINESS SQUARE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.