ReraGenieLog inGet a buyer report

Home / Browse projects / Nashik, Maharashtra / 67 Greens

Registration lapsed No litigation declared Others project

67 Greens

By Greenlife Developers

RG-MH-14088 · RERA P51600030671 · Last updated on MahaRERA portal: 18 Mar 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
22 of 22Construction stages doneacross 2 buildings; every applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 100 documents Report an error

67 Greens is a Others project by Greenlife Developers in Nashik, Maharashtra, registered with MahaRERA as P51600030671 on 8 Sep 2021. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • Name67 Greens
  • TypeOthers
  • Location
    • Indira Nagar-DGP Nagar Link Road
    • Wadala Gaon
    • Nashik (M Corp.)
    • Nashik
    • 422006
  • Pincode422006
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600030671
  • ReraGenie IDRG-MH-14088

Builder

  • NameGreenlife Developers
  • Entity typePartnership
  • PartnerNitin Prabhakar Natu
  • Other registrations1 more →
  • Completed1 of 2
  • No longer live1 lapsed, de-registered or revoked

Key dates

10 months past promisethis monthRegisteredSep 2021First promiseDec 2024Revised toDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on8 Sep 2021
  • Promised completion31 Dec 2025
  • Revised completionRevised to 31 Dec 2025 (originally 31 Dec 2024)
  • Buildings2 building records
  • Documents filed100 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building ANA70000
Building BNA70000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 18 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

22 of 22 construction stages are filed complete across 2 buildings.

Building A100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building B100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 18 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed49

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots49
Closed/Covered15
Open Space34
BuildingClosed/CoveredOpen SpaceTotal
Building A62127
Building B91322

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,582 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI3583.94
Proposed, not sanctioned3,584 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop 9 Sujojit Arcade Nasik-Pune Highway, Bodhle Nagar, Nasik-6

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRavi Amrutkar & Associates
EngineerSuhas Pandurang Natu
Chartered AccountantGSN & Company
PartnerRole in project
Greenlife Developers-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51600027182Dec 2024 → Dec 2025

Reason as filed by the promoterThe site work of all the buildings is done. The only work pending is of receiving the completion certificate from municipal corporation for which the application is already been done.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Aug 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Aug 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Mar 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed100

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 100 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q1 FY 2023-24.pdf18 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q2 FY 2023-24.pdf18 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q3 FY 2023-24.pdf18 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q4 FY 2023-24.pdf18 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q1 FY 2024-25.pdf18 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q2 FY 2024-25.pdf18 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q3 FY 2024-25.pdf18 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q1 FY 2023-24.pdf18 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q2 FY 2023-24.pdf18 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q3 FY 2023-24.pdf18 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q4 FY 2023-24.pdf18 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q1 FY 2024-25.pdf18 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q2 FY 2024-25.pdf18 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q3 FY 2024-25.pdf18 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q3 FY 2024-25.pdf18 Mar 2025
Building plan approvalFile: Approved Plan 2024 Sheet 1.pdf5 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q2 FY 2023-24, 67 Greens.pdf5 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q3 FY 2023-24, 67 Greens.pdf5 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q4 FY 2023-24, 67 Greens.pdf5 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q1 FY 2024-25, 67 Greens.pdf5 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q2 FY 2024-25, 67 Greens.pdf5 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q3 FY 2024-25, 67 Greens.pdf5 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q1 FY 2023-24, 67 Greens.pdf5 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q3 FY 2024-25.pdf5 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q2 FY 2024-25.pdf5 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q1 FY 2024-25.pdf5 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: Approved Plan 2024 Sheet 1.pdf5 Mar 2025
Disclosure of sold/ booked inventoryFile: Q1 FY 2023-24.pdf5 Mar 2025
Disclosure of sold/ booked inventoryFile: Q2 FY 2023-24.pdf5 Mar 2025
Disclosure of sold/ booked inventoryFile: Q3 FY 2023-24.pdf5 Mar 2025
Disclosure of sold/ booked inventoryFile: Q4 FY 2023-24.pdf5 Mar 2025
Disclosure of sold/ booked inventoryFile: Q1 FY 2024-25.pdf5 Mar 2025
Disclosure of sold/ booked inventoryFile: Q2 FY 2024-25.pdf5 Mar 2025
Disclosure of sold/ booked inventoryFile: Q3 FY 2024-25.pdf5 Mar 2025
Declaration in FORM BFile: Form B 2025.pdf25 Feb 2025
Disclosure of sold/ booked inventoryFile: Q1 2023-24.pdf25 Feb 2025
Disclosure of sold/ booked inventoryFile: Q1 2024-25.pdf25 Feb 2025
Disclosure of sold/ booked inventoryFile: Q4 2023-24.pdf25 Feb 2025
Disclosure of sold/ booked inventoryFile: Q3 2023-24.pdf25 Feb 2025
Disclosure of sold/ booked inventoryFile: Q2 2023-24.pdf25 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A FY 2023-24.pdf25 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A FY 2022-23.pdf18 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q2 FY 2024-25.pdf17 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q1 FY 2024-25.pdf17 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q2 FY 2024-25.pdf17 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q1 FY 2024-25.pdf17 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q4 FY 2023-24.pdf17 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q3 FY 2023-24, 67 Greens.pdf17 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q2 FY 2023-24.pdf17 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q1 FY 2023-24, 67 Greens.pdf17 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q2 FY 2023-24, 67 Greens.pdf17 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q3 FY 2023-24, 67 Greens.pdf17 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q4 FY 2023-24, 67 Greens.pdf17 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q1 FY 2024-25, 67 Greens.pdf17 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q2 FY 2024-25, 67 Greens.pdf17 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q4 2023-24.pdf17 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q3 FY 2023-24.pdf17 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q2 FY 2023-24.pdf17 Feb 2025
Building plan approvalFile: Approved Plan 2024 Sheet 1.pdf13 Feb 2025
Declaration in FORM BFile: Form B 2025.pdf13 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate 24.pdf13 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: Approved Plan 2024 Sheet 1.pdf13 Feb 2025
Disclosure of sold/ booked inventoryFile: Q3 FY 24-25.pdf13 Feb 2025
Disclosure of sold/ booked inventoryFile: Q2 FY 24-45.pdf13 Feb 2025
Disclosure of sold/ booked inventoryFile: Q1 FY 24-25.pdf13 Feb 2025
Disclosure of sold/ booked inventoryFile: Q4 FY 23-24.pdf13 Feb 2025
Disclosure of sold/ booked inventoryFile: Q3 FY 23-24.pdf13 Feb 2025
Disclosure of sold/ booked inventoryFile: Q2 FY 23-24.pdf13 Feb 2025
Disclosure of sold/ booked inventoryFile: Q1 FY 23-24.pdf13 Feb 2025
Declaration about Commencement CertificateFile: Format D.pdf13 Feb 2025
Other - TechnicalFile: Form E.pdf13 Feb 2025
Other - TechnicalFile: CONSENT LIST OF MEMBERS 67 GREEN WADALA.pdf13 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects' Certificate RERA.pdf30 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA's Certificate RERA.pdf30 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers' Certificate RERA.pdf30 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 67 Greens' FROM 5 FY 23-24.pdf26 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5.pdf1 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate Latest.pdf28 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate latest.pdf28 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Architects Certificate Latest-compressed.pdf28 Mar 2024

How this compares with Nashik

10%of Nashik projects moved their completion datethis one moved by 12 months
19%of Nashik registrations have lapsed or been cancelledthis one is among them

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep 67 Greens on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Wadala Gaon4,100+ in Nashik

2 km67 GreensCompleted 118Lapsed / revoked 30Other 58Dot size: filed unitsN

Filed coordinates, straight-line distance. 206 registered projects within 2 km.

Builder: Greenlife Developers

Greenlife Developers has 2 registrations on MahaRERA, including Green Residency and 67 Greens. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What does it mean that 67 Greens shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if 67 Greens is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of 67 Greens?

The registered promoter entity is Greenlife Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in 67 Greens?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for 67 Greens?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at 67 Greens?

The professionals named in the filing: Architect: Ravi Amrutkar & Associates; Engineer: Suhas Pandurang Natu; Chartered Accountant: GSN & Company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in 67 Greens?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About 67 Greens. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save 67 Greens to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.