Home / Browse projects / Pune, Maharashtra / 24Liife Prospeeria

Registered No litigation declared Mixed project

24Liife Prospeeria

By 24Liife Infraa Private Limited

RG-MH-69026 · RERA PM1260002600527 · Last updated on MahaRERA portal: 16 Apr 2026

Source: official MahaRERA filing

Red flags

  • Allotment letter deviates from the model form

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Oct 2031Possession promisedno revision filed
0 of 10Construction stages donefurthest along: Excavation, 0%
126 of 126Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 12 documents Report an error

24Liife Prospeeria is a Mixed project by 24Liife Infraa Private Limited in Pune, Maharashtra, registered with MahaRERA as PM1260002600527 on 25 May 2026. Possession is promised by 31 Oct 2031. 0 of the 126 units on this registration are recorded sold or booked, and 0 of 10 construction stages are filed complete.

At a glance

Project

  • Name24Liife Prospeeria
  • TypeMixed
  • Location
    • Moshi Alandi Road
    • Dudulgaon
    • Haveli
    • Pune
    • 412105
  • Pincode412105
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PM1260002600527
  • ReraGenie IDRG-MH-69026

Builder

  • Name24Liife Infraa Private Limited
  • Entity typeCompany
  • CINU68100PN2022PTC214725
  • GSTIN27AACCZ0584D1ZC
  • DirectorsKaustubh Sukhdev Talekar, Kiran Kaustubh Talekar

Key dates

this monthRegisteredMay 2026PromisedOct 2031

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on25 May 2026
  • Promised completion31 Oct 2031
  • Revised completionNone
  • Buildings1 building record
  • Documents filed12 files

Current status

0%0 of 126 units booked

Figures as on 16 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
24Liife ProspeeriaNA16149432126

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 16 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 10 construction stages are filed complete. The stage furthest along is Excavation, at 0%.

24Liife Prospeeria: 0% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 16 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNo0%
Landscaping & Tree PlantingNo0%
Street LightingNo0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNo0%
Energy managemcntNo0%
Fire protection and fire safety requirementsNo0%
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNo0%
Open ParkingNo0%

Parking filed162

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots162
Stilt / Ground82
Basement80

Land and ownership8

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area6,043 sq m
Land owned byNot the promoter
Named landowners8
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on23 Apr 2026
LandownerVillageDistrict
Ganesh Vitthal TalekarDudulgaonPune
Vinayak Hanumant TalekarDudulgaonPune
Vikas Hanumant TalekarDudulgaonPune
Balasaheb Kisan TalekarDudulgaonPune
Ramesh Kisan TalekarDudulgaonPune
Yamunabai Kisan TalekarDudulgaonPune
Santosh Shivram TalekarDudulgaonPune
Rajendra Shivram TalekarDudulgaonPune

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI10526.87
Proposed, not sanctioned10,331 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPLOT NO 1, SECTOR 27APRADHIKARANNIGDIPUNEMAHARASHTRA411044

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectLandmark Desgin Group Usha Rangrajan
EngineerSpectrum Consultants Parag Chopda
Chartered AccountantAvishkar Phanse
PartnerRole in project
24Liife Infraa Private Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Mar 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Mar 2026
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Oct 2031

Documents filed12

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Declaration and undertaking (Annexure A)File: Annexure A.pdf16 Apr 2026
Layout approvalFile: Plan 1 Highlighted.pdf30 Mar 2026
Building plan approvalFile: Plan 2.pdf30 Mar 2026
Building plan approvalFile: Plan 3.pdf30 Mar 2026
Building plan approvalFile: Plan 4.pdf30 Mar 2026
Building plan approvalFile: Plan 5.pdf30 Mar 2026
Building plan approvalFile: Plan 6.pdf30 Mar 2026
Building plan approvalFile: Plan 7.pdf30 Mar 2026
Building plan approvalFile: Plan 8.pdf30 Mar 2026
Building plan approvalFile: Plan 9.pdf30 Mar 2026
Building plan approvalFile: Plan 10.pdf30 Mar 2026
Building plan approvalFile: Plan 11.pdf30 Mar 2026

How this compares with Pune

0%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep 24Liife Prospeeria on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dudulgaon13,700+ in Pune

2 km24Liife ProspeeriaCompleted 44Lapsed / revoked 21Other 59Dot size: filed unitsN

Filed coordinates, straight-line distance. 124 registered projects within 2 km.

Builder: 24Liife Infraa Private Limited

24Liife Infraa Private Limited has 1 registration on MahaRERA, including 24Liife Prospeeria. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if 24Liife Prospeeria is delayed beyond 31 Oct 2031?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of 24Liife Prospeeria?

The registered promoter entity is 24Liife Infraa Private Limited, a company as per the filing. Its CIN U68100PN2022PTC214725 and GSTIN 27AACCZ0584D1ZC can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in 24Liife Prospeeria?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for 24Liife Prospeeria?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at 24Liife Prospeeria?

The professionals named in the filing: Architect: Landmark Desgin Group Usha Rangrajan; Engineer: Spectrum Consultants Parag Chopda; Chartered Accountant: Avishkar Phanse. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in 24Liife Prospeeria?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About 24Liife Prospeeria. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save 24Liife Prospeeria to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.