ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / 24Life Bliss

Registered No litigation declared Others project

24Life Bliss

By Blusky Realty LLP

RG-MH-35829 · RERA P52100054878 · Last updated on MahaRERA portal: 1 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 4 months
  • 1 extension taken
  • Rs 15.00 crore secured on the land, in favour of SMFG INDIA HOME FINANCE COMPANY LIMITED

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Nov 2027Possession promisedmoved 4 months from the original
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 90%
54 of 154Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 123 documents Report an error

24Life Bliss is a Others project by Blusky Realty LLP in Pune, Maharashtra, registered with MahaRERA as P52100054878 on 15 Feb 2024. Possession is promised by 30 Nov 2027. The completion date has moved by 4 months from the original filing. 100 of the 154 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • Name24Life Bliss
  • TypeOthers
  • Location
    • -
    • DUDULGAON
    • Pimpri Chinchawad (M Corp.)
    • Haveli
    • Pune
    • 412105
  • Pincode412105
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100054878
  • ReraGenie IDRG-MH-35829

Builder

  • NameBlusky Realty LLP
  • Entity typePartnership
  • GSTIN27AAYFB4286H1ZT
  • PartnersKaustubh Sukhadev Talekar, Vijay Nivrutti Raskar

Key dates

this monthRegisteredFeb 2024First promiseJul 2027Revised toNov 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Feb 2024
  • Promised completion30 Nov 2027
  • Revised completionRevised to 30 Nov 2027 (originally 31 Jul 2027)
  • Buildings1 building record
  • Documents filed123 files

Current status

65%100 of 154 units booked
70.7%Work done, per cost certificate

Figures as on 1 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
24Life BlissNA191812430154

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 1 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 90%.

24Life Bliss: 59% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.20%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 1 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Land and ownership8

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area2,892 sq m
Land owned byThe promoter, with other names on the file
Named landowners8
Encumbrance on the landDeclared present
Charge in favour ofSMFG INDIA HOME FINANCE COMPANY LIMITED
Secured amountRs 15.00 crore
CERSAI search filedYes
Declared on8 Jul 2026
LandownerVillageDistrict
Nirmala Suresh BhagwatPimpale GuravPune
Vaishali Navnath GaikwadBhosariPune
Swati Anil BajarePimpri Chinchawad (M Corp.)Pune
Hanumanth Laxman TalekarPimpri Chinchawad (M Corp.)Pune
Vimal Hanumanth TalekarPimpri Chinchawad (M Corp.)Pune
Sagar Hanumanth TalekarPimpri Chinchawad (M Corp.)Pune
Dinesh Madhukar SabalePimpale GuravPune
Dnyaneshwari Dinesh SabalePimpale GuravPune

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI12828.17
Proposed, not sanctioned12,828 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPlot No 1, Nigdi Sector 27 A Pune 411044
Estimated costRs 31.60 cr
Cost incurredRs 22.35 cr
Work done70.73%
BuildingWingEstimatedIncurred
24Life BlissNARs 30.00 crRs 22.35 cr
-NARs 1.60 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectLandmark Desgin Group
EngineerMahadeo Shelar
Chartered AccountantSnehal G Patil & Co
Chartered AccountantAvishkar Phanse
Chartered AccountantV S A P & Company
PartnerRole in project
Blusky Realty LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

P52100054878/WarJul 2027 → Nov 2027

Reason as filed by the promoterNA

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Jan 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Jan 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Dec 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Nov 2027

Documents filed123

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 123 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2024-2025)File: Form 2A - FY 24-25 Bliss.pdf1 Aug 2026
Form 2A (FY 2023-2024)File: Form 2A - FY 23-24 Bliss.pdf1 Aug 2026
Form 2A (FY 2025-2026)File: Form 2A - FY 25-26 Bliss.pdf1 Aug 2026
Withdrawal Update Form 1File: Form 1 Q1 - 24Life Bliss.pdf28 Jul 2026
Withdrawal Update Form 2File: Form 2 Q1 - 24Life Bliss.pdf28 Jul 2026
Withdrawal Update Form 3File: Form 3 Q1 - 24Life Bliss.pdf28 Jul 2026
Form 1File: Form 1 FY 23-24 Q4 Bliss.pdf8 Jul 2026
Form 2File: Form 2 FY 23-24 Q4 Bliss.pdf8 Jul 2026
Form 3File: Form 3 FY 23-24 Q4 Bliss.pdf8 Jul 2026
Disclosure of Sold and Booked InventoryFile: Promoters disclosure Q4 Bliss.pdf8 Jul 2026
Form 1File: Form 1 FY 24-25 Q1 Bliss.pdf8 Jul 2026
Form 2File: Form 2 FY 24-25 Q1 Bliss.pdf8 Jul 2026
Form 3File: Form 3 FY 24-25 Q1 Bliss.pdf8 Jul 2026
Disclosure of Sold and Booked InventoryFile: Promoter Disclosure Q1.pdf8 Jul 2026
Form 1File: Form 1 FY 24-25 Q2 Bliss.pdf8 Jul 2026
Form 2File: Form 2 FY 24-25 Q2 Bliss.pdf8 Jul 2026
Form 3File: Form 3 FY 24-25 Q2 Bliss.pdf8 Jul 2026
Disclosure of Sold and Booked InventoryFile: Promoter Disclosure Q2.pdf8 Jul 2026
Form 1File: Form 1 FY 24-25 Q3 Bliss.pdf8 Jul 2026
Form 2File: Form 2 FY 24-25 Q3 Bliss.pdf8 Jul 2026
Form 3File: Form 3 FY 24-25 Q3 Bliss.pdf8 Jul 2026
Disclosure of Sold and Booked InventoryFile: Promoter Disclosure Q3.pdf8 Jul 2026
Form 1File: Form 1 FY 24-25 Q4 Bliss.pdf8 Jul 2026
Form 2File: Form 2 FY 24-25 Q4 Bliss.pdf8 Jul 2026
Form 3File: Form 3 FY 24-25 Q4 Bliss.pdf8 Jul 2026
Disclosure of Sold and Booked InventoryFile: Promoter Disclosure Q4.pdf8 Jul 2026
Withdrawal Update Form 1File: Form 1 Bliss Q1.pdf8 Jul 2026
Withdrawal Update Form 1File: Form 1 Bliss Q2.pdf8 Jul 2026
Withdrawal Update Form 1File: Form 1 Q3 - Bliss.pdf8 Jul 2026
Withdrawal Update Form 1File: Form 1 Q4 - 24Life Bliss.pdf8 Jul 2026
Withdrawal Update Form 2File: Form 2 Bliss Q1.pdf8 Jul 2026
Withdrawal Update Form 2File: Form 2 Bliss Q2.pdf8 Jul 2026
Withdrawal Update Form 2File: Form 2 Q3 - Bliss.pdf8 Jul 2026
Withdrawal Update Form 2File: Form 2 Q4 - 24Life Bliss.pdf8 Jul 2026
Withdrawal Update Form 3File: Form 3 Bliss Q1.pdf8 Jul 2026
Withdrawal Update Form 3File: Form 3 Bliss Q2.pdf8 Jul 2026
Withdrawal Update Form 3File: Form 3 Q3 - Bliss.pdf8 Jul 2026
Withdrawal Update Form 3File: Form 3 Q4 - 24Life Bliss.pdf8 Jul 2026
Form 5 (FY 2023-2024)File: Form 5 - 24Life Bliss - FY 2023-24.pdf8 Jul 2026
Form 5 (FY 2024-2025)File: Form 5 - 24Life Bliss - FY 2024-25.pdf8 Jul 2026
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Form 3 Revised Q4 Bliss.pdf8 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Form 3 Q3 - Bliss.pdf8 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 FY 24-25 Q4 Bliss.pdf28 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 FY24-25 Q4 Bliss.pdf27 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Form 3 (Bliss) Q4 FY 24-25.pdf27 Apr 2025
Disclosure of sold/ booked inventoryFile: Promoter Disclosure Bliss Q4.pdf27 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q3 24-25 Bliss.pdf8 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q3 24-25 Bliss.pdf8 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q3 24-25 Bliss.pdf8 Feb 2025
Disclosure of sold/ booked inventoryFile: Promoter Disclouser Q3.pdf8 Feb 2025
Building plan approvalFile: 1.pdf19 Dec 2024
Building plan approvalFile: 2.pdf19 Dec 2024
Building plan approvalFile: 3.pdf19 Dec 2024
Building plan approvalFile: 4.pdf19 Dec 2024
Building plan approvalFile: 5.pdf19 Dec 2024
Building plan approvalFile: 6.pdf19 Dec 2024
Building plan approvalFile: 7.pdf19 Dec 2024
Building plan approvalFile: 8.pdf19 Dec 2024
Building plan approvalFile: 9.pdf19 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: Bliss Revised CC.pdf19 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: 4.pdf19 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: 9.pdf19 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: 8.pdf19 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: 7.pdf19 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: 6.pdf19 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: 5.pdf19 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: 3.pdf19 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: 2.pdf19 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: 1.pdf19 Dec 2024
Declaration about Commencement CertificateFile: Revised Declaration About CC.pdf19 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Bliss Form 5 23-24.pdf21 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Bliss Form 5 23-24.pdf21 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A FY23-24 Bliss.pdf15 Nov 2024
CERSAI detailsFile: Bliss Cersai.pdf8 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q2 24-25 Bliss.pdf5 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q2 24-25 Bliss.pdf5 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q2 24-25 Bliss.pdf5 Nov 2024
Disclosure of sold/ booked inventoryFile: Promotor Disclosure.pdf5 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 FY 2024-25 Q1 24Life Bliss.pdf17 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect Certificate.pdf7 Oct 2024

How this compares with Pune

65%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 4 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep 24Life Bliss on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DUDULGAON13,700+ in Pune

2 km24Life BlissCompleted 47Lapsed / revoked 21Other 64Dot size: filed unitsN

Filed coordinates, straight-line distance. 132 registered projects within 2 km.

Builder: Blusky Realty LLP

Blusky Realty LLP has 1 registration on MahaRERA, including 24Life Bliss. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if 24Life Bliss is delayed beyond 30 Nov 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of 24Life Bliss?

The registered promoter entity is Blusky Realty LLP, a partnership as per the filing. Its GSTIN 27AAYFB4286H1ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in 24Life Bliss?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for 24Life Bliss?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at 24Life Bliss?

The professionals named in the filing: Architect: Landmark Desgin Group; Engineer: Mahadeo Shelar; Chartered Accountant: Snehal G Patil & Co; Chartered Accountant: Avishkar Phanse; Chartered Accountant: V S A P & Company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in 24Life Bliss?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About 24Life Bliss. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save 24Life Bliss to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.