14 MILE INDUSTRIAL AND LOGISTIC PARK
RG-MH-92506 · RERA P50500047523 · Last updated on MahaRERA portal: 12 May 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 26 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
14 MILE INDUSTRIAL AND LOGISTIC PARK is a Plotted project by TRUE VALUE LAND DEVELOPERS in Nagpur, Maharashtra, registered with MahaRERA as P50500047523 on 7 Nov 2022. Possession was promised by 15 Aug 2024 and is now 26 months past that date. 17 of the 22 units on this registration are recorded sold or booked.
At a glance
Project
- Name14 MILE INDUSTRIAL AND LOGISTIC PARK
- TypePlotted
- Location
- KH. NO 22 P. H. NO 23
- MOUZA 81
- Chinchbhwan
- Kalameshwar
- Nagpur
- 441501
- Pincode441501
- RERA no.P50500047523
- ReraGenie IDRG-MH-92506
Builder
- NameTRUE VALUE LAND DEVELOPERS
- Entity typePartnership
- PartnerNITIN MAHESH KOTHARI
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on7 Nov 2022
- Promised completion15 Aug 2024
- Revised completionNone
- BuildingsNot stated in filing
- Documents filed84 files
Current status
Figures as on 12 May 2025, this project's latest MahaRERA filing.
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 12 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
NA Plot Without Structure:
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Progress on shared amenities15
As on 12 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 90% |
| Water Supply | Yes | 97% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 85% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 98% |
| Fire protection and fire safety requirements | Yes | 95% |
| Electrical meter room, sub-station, receiving station | Yes | 95% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Pratham Pincha |
| Engineer | Patankar Consultants Pvt Ltd |
| Engineer | Sachin Manoj Jaiswal |
| Chartered Accountant | MJM Associates |
| Chartered Accountant | Kochar mehta and Co LLP |
| Partner | Role in project |
|---|---|
| TRUE VALUE LAND DEVELOPERS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 14 Oct 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 14 Oct 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 14 Oct 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 14 Oct 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed84
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 84 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 12 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 oct - dec 24.pdf | 7 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Jan - Mar 25.pdf | 7 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 7 May 2025 |
| Disclosure of sold/ booked inventoryFile: DSBI.pdf | 7 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 7 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: DSBI.pdf | 7 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf | 4 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 JAN TO MAR 24.pdf | 20 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 from April - June'24.pdf | 20 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 From July -Sept'24.pdf | 20 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A.pdf | 20 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 21 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 from April - June'24.pdf | 21 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 From July -Sept'24.pdf | 21 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Inventory from April - June 2024.pdf | 21 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Inventory from July - Sept 2024.pdf | 21 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 From April - June'24.pdf | 21 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 From July - Sept'24.pdf | 21 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 21 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 from April - June'24.pdf | 21 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 From July -Sept'24.pdf | 21 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 From April - June'24.pdf | 21 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 From July - Sept'24.pdf | 21 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Inventory from April - June 2024.pdf | 21 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Inventory from July - Sept 2024.pdf | 21 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: DSBI.pdf | 29 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Jan-Mar 24.pdf | 2 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Declaration 31-12-22.pdf | 13 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Declaration 31-03-23.pdf | 13 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Declaration 30-06-23.pdf | 13 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Declaration 30-09-23.pdf | 13 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 13 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate.pdf | 13 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Declaration 31-03-23.pdf | 13 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Declaration 30-06-23.pdf | 13 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Declaration 30-09-23.pdf | 13 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Declaration 31-12-23.pdf | 13 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: DSBI_31_03_23.pdf | 13 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: DSBI_31_12_22.pdf | 13 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: DSBI_31_03_23.pdf | 13 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: DSBI_30_06_23.pdf | 13 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: DSBI_30_09_23.pdf | 13 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: DSBI_31_12_23.pdf | 13 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Site Supervisor Certificate.pdf | 8 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 31 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Decl Jan- Mar 23.pdf | 31 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Decl _April-Jun 23.pdf | 31 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Decl July to Sept.pdf | 31 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Decl Oct to Dec 23.pdf | 31 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Decl Jan- Mar 23.pdf | 31 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Decl _April-Jun 23.pdf | 31 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Decl July to Sept.pdf | 31 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Decl Oct to Dec 23.pdf | 31 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: DSBI 31-12-22.pdf | 31 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: DSBI 31-3-23.pdf | 31 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: DSBI 30-6-23.pdf | 31 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: DSBI 30-9-23.pdf | 31 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: DSBI 30-12-23.pdf | 31 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Declaration Jan to Mar.pdf | 31 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Decl Aprilt to Jun.pdf | 31 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Decl Jul to Sept.pdf | 31 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Decl oct to Dec 23.pdf | 31 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Revised New.pdf | 28 Oct 2022 |
| Deviation Report with respect to model copy of AgreementFile: 1 Deviation Report with respect to model copy of Agreement.pdf | 27 Oct 2022 |
| Proforma of Agreement for saleFile: Model form of Agreement to Sale _Maharera_Plot.pdf | 21 Oct 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: ilovepdf_merged (1).pdf | 18 Oct 2022 |
| Layout approvalFile: Lay Out Map_landscape.pdf | 14 Oct 2022 |
| Building plan approval or NA orderFile: NMRDA Letter.pdf | 14 Oct 2022 |
| Building plan approval or NA orderFile: Lay Out Map.pdf | 14 Oct 2022 |
| PAN CardFile: PAN -True Value Land Develpoers.pdf | 14 Oct 2022 |
| Copy of the legal title reportFile: Legal Title Report - Compressed.pdf | 14 Oct 2022 |
| Details of encumbrances concerned to FinanceFile: No Financial Encumbrance Certificate.pdf | 14 Oct 2022 |
| Details of encumbrances concerned to LegalFile: Legal No Encumrances Declaration.pdf | 14 Oct 2022 |
| Copy of Layout Approval (in case of layout)File: Lay Out Map_landscape.pdf | 14 Oct 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: NMRDA Letter.pdf | 14 Oct 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Lay Out Map.pdf | 14 Oct 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: NMRDA Letter.pdf | 14 Oct 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Lay Out Map_landscape.pdf | 14 Oct 2022 |
| Declaration about Commencement CertificateFile: Rera Declaration.pdf | 14 Oct 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- All 84 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep 14 MILE INDUSTRIAL AND LOGISTIC PARK on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near MOUZA 812,800+ in Nagpur
MAYA NAGARI PARK-1
PRAVIN WAMANRAO BHOYAR
DERA GREENS 3
NARAYAN CHANDIRAM DEMBLE
MADHAV NAGARI- 3
MIDAS PROPERTIES
NIRALA GREEN WOODS
Nirala Buildtech Private Limited
DERA GREENS 2
VIJAY KIMATRAI HUF
Nisarg Vihar
CRUSH-N-CUT STONES PRIVATE LIMITED
See every Nagpur project, with the district possession charts
Builder: TRUE VALUE LAND DEVELOPERS
TRUE VALUE LAND DEVELOPERS has 1 registration on MahaRERA, including 14 MILE INDUSTRIAL AND LOGISTIC PARK. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What does it mean that 14 MILE INDUSTRIAL AND LOGISTIC PARK shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if 14 MILE INDUSTRIAL AND LOGISTIC PARK is delayed beyond 15 Aug 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of 14 MILE INDUSTRIAL AND LOGISTIC PARK?
The registered promoter entity is TRUE VALUE LAND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in 14 MILE INDUSTRIAL AND LOGISTIC PARK?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for 14 MILE INDUSTRIAL AND LOGISTIC PARK?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at 14 MILE INDUSTRIAL AND LOGISTIC PARK?
The professionals named in the filing: Architect: Pratham Pincha; Engineer: Patankar Consultants Pvt Ltd; Engineer: Sachin Manoj Jaiswal; Chartered Accountant: MJM Associates; Chartered Accountant: Kochar mehta and Co LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in 14 MILE INDUSTRIAL AND LOGISTIC PARK?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback