Home / Browse projects / Bengaluru Urban, Karnataka / Zest at Godrej Eternity

Registration approved Residential/Group Housing project

Zest at Godrej Eternity

By Godrej Home Constructions Private Limited

RG-KA-13544 · RERA PRM/KA/RERA/1251/310/PR/171102/002197

Source: official RERA Karnataka filing

Red flags

  • 4 complaints at RERA Karnataka
  • Completion date moved by 21 months
  • 2 extensions taken

Clear

  • Separate project account declared
Jul 2024Possession promisedmoved 21 months from the original
4Complaints at RERA Karnatakaon this registration
Jump to the 68 documents Report an error

Zest at Godrej Eternity is a Residential/Group Housing project by Godrej Home Constructions Private Limited in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/171102/002197 on 2 Nov 2017. Possession is promised by 6 Jul 2024. The completion date has moved by 21 months from the original filing. 4 complaints are on record with the regulator.

At a glance

Project

  • NameZest at Godrej Eternity
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/310/PR/171102/002197
  • ReraGenie IDRG-KA-13544

Builder

  • NameGodrej Home Constructions Private Limited
  • Entity typeCompany
  • CINU70102MH2015PTC263486
  • Authorized SignatoryUday Bhaskar
  • DirectorsRajendra Khetawat, Karan Bolaria
  • Other registrations2 more →

Key dates

this monthRegisteredNov 2017First promiseOct 2022Revised toJul 2024

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on2 Nov 2017
  • Promised completion6 Jul 2024
  • Revised completionRevised to 6 Jul 2024 (originally 6 Oct 2022)
  • Buildings4 building records
  • Documents filed68 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A---52052
B---72072
O---40040
P---16016

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)Not applicable
Ground Clearance-
Earth Excavation-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Painting-
Elevation workNot applicable
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities42

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalNoNot applicable
Water conservationNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes-
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsYes-
Use of renewable energyYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallYes-
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupNoNot applicable
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-
Water Tanks, Sumps And Other Electrical EquipmentYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area13,746 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 86.81 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRamesh Kumar M.B.
EngineerDesignTree Service Consultants Pvt Ltd

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionOct 2022 → Jul 2023

No reason recorded in the filing

EX/PRM/KA/RERA/1251/310/PR/230830/002197Jul 2023 → Jul 2024

Reason as filed by the promoterothers

Complaints filed with RERA Karnataka4

Case no.ComplainantRespondentFiled
CMP/220615/0009633-Godrej Home Constructions Private Limited15/06/2022
01456/2023-Godrej Home Constructions Private Limited20/09/2023
01460/2023-Godrej Home Constructions Private Limited20/09/2023
01630/2023-Godrej Home Constructions Private Limited30/10/2023

Documents filed68

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/171102/002197 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: Company Incorporation Certificate.pdf-
Architect Certificate for Work Completion Schedule till DateFile: Architect certificate-Zest-Status of work-Proj Extn.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Engineers certificate - zest - Status of work as on date - 10-Jul-23.pdf-
CA Certificate for Funds UtilizationFile: GODREJ ZEST FORM 3 - Fund utilised Certificate _compressed.pdf-
Architect Certificate for Pending Work Completion Schedule.File: Architect certificate-Zest-Pending Work .pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Engineers certificate - zest - Pending works as on date - 10-Jul-23.pdf-
CA Certificate for Funds required for Project CompletionFile: CA Certificate for Completion _compressed.pdf-
AffidavitFile: Affidavit Signed .pdf-
Latest Encumbrance CertificateFile: Updated EC-5th Mar 2023.pdf-
Details Of Sold/ Un-sold UnitsFile: Sold and Unsold Units .pdf-
Document 1File: Form B Signed .pdf-
Document 2File: OC ACK and Govt orders .pdf-
Document 3File: Letter from Panchayat to BBMP handing over Records .pdf-
Document 4File: Reminder Letter 1 .pdf-
Document 5File: Reminder Letter 2.pdf-
Document 6File: RERA ACK.pdf-
Document 7File: Letter seeking extension- RERA.pdf-
commencement_certificate from BMICAPA-
Eternity DP or Single site plan-
Eternity DP or Single site plan-
DEED OF SALE-
ATS-
Sale Deed-
Section-
site_plan-
Application FORM-Allotment Letter- Eternity-
Godrej-Eternity-Brochure-
Speci-
EC-
Khata ( Kanakpura)-
Sale Deed-
ETERNITY Conversion orders (1)-
BESCOM NOC-
BWSSB NOC-
KSPCB 11th April 2016-
EC MOEF NOC-
BSNL NOC-
Unnamed document-
Section-
Section-
Balance Sheet 2016 - 2017File: Blank Document.pdf-
Balance Sheet 2015 - 2016File: Balancesheet 2015.pdf-
Balance Sheet 2014 - 2015File: Blank Document.pdf-
Audited Profit and Loss Statement 2016 - 2017File: Blank Document.pdf-
Audited Profit and Loss Statement 2015 - 2016File: Profit Loss 2015.pdf-
Audited Profit and Loss Statement 2014 - 2015File: Blank Document.pdf-
Director's Report 2016 - 2017File: Blank Document.pdf-
Director's Report 2015 - 2016File: Blank Document.pdf-
Director's Report 2014 - 2015File: Blank Document.pdf-
Cash Flow Statement 2016 - 2017File: Blank Document.pdf-
Cash Flow Statement 2015 - 2016File: Cash Flow 2015.pdf-
Auditor's Report 2016 - 2017File: Blank Document.pdf-
Auditor's Report 2015 - 2016File: Audit Report 2015.pdf-
Auditor's Report 2014 - 2015File: Blank Document.pdf-
Income Tax Return Acknowledgement 2016 - 2017File: Blank Document.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: IT returns.pdf-
Income Tax Return Acknowledgement 2014 - 2015File: Blank Document.pdf-
Form-B-
Prospectus/BrochureFile: Godrej-Eternity-Brochure.pdf-
Tower Excel SheetFile: PRM_KA_RERA_1251_310_PR_171102_002197.xlsx-
Stability CertificateFile: Structural Stability Certificate.pdf-
Occupancy CertificateFile: OC ZEST.pdf-
Consent for operation issued by KSPCBFile: KSPCB CFO.pdf-
Sanctioned Letter issued by concerned ESCOM of Power sanction and details of transformer installed and whetherFile: BESCOM NOC.pdf-
Architect certificate for having completed the work(in format no 5)File: Form-5 Architect Closure Certificate.pdf-
Chartered Accountant certificate for having completed the work(in format no 4)File: Form-4 CC.pdf-
Affidavit cum declaration from promoter for having completed the project as per specification and as per adverFile: Closure Affidavit.pdf-
SEIAA-ECFile: SEIAA-EC.pdf-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 21 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Zest at Godrej Eternity on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmZest at Godrej EternityOther 36Dot size: filed unitsN

Filed coordinates, straight-line distance. 36 registered projects within 2 km.

Builder: Godrej Home Constructions Private Limited

Godrej Home Constructions Private Limited has 3 registrations on RERA Karnataka, including Godrej Eternity and Zest at Godrej Eternity. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Zest at Godrej Eternity is delayed beyond 6 Jul 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Zest at Godrej Eternity?

The registered promoter entity is Godrej Home Constructions Private Limited, a company as per the filing. Its CIN U70102MH2015PTC263486 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Zest at Godrej Eternity?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Zest at Godrej Eternity?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at Zest at Godrej Eternity?

The professionals named in the filing: Architect: Ramesh Kumar M.B.; Engineer: DesignTree Service Consultants Pvt Ltd. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Zest at Godrej Eternity?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Zest at Godrej Eternity. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Zest at Godrej Eternity to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.