Wing B of Composite Building No 1 Imperial Edge
By SD Corporation Private Limited
RG-MH-12095 · RERA P51900000723 · Last updated on MahaRERA portal: 20 Dec 2022
Source: official MahaRERA filing
Red flags
- 1 complaint at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: .Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Wing B of Composite Building No 1 Imperial Edge is a Residential / Group Housing project by SD Corporation Private Limited in Tardeo, 400034, registered with MahaRERA as P51900000723 on 23 Jul 2017. The registration is recorded completed; possession was promised by 30 Dec 2021. 1 complaint is on record with the regulator.
At a glance
Project
- NameWing B of Composite Building No 1 Imperial Edge
- TypeResidential / Group Housing
- Location
- B.B. Nakashe Marg
- Tardeo
- 400034
- Pincode400034
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51900000723
- ReraGenie IDRG-MH-12095
Builder
- NameSD Corporation Private Limited
- Entity typeCompany
- Other registrations3 more →
- Completed3 of 4
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on23 Jul 2017
- Promised completion30 Dec 2021
- Revised completionNone
- Buildings1 building record
- Documents filed94 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| The Imperial Edge | NA | 75 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 20 Dec 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 99%.
The Imperial Edge: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 99% |
| Sanitary Fittings within the flats / premises | 97% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 20 Dec 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 97% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 50% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed1
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Vision |
| Engineer | JW Consultants LLP |
| Chartered Accountant | Bhavesh Ramesh Nagda |
| Partner | Role in project |
|---|---|
| SD Corporation Private Limited | - |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000396552 | Malik Properties Limited | S.D. Corporation Pvt. Ltd | 05/07/2023 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 3 Mar 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 3 Mar 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 3 Mar 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 3 Mar 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 3 Nov 2020
Documents filed94
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 94 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Declaration of Mofa Dt 31st May 2022.pdf | 20 Dec 2022 |
| Disclosure of sold/ booked inventoryFile: Imperial Edge Inventory Disclosure December 2021.pdf | 27 Jan 2022 |
| Certificates of CA (Form 5)File: Imperial Edge.pdf | 23 Dec 2021 |
| Certificates of CA (Form 3)File: 202109 RERA Certificate Imperial Edge-RERA FInal.pdf | 7 Oct 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Imperial Edge.pdf | 6 Oct 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate Imperial Edge.pdf | 6 Oct 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Assurance Imperial Edge.pdf | 6 Oct 2021 |
| Disclosure of sold/ booked inventoryFile: Imperial Edge Inventory Sept 2021.pdf | 6 Oct 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate - Imperial Edge.pdf | 7 Sep 2021 |
| Certificates of CA (Form 3)File: Form 3 Imperialedge_compressed.pdf | 13 Aug 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Imperial Edge Engineer certificate.pdf | 10 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Imperial Edge Quality Assurance.pdf | 10 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Imperial Edge Quality Assurance.pdf | 10 Aug 2021 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory.pdf | 10 Aug 2021 |
| Disclosure of sold/ booked inventoryFile: Disclosure of inventory - Imperial Edge.pdf | 10 Aug 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: T4_RERA_architect_certificate.pdf | 16 Jun 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Imperial Edge T4 Engineer Certificate.pdf | 16 Jun 2021 |
| Certificates of CA (Form 3)File: CA certificate Imperial Edge_compressed.pdf | 16 Jun 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Imperial Edge Engineer Certificate .pdf | 18 May 2021 |
| Certificates of CA (Form 3)File: Imperial Edge Dec 20.pdf | 31 Mar 2021 |
| Proforma of Allotment letterFile: Imperial Edge - OC Final.pdf | 4 Dec 2020 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: CA Certificate Imperial Edge.pdf | 3 Dec 2020 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: CA Certificate Imperial Edge 1.pdf | 3 Dec 2020 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Imperial Edge.pdf | 3 Dec 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Imperial Edge compressed.pdf | 2 Dec 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate -Imperial Edge.pdf | 2 Dec 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Imperial Edge.pdf | 2 Dec 2020 |
| Certificates of CA (Form 3)File: CA Certificate - Imperial Edge June compressed.pdf | 2 Dec 2020 |
| Certificates of CA (Form 3)File: CA Certificate - Imperial Edge September compressed.pdf | 2 Dec 2020 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: The_Imperial_Edge_OC.pdf | 3 Nov 2020 |
| Certificates of CA (Form 5)File: Imperial Edge-min_compressed.pdf | 30 Sep 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate of T4.pdf | 16 Sep 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate - Imperial Edge.pdf | 16 Sep 2020 |
| Certificates of CA (Form 3)File: CA Certificate Imperial Edge.pdf | 16 Sep 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - Imperial Edge Final.pdf | 15 Sep 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate - Imperial T4 Final-compressed.pdf | 15 Sep 2020 |
| Certificates of CA (Form 3)File: CA Certificate Imperial Edge Final.pdf | 15 Sep 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - Imperial Edge -min.pdf | 5 Dec 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate -T4.pdf | 5 Dec 2019 |
| Certificates of CA (Form 3)File: IMPERIALEDGE.pdf | 27 Nov 2019 |
| Certificates of CA (Form 5)File: Imperial Edge.pdf | 30 Sep 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - T4-min.pdf | 26 Aug 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate -T4.pdf | 26 Aug 2019 |
| Certificates of CA (Form 3)File: CA Certificate Imperial Edge.pdf | 26 Aug 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - T4.pdf | 4 Mar 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - T4.pdf | 4 Mar 2019 |
| Certificates of CA (Form 3)File: CA Certificate - T4.pdf | 4 Mar 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - T4 -final.pdf | 5 Dec 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - T4 -final.pdf | 5 Dec 2018 |
| Certificates of CA (Form 3)File: CA Certificate Imperial Edge -final.pdf | 5 Dec 2018 |
| Certificates of CA (Form 5)File: Imperial Edge - Form 5 - CA Certificate.pdf | 30 Sep 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - T4 - Final.pdf | 13 Aug 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - T4 - Final.pdf | 13 Aug 2018 |
| Certificates of CA (Form 3)File: CA Certificate - T4 - Final.pdf | 13 Aug 2018 |
| Declaration in FORM BFile: Declaration - KKR - HDFC- Final.pdf | 1 Jun 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - T4.pdf | 28 May 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - T4 - 01.pdf | 28 May 2018 |
| Certificates of CA (Form 3)File: CA Certificate - T4.pdf | 28 May 2018 |
| Building plan approvalFile: Revised IOA - T4.pdf | 3 Mar 2018 |
| Layout approvalFile: Typical Floor Plan - T4.pdf | 3 Mar 2018 |
| Copy of the legal title reportFile: Fifth Supplemental Report on Title - MP Mill Compound1.pdf | 3 Mar 2018 |
| Copy of Layout Approval (in case of layout)File: Typical Floor Plan - T4.pdf | 3 Mar 2018 |
| Building Plan Approval (IOD)File: Revised IOA - T4.pdf | 3 Mar 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: Revised CC - T4.pdf | 3 Mar 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - T4 01.pdf | 26 Feb 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - T4.pdf | 26 Feb 2018 |
| Certificates of CA (Form 3)File: CA Certificate - T4 01.pdf | 26 Feb 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - T4.pdf | 5 Jan 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - T4.pdf | 5 Jan 2018 |
| Certificates of CA (Form 3)File: CA certificate T4.pdf | 5 Jan 2018 |
| Copy of the legal title reportFile: Fourth Supplemental Report on Title.pdf | 22 Aug 2017 |
| Layout approvalFile: Block Plan - Edge.PDF | 20 Jul 2017 |
| Layout approvalFile: Typical Floor Plan.pdf | 20 Jul 2017 |
| Layout approvalFile: Floor Plan - Edge.pdf | 20 Jul 2017 |
| Building plan approvalFile: IOA.pdf | 20 Jul 2017 |
| Building plan approvalFile: Further IOA Application.pdf | 20 Jul 2017 |
| PAN CardFile: Pan - S D Corporation.pdf | 20 Jul 2017 |
| Copy of the legal title reportFile: Title Report compress.pdf | 20 Jul 2017 |
| Details of encumbrancesFile: Encumbrance Details.pdf | 20 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Block Plan - Edge.PDF | 20 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 3 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 94 filed documents as one ZIP, foldered, with a manifest
Keep Wing B of Composite Building No 1 Imperial E on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Tardeo
Filed coordinates, straight-line distance. 15 registered projects within 2 km.
Imperial T3 Wing C
S. D. Corporation Private Limited
Imperial T3 Wing C1
S D CORPORATION PRIVATE LIMITED
The Altitude
VDV Infrastructures LLP
25 Downtown-Wing 1-Emerald Palm
TWENTY FIVE DOWNTOWN REALTY LIMITED
25 Downtown-Wing 2-Pearl Cove
TWENTY FIVE DOWNTOWN REALTY LIMITED
AYUDDHA EVED
CRYSTAL PROGRESSIVE LLP
Builder: SD Corporation Private Limited
SD Corporation Private Limited has 4 registrations on MahaRERA, including Building No. 2 Wings A and B Alpine and Wing B of Composite Building No 1 Imperial Edge. Its filings disclose no earlier MahaRERA projects. Read the full track record.
Frequently asked questions
What are my rights if Wing B of Composite Building No 1 Imperial Edge is delayed beyond 30 Dec 2021?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Wing B of Composite Building No 1 Imperial Edge?
The registered promoter entity is SD Corporation Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Wing B of Composite Building No 1 Imperial Edge?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Wing B of Composite Building No 1 Imperial Edge?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Wing B of Composite Building No 1 Imperial Edge?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Wing B of Composite Building No 1 Imperial Edge?
The professionals named in the filing: Architect: Vision; Engineer: JW Consultants LLP; Chartered Accountant: Bhavesh Ramesh Nagda. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Wing B of Composite Building No 1 Imperial Edge?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback