Home / Browse projects / Bengaluru Urban, Karnataka / Windchimes Phase 2
Windchimes Phase 2
By Mahindra Homes Private Limited
RG-KA-65399 · RERA PRM/KA/RERA/1251/310/PR/170912/000495
Source: official RERA Karnataka filing
Red flags
- 1 complaint at RERA Karnataka
Clear
- Completion date never moved
- Separate project account declared
Saved.
Windchimes Phase 2 is a Residential/Group Housing project by Mahindra Homes Private Limited in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/170912/000495 on 12 Sep 2017. Possession is promised by 31 Dec 2019. 1 complaint is on record with the regulator.
At a glance
Project
- NameWindchimes Phase 2
- TypeResidential/Group Housing
- Location
- Bengaluru South
- Bengaluru Urban
- PincodeNot stated
- RERA no.PRM/KA/RERA/1251/310/PR/170912/000495
- ReraGenie IDRG-KA-65399
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on12 Sep 2017
- Promised completion31 Dec 2019
- Revised completionNone
- Buildings1 building record
- Documents filed42 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| T@ | - | - | - | 224 | 0 | 224 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | Not applicable |
| Retaining wall (All types) | Not applicable |
| Plinth level Beam | Not applicable |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | Not applicable |
| RCC or MS Framed structure | - |
| Masonry construction: Bricks, Concrete blocks etc | Not applicable |
| Plastering inside , outside & Ceiling | Not applicable |
| Joinery: Doors, Windows, Ventilators etc | Not applicable |
| Basic work of Water supply, Sanitary and Electrification | Not applicable |
| Dadoing, Skirting, Flooring, Tiles work (All types) | Not applicable |
| Railing and Grill fixing | Not applicable |
| Electrification, Water supply and Sanitary Finishing | - |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | Not applicable |
| Painting | Not applicable |
| Elevation work | Not applicable |
| Internal and External work including landscapes as per santioned drawings | Not applicable |
Progress on shared amenities41
Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Internal Roads & Footpaths | Yes | - |
| Sewage and Drainage System | Yes | - |
| Parks & Tree planting | Yes | - |
| Street Lighting | Yes | - |
| Provision for community buildings and for treatment and disposal of sewage and sullage water | Yes | - |
| Solid waste management and disposal | Yes | - |
| Water conservation | No | Not applicable |
| Energy management | Yes | - |
| Fire protection and fire safety requirements | No | Not applicable |
| Education/Health/Other public amenities | Yes | - |
| Electricity supply transformer and substation | Yes | - |
| Emergency Evacuation services | No | Not applicable |
| Storm water drains | Yes | - |
| Use of renewable energy | No | Not applicable |
| Water conservation/rain water harvesting/recharge of ground water | Yes | - |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | - |
| Club House | Yes | - |
| Community Hall | Yes | - |
| Outdoor Sports facility | Yes | - |
| Indoor Sports facility | Yes | - |
| Swimming Pool | Yes | - |
| Gym | Yes | - |
| Parks | Yes | - |
| Power Backup | Yes | - |
| Gas | Yes | - |
| Water and Sanitation | Yes | - |
| Air Conditioning And incerntion | No | Not applicable |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Staircases and Lift lobbies, corridor,lobbies, corridor | Yes | - |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building / common portico/foyer/verandah | Yes | - |
| Basement | Yes | - |
| Terrace | Yes | - |
| Outer Wall | No | Not applicable |
| Open parking areas and common storage spaces | Yes | - |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
Land and ownership
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Morphogenesis |
| Engineer | DesignTree Service Consultants Pvt Ltd |
Complaints filed with RERA Karnataka1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CMP/190427/0002795 | - | Mahindra Homes Private Limited | 27/04/2019 |
Documents filed42
As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/170912/000495 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| CertificateFile: Mahindra Homes Pvt Ltd - Certificate of incorporation.pdf | - |
| Commencement Certificate - Windchimes - Phase 2 | - |
| Windchimes - BBMP Sanction Letter and Plan | - |
| Windchimes - BBMP Sanction Letter and Plan | - |
| Windchimes-Sale Deed - Proforma | - |
| Windchimes - Agreement Proforma | - |
| Windchimes - Title Opinion & Location | - |
| Windchimes - BBMP Sanction Letter and Plan | - |
| Windchimes-BDA Work Order and Development plan | - |
| Windchimes - Allotment Letter Proforma | - |
| Windchimes-Brochure | - |
| Windchimes - NOC - HAL, BWSSB, BESCOM,SEIAA,KSFS,KSPCB 1 | - |
| Windchimes Specifications | - |
| Windchimes - EC | - |
| Khata in favour of MHPL | - |
| Windchimes - Title Deeds | - |
| Windchimes - Industrial to Residential Conversion in favour of MHPL | - |
| Balance Sheet 2015 - 2016File: Mahindra Homes Pvt Ltd - FY 16-17 Balance Sheet.pdf | - |
| Balance Sheet 2014 - 2015File: Mahindra Homes Pvt Ltd- FY 15-16 Balance Sheet.pdf | - |
| Balance Sheet 2013 - 2014File: Mahindra Homes Pvt Ltd - FY 14-15 Balance Sheet.pdf | - |
| Audited Profit and Loss Statement 2015 - 2016File: Mahindra Homes Pvt Ltd - FY 16-17 P&L Statement.pdf | - |
| Audited Profit and Loss Statement 2014 - 2015File: Mahindra Homes Pvt Ltd - FY 15-16 P&L Statement.pdf | - |
| Audited Profit and Loss Statement 2013 - 2014File: Mahindra Homes Pvt Ltd -FY 14-15 P&L Statement.pdf | - |
| Director's Report 2015 - 2016File: Mahindra Homes Pvt Ltd - FY 16-17 Directors report.pdf | - |
| Director's Report 2014 - 2015File: Mahindra Homes Pvt Ltd - FY 15-16 Directors report.pdf | - |
| Director's Report 2013 - 2014File: Mahindra Homes Pvt Ltd - FY 14-15 Directors report.pdf | - |
| Cash Flow Statement 2015 - 2016File: Mahindra Homes Pvt Ltd - FY 16-17 Cash flow statement.pdf | - |
| Cash Flow Statement 2014 - 2015File: Mahindra Homes Pvt Ltd - FY 15-16 Cash flow statement.pdf | - |
| Auditor's Report 2015 - 2016File: Mahindra Homes Pvt Ltd -FY 16-17 Audit report.pdf | - |
| Auditor's Report 2014 - 2015File: Mahindra Homes Pvt Ltd -FY 15-16 Audit report.pdf | - |
| Auditor's Report 2013 - 2014File: Mahindra Homes Pvt Ltd -FY 14-15 Audit report.pdf | - |
| Income Tax Return Acknowledgement 2015 - 2016File: Mahindra Homes Pvt Ltd - Income tax return AY 16 -17.pdf | - |
| Income Tax Return Acknowledgement 2014 - 2015File: Mahindra Homes Pvt Ltd - Income tax return - AY 15 -16.pdf | - |
| Income Tax Return Acknowledgement 2013 - 2014File: Mahindra Homes Pvt Ltd - Income tax return - AY 14 -15.pdf | - |
| Windchimes Phase 2- Declaration - Form B | - |
| Prospectus/BrochureFile: Windchimes - Brochure.jpg | - |
| Advertisement Copy 1File: Windchimes - Advertisement.jpg | - |
| Tower Excel SheetFile: PRM_KA_RERA_1251_310_PR_170912_000495.xlsx | - |
| Occupancy CertificateFile: OC - 15th Oct'19 - Phase 2.pdf | - |
| Completion certificateFile: OC - 15th Oct'19 - Phase 2.pdf | - |
| Registered Agreement of SaleFile: Windchimes - Agreement Proforma.pdf | - |
| Registered conveyance deed for an individual unitFile: Windchimes-Sale Deed - Proforma.pdf | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep Windchimes Phase 2 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
Prestige Lakeside Habitat
Prestige Habitat Ventures
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
PRESTIGE FALCON CITY
PRESTIGE NOTTINGHILL INVESTMENTS
SATTVA CITY
SATTVA CITY PRIVATE LIMITED
GM AMBITIOUS ENCLAVE
M/s. Allam Infinite India Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: Mahindra Homes Private Limited
Mahindra Homes Private Limited has 2 registrations on RERA Karnataka, including Windchimes Phase 2 and Windchimes Phase 1. Its filings declare 1 earlier project, none of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if Windchimes Phase 2 is delayed beyond 31 Dec 2019?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Windchimes Phase 2?
The registered promoter entity is Mahindra Homes Private Limited, a company as per the filing. Its CIN U70102MH2010PTC203618 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Windchimes Phase 2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Windchimes Phase 2?
Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
Who certifies construction progress at Windchimes Phase 2?
The professionals named in the filing: Architect: Morphogenesis; Engineer: DesignTree Service Consultants Pvt Ltd. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Windchimes Phase 2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback