ReraGenieLog inGet a buyer report

Home / Browse projects / Bengaluru Urban, Karnataka / Windchimes Phase 1

Registration approved Residential/Group Housing project

Windchimes Phase 1

By Mahindra Homes Private Limited

RG-KA-72748 · RERA PRM/KA/RERA/1251/310/PR/170914/000458

Source: official RERA Karnataka filing

Red flags

  • 6 complaints at RERA Karnataka

Clear

  • Completion date never moved
  • Separate project account declared
Dec 2018Possession promisedno revision filed
6Complaints at RERA Karnatakaon this registration
Jump to the 32 documents Report an error

Windchimes Phase 1 is a Residential/Group Housing project by Mahindra Homes Private Limited in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/170914/000458 on 14 Sep 2017. Possession is promised by 31 Dec 2018. 6 complaints are on record with the regulator.

At a glance

Project

  • NameWindchimes Phase 1
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/310/PR/170914/000458
  • ReraGenie IDRG-KA-72748

Builder

  • NameMahindra Homes Private Limited
  • Entity typeCompany
  • CINU70102MH2010PTC203618
  • Authorized SignatoryRamesh Ranganathan
  • DirectorsRamesh Ranganathan, Anita Arjundas, Ashish Singh
  • Other registrations1 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredSep 2017PromisedDec 2018

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on14 Sep 2017
  • Promised completion31 Dec 2018
  • Revised completionNone
  • Buildings1 building record
  • Documents filed32 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
T1---2300230

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing workNot applicable
Retaining wall (All types)Not applicable
Plinth level BeamNot applicable
Sub-structure flooring (Parking Floor, more than one floor below general ground level)Not applicable
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etcNot applicable
Plastering inside , outside & CeilingNot applicable
Joinery: Doors, Windows, Ventilators etcNot applicable
Basic work of Water supply, Sanitary and ElectrificationNot applicable
Dadoing, Skirting, Flooring, Tiles work (All types)Not applicable
Railing and Grill fixingNot applicable
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
PaintingNot applicable
Elevation workNot applicable
Internal and External work including landscapes as per santioned drawingsNot applicable

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemNoNot applicable
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationNoNot applicable
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationNoNot applicable
Emergency Evacuation servicesYes-
Storm water drainsYes-
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityYes-
Swimming PoolNoNot applicable
GymNoNot applicable
ParksYes-
Power BackupYes-
GasYes-
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesNoNot applicable
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallNoNot applicable
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area11,977 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 203.76 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMorphogenesis
EngineerDesignTree Service Consultants Pvt Ltd

Complaints filed with RERA Karnataka6

Case no.ComplainantRespondentFiled
CMP/200827/0006448-Mahindra Homes Private Limited27/08/2020
CMP/210423/0007921-Mahindra Homes Private Limited23/04/2021
00240/2023-Mahindra Homes Private Limited24/02/2023
00250/2023-Mahindra Homes Private Limited27/02/2023
00710/2023-Mahindra Homes Private Limited08/05/2023
00711/2023-Mahindra Homes Private Limited08/05/2023

Documents filed32

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/170914/000458 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: Mahindra Homes Pvt Ltd - Certificate of incorporation.pdf-
Commencement Certificate - Windchimes - Phase 1-
Windchimes - BBMP Sanction Letter and Plan-
Windchimes-BDA Work Order and Development plan-
Windchimes-Sale Deed - Proforma-
Windchimes - Agreement Proforma-
Windchimes - Title Opinion & Location-
Windchimes - BBMP Sanction Letter and Plan-
Windchimes-BDA Work Order and Development plan-
Windchimes - Allotment Letter Proforma-
Windchimes-Brochure-
Windchimes - NOC - HAL, BWSSB, BESCOM,SEIAA,KSFS,KSPCB 1-
Windchimes Specifications-
Windchimes - EC-
Khata in favour of MHPL-
Windchimes - Title Deeds-
Windchimes - Title Deeds-
Windchimes - Industrial to Residential Conversion in favour of MHPL-
Balance Sheet 2015 - 2016File: Mahindra Homes Pvt Ltd - FY 16-17 Balance Sheet.pdf-
Auditor's Report 2015 - 2016File: Mahindra Homes Pvt Ltd -FY 16-17 Audit report.pdf-
Auditor's Report 2014 - 2015File: Mahindra Homes Pvt Ltd -FY 15-16 Audit report.pdf-
Auditor's Report 2013 - 2014File: Mahindra Homes Pvt Ltd -FY 14-15 Audit report.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: Mahindra Homes Pvt Ltd - Income tax return AY 16 -17.pdf-
Income Tax Return Acknowledgement 2014 - 2015File: Mahindra Homes Pvt Ltd - Income tax return - AY 15 -16.pdf-
Income Tax Return Acknowledgement 2013 - 2014File: Mahindra Homes Pvt Ltd - Income tax return - AY 14 -15.pdf-
Windhimes Phase 1 - Declaration - Form B-
Prospectus/BrochureFile: Windchimes - Brochure.jpg-
Advertisement Copy 1File: Windchimes - Advertisement.jpg-
Tower Excel SheetFile: PRM_KA_RERA_1251_310_PR_170914_000458 (1).xlsx-
Occupancy CertificateFile: OC - windchimes phase1.pdf-
Completion certificateFile: OC - Windchimes Phase 2.pdf-
Registered Agreement of SaleFile: Regd Agreement to Sell.pdf-

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 not delivered by the promised date
ProjectLocationStatusPromisedDelivered
Luminaire-OngoingJul 2017Not delivered

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Windchimes Phase 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: Mahindra Homes Private Limited

Mahindra Homes Private Limited has 2 registrations on RERA Karnataka, including Windchimes Phase 2 and Windchimes Phase 1. Its filings declare 1 earlier project, none of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Windchimes Phase 1 is delayed beyond 31 Dec 2018?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Windchimes Phase 1?

The registered promoter entity is Mahindra Homes Private Limited, a company as per the filing. Its CIN U70102MH2010PTC203618 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Windchimes Phase 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Windchimes Phase 1?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at Windchimes Phase 1?

The professionals named in the filing: Architect: Morphogenesis; Engineer: DesignTree Service Consultants Pvt Ltd. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Windchimes Phase 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Windchimes Phase 1. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Windchimes Phase 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.