White Rose
By Nidhi Land Infrastructure Developers India (P) Ltd, Vijay Kumar Agarwal, Anuradha R Nayak & Others
RG-KA-48124 · RERA PRM/KA/RERA/1257/334/PR/200626/008732 · Last updated on RERA Karnataka portal: 14 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
White Rose is a Mixed Development project by Nidhi Land Infrastructure Developers India (P) Ltd, Vijay Kumar Agarwal, Anuradha R Nayak & Others in Dakshina Kannada, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1257/334/PR/200626/008732 on 20 Jun 2026. Possession is promised by 31 Oct 2030. 5 of the 57 units on this registration are recorded sold or booked, and 0 of 18 construction stages are filed complete.
At a glance
Project
- NameWhite Rose
- TypeMixed Development
- Location
- Mangalore
- Dakshina Kannada
- 575005
- Pincode575005
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1257/334/PR/200626/008732
- ReraGenie IDRG-KA-48124
Builder
- NameNidhi Land Infrastructure Developers India (P) Ltd, Vijay Kumar Agarwal, Anuradha R Nayak & Others
- Entity typeOther ( Land Owners )
- GSTIN29AADCN8891L1ZK
- Authorized SignatoryPrashanth K. Sanil
- Declared earlier projects5 →
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on20 Jun 2026
- Promised completion31 Oct 2030
- Revised completionNone
- Buildings1 building record
- Documents filed97 files
Current status
Figures as on 14 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| White Rose | - | - | - | - | - | 57 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 14 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 18 construction stages are filed complete. The stage furthest along is Earth work and other leveling preparation work, at 67%.
Building: 13% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 67% |
| Foundation footing work | 63% |
| Upto Plinth Level | 48% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 28% |
| Retaining wall (All types) | 12% |
| RCC or MS Framed structure | 12% |
| Masonry Construction | 0% |
| Plastering inside , outside & Ceiling | 0% |
| Joinery: Doors, Windows, Ventilators etc | 0% |
| Basic work of Water supply, Sanitary and Electrification | 0% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 0% |
| Railing and Grill fixing | 0% |
| Electrification, Water supply and Sanitary Finishing | 0% |
| Painting | 0% |
| Fire prevention and fire fighting fitting and fixture with network | 0% |
| Weather Proof work(tile,concrete) | 0% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 0% |
| Internal and External work including landscapes as per sanctioned drawings | 0% |
Progress on shared amenities40
As on 14 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 0% |
| Sewage and Drainage System | Yes | 0% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Energy management | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Solid waste management and disposal | Yes | 0% |
| Emergency Evacuation services | Yes | 0% |
| Internal Roads & Footpaths | No | Not applicable |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | Yes | 0% |
| Use of renewable energy | Yes | 0% |
| Sewage Treatment Plant (STP) | No | Not applicable |
| Parks & Tree planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 0% |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | No | Not applicable |
| Parks | No | Not applicable |
| Power Backup | Yes | 0% |
| Piped Gas | Yes | 0% |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 8% |
| Lifts | Yes | 8% |
| Corridor/Lobbies | Yes | 0% |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | No | Not applicable |
| Basement | Yes | 0% |
| Terrace | Yes | 0% |
| Outer Wall | Yes | 0% |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | 0% |
| Common storage spaces | Yes | 0% |
Land and ownership5
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Nidhi Land Infrastructure Developers India (P) Ltd., | - | - |
| Rammohan Kamalaksha Nayak | - | - |
| Anuradha Rammohan Nayak | - | - |
| Vijay Kumar Agarwal | - | - |
| Kiran Agarwal | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 15.92 cr | Rs 1.14 cr |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Dharmaraj |
| Engineer | Dharmaraj |
| Chartered Accountant | Shantharama Shetty |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed97
As listed on the registration, under the names the promoter filed them with; the newest 80 of 97 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1257/334/PR/200626/008732 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: White Rose- Form-4 CA Certificate-Q2-2026-27.pdf | 14 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: White Rose- Architects Certificate -Q2-2026-27.pdf | 14 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: ENG CERTIFICATE - Whit Rose - Q2-2026-27.pdf | 14 Oct 2026 |
| Q2 2026-27 Fire and Safety | 14 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form -4, wrs Q1 26-2.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: ARCH - White Rose.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: ENG - White Rose.pdf | 15 Jul 2026 |
| Q1 2026-27 Fire and Safety | 15 Jul 2026 |
| G.P.A. - RAMMOHAN NAYAK & ANURADHA NAYAKFile: GPA- Rammohan Kamalaksha Nayak & Anuradha Rammohan Nayak-White Rose.pdf | 11 Jun 2026 |
| G.P.A. - VIJAY AGARWAL & KIRAN AGARWALFile: GPA- Vijay Agarwal & Kiran Agarwal- White Rose.pdf | 11 Jun 2026 |
| AFS - AS SUGGESTED, RELATED CLAUSES HAVE BEEN UPDATED IN THE DRAFT.File: Agreement For Sale_Draft_White Rose_RERA_Revised_11062026.pdf | 11 Jun 2026 |
| UP TO DATE E.C.File: Merged EC- White Rose.pdf | 11 Jun 2026 |
| THIS PROJECT IS DEVELOPED BY THE LAND OWNERS THEMSELVES; HENCE THE AFFIDAVIT IS UPLOADED.File: WRS- Affidavit Cum Declaration.pdf | 6 Jun 2026 |
| UPTO DATE EC FROM 01-04-2011File: EC_31032011 to 23022026_White Rose.pdf | 6 Jun 2026 |
| QUERIES - RERA - CLARIFICATIONSFile: Queries-5_White Rose_Clarification.pdf | 6 Jun 2026 |
| CONNECTED MRFile: Connected MR.pdf | 9 May 2026 |
| TITLE DEEDFile: WRS- Sale Deed.pdf | 9 May 2026 |
| NOTARISED AFFIDAVIT CUM JOINT DECLARATIONFile: Affidavit cum Joint Declaration.pdf | 9 May 2026 |
| EC FROM 01-04-2011 TO TILL DATEFile: EC_31032011 to 23022026_White Rose.pdf | 9 May 2026 |
| AFS - REVISED DRAFT - AS SUGGESTED, RELATED CLAUSES HAVE BEEN INCORPOORATED.File: Agreement For Sale_Draft_White Rose_RERA_Revised.pdf | 9 May 2026 |
| WATER NOC - WE UNDERTAKE RESPONSIBILITY TO PROVIDE WATER SUPPLY & WATER NOC - AFFIDAVITFile: Affidavit_Water NoC_Submission_White Rose.pdf | 9 May 2026 |
| DETAILS AND THE CLARIFICATIONS ON THE QUERIES RAISED BY RERAFile: Queries-4_Clarifications_White Rose_06052026_R1.pdf | 9 May 2026 |
| CONNECTED MRFile: Connected MR.pdf | 14 Apr 2026 |
| NOTARISED AFFIDAVIT CUM JOINT DECLARATIONFile: Affidavit cum Joint Declaration.pdf | 14 Apr 2026 |
| EC FROM 01-04-2011 TO TILL DATEFile: EC_31032011 to 23022026_White Rose.pdf | 14 Apr 2026 |
| AFS - REVISED DRAFT - AS SUGGESTED, RELATED CLAUSES HAVE BEEN INCORPOORATED.File: Agreement For Sale_Draft_White Rose_RERA_Revised.pdf | 14 Apr 2026 |
| WATER NOC - WE UNDERTAKE RESPONSIBILITY TO PROVIDE WATER SUPPLY & WATER NOC - AFFIDAVITFile: Affidavit_Water NoC_Submission_White Rose.pdf | 14 Apr 2026 |
| SEWER LINE CONNECTION DRAWINGFile: White Rose UGD.pdf | 14 Apr 2026 |
| DETAILS AND THE CLARIFICATIONS ON THE QUERIES RAISED BY RERAFile: Queries-3_White Rose_07042026_DETAILS & CLARIFICATIONS.pdf | 14 Apr 2026 |
| SELF ATTESTED PANFile: Self Attested PAN.jpeg | 24 Feb 2026 |
| BANK STATEMENTFile: WRS Bank Satement_Merged.pdf | 24 Feb 2026 |
| AFFIDAVIT - BANK ACCOUNTSFile: AffiDavit _Bank Account.pdf | 24 Feb 2026 |
| SOURCE OF FUNDFile: Source of fund.pdf | 24 Feb 2026 |
| CURRENT YEAR RTCFile: 1 Current Year RTC.pdf | 24 Feb 2026 |
| CONNECTED MRFile: 2 Connected MR.pdf | 24 Feb 2026 |
| TITLE DOCUMENTSFile: 3 Sale Deed.pdf | 24 Feb 2026 |
| AFFIDAVIT CUM JOINT DECLARATIONFile: 5 Affidavit cum Joint Declaration.pdf | 24 Feb 2026 |
| E.C.File: 6 Merged EC from 01041991.pdf | 24 Feb 2026 |
| SINGLE LAYOUT PLANFile: 1 Single Site Plan.pdf | 24 Feb 2026 |
| SINGLE LAYOUT ORDERFile: 2 Single Site Order.pdf | 24 Feb 2026 |
| SURVEY SKETCHFile: 3 Certified Survey Sketch.pdf | 24 Feb 2026 |
| LOCATION DETAILSFile: 4 Location Details of the Project.pdf | 24 Feb 2026 |
| COMMENCEMENT CERTIFICATEFile: 5 Building Licence.pdf | 24 Feb 2026 |
| PROJECT MASTER PLANFile: 6 Master Plan_Project Site Demarcation in Landuse Map.pdf | 24 Feb 2026 |
| VILLAGE MAPFile: 7 Village Map.pdf | 24 Feb 2026 |
| APPROVAL - NOC FROM KTCP ACTFile: 9 Building Licence.pdf | 24 Feb 2026 |
| AGREEMENT FOR SALE DRAFTFile: 3 Agreement For Sale_Draft_White Rose_RERA.pdf | 24 Feb 2026 |
| MESCOM NOCFile: 4 Mescom NOC.pdf | 24 Feb 2026 |
| WATER NOCFile: 5 Water NOC Application.pdf | 24 Feb 2026 |
| FIRE NOCFile: 6 Fire NOC.pdf | 24 Feb 2026 |
| PROJECT ESTIMATIONFile: 7 Project Estimation.pdf | 24 Feb 2026 |
| GUIDANCE VALUE CERTIFIED BY THE ENGINEERFile: 9 Guidance ValueCertified by the Engineer.pdf | 24 Feb 2026 |
| CLARIFICATIONS ON QUERIES - 1 RAISED BY RERA ON WHITE ROSE PROJECTFile: Queries_White Rose_RERA_2302206.pdf | 24 Feb 2026 |
| BANK ACCOUNTS - AFFIDAVIT AND BANK STATEMENTFile: Bank Accounts_Affidavit & Bank Statement_White Rose.pdf | 24 Feb 2026 |
| SINGLE E.C. FROM 31-03-2011 TO 23-02-2026File: EC_31032011 to 23022026_White Rose.pdf | 24 Feb 2026 |
| ZONAL CERTIFICATEFile: Zonal Certificate_White Rose.pdf | 24 Feb 2026 |
| AFFIDAVIT - WATER N.O.C.File: Affidavit_Water NoC_Submission_White Rose.pdf | 24 Feb 2026 |
| CLARIFICATIONS ON QUERIES - 2 RAISED BY RERA ON WHITE ROSE PROJECTFile: Queries_23022026_White Rose.pdf | 24 Feb 2026 |
| RTC, survey 131-1P | - |
| Mutation, survey 131-1P | - |
| Encumbrance Certificate, survey 131-1P | - |
| Conversion/Alienation Order, survey 131-1P | - |
| Sale/Title/Gift Deed, survey 131-1P | - |
| Khatha, survey 131-1P | - |
| Registration CertificateFile: Incorparation certificate.pdf | - |
| GST CertificateFile: Gst Certifiate_Nidhi Land.pdf | - |
| Certificate issued by CA Form 1File: Form-1- CA Certificate WHITE ROSE.pdf | - |
| Certificate issued by Architect Form 2File: Nidhiland Architecture Certificate.pdf | - |
| Certificate issued by Engineer Form 3File: Nidhiland Engineers Certificate.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: Affidavit_No Dispute_Non Litigation.pdf | - |
| Balance Sheet 2024 - 2025File: Balance Sheet & Profit and Loss With Shedule_compressed.pdf | - |
| Balance Sheet 2023 - 2024File: Balance Sheet & Profit and Loss With Shedule_compressed.pdf | - |
| Balance Sheet 2022 - 2023File: Balance Sheet 2022-23.pdf | - |
| Audited Profit and Loss Statement 2024 - 2025File: Balance Sheet & Profit and Loss With Shedule_compressed.pdf | - |
| Audited Profit and Loss Statement 2023 - 2024File: Balance Sheet & Profit and Loss With Shedule_compressed.pdf | - |
| Audited Profit and Loss Statement 2022 - 2023File: Auditor Report 2022-23.pdf | - |
| Income Tax Return Acknowledgement 2024 - 2025File: Tax return Acknowledge.pdf | - |
Promoter's earlier projects5
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| Shakthi Heights | Near Shri Gopala Krishna Temple Road, Shakthi Nagar, Mangalore | Ongoing | Jun 2031 | Not due yet |
| Poorvaj | Poorvaj, Shivabagh, Kadri, Mangalore | Ongoing | Nov 2029 | Not due yet |
| Smrithi Heights | Smrithi Heights, Nanthoor - Pumpwell Road, Mangalore | Ongoing | Jun 2029 | Not due yet |
| Sudham Residences | Sudham Residences, Abbakka Nagar, Kottara Chowki, Mangalore | Completed | - | No date filed |
| Sankalp Residences | Sankalp Residences, J.B. Lobo Road, Kottara Chowki, Mangalore | Completed | - | No date filed |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Dakshina Kannada
Computed across the 620+ Dakshina Kannada projects on ReraGenie, from their own filings.
Keep White Rose on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Dakshina Kannada620+ in Dakshina Kannada
Filed coordinates, straight-line distance. 25 registered projects within 2 km.
SOMESHWARA VISTA PHASE-II
SOMESHWAR PROMOTERS AND DEVELOPERS
Kamaldeep’s Amma Residency
KAMALDEEP PROMOTERS & DEVELOPERS
WALK IN AIKYA
WALK IN BUILDERS AND DEVELOPERS
Mary Hillside Apartment
G Group Builders & Developers
BIGAPPLE HILLS
BIGAPPLE VENTURES LLP
PROVIDENCE WEST VIEW
ANTONY STEPHEN CUTINHA
See every Dakshina Kannada project, with the district possession charts
Builder: Nidhi Land Infrastructure Developers India (P) Ltd, Vijay Kumar Agarwal, Anuradha R Nayak & Others
Nidhi Land Infrastructure Developers India (P) Ltd, Vijay Kumar Agarwal, Anuradha R Nayak & Others has 1 registration on RERA Karnataka, including White Rose. Its filings declare 5 earlier projects, 2 of them declared completed. Read the full track record. See more projects on the Dakshina Kannada district page.
Frequently asked questions
What are my rights if White Rose is delayed beyond 31 Oct 2030?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of White Rose?
The registered promoter entity is Nidhi Land Infrastructure Developers India (P) Ltd, Vijay Kumar Agarwal, Anuradha R Nayak & Others, an other ( land owners ) as per the filing. Its GSTIN 29AADCN8891L1ZK can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in White Rose?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at White Rose?
The professionals named in the filing: Architect: Dharmaraj; Engineer: Dharmaraj; Chartered Accountant: Shantharama Shetty. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in White Rose?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.