ReraGenieLog inGet a buyer report

Home / Browse projects / Sangli, Maharashtra / WAKALE ARCADE

Completed No litigation declared Others project

WAKALE ARCADE

By JAYANT JAYSING NALAWADE

RG-MH-94552 · RERA P53100017565 · Last updated on MahaRERA portal: 13 Jul 2023

Source: official MahaRERA filing

Red flags

  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Sangli registration emailed to you, free during the pilot beta.
Jul 2022Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 54 documents Report an error

WAKALE ARCADE is a Others project by JAYANT JAYSING NALAWADE in Sangli, Maharashtra, registered with MahaRERA as P53100017565 on 28 Aug 2018. The registration is recorded completed; possession was promised by 19 Jul 2022.

At a glance

Project

  • NameWAKALE ARCADE
  • TypeOthers
  • Location
    • GANDHI CHOWK
    • NEAR HDFC BANK
    • Uran Islampur (M Cl)
    • Walwa
    • Sangli
    • 415409
  • Pincode415409
  • RERA no.P53100017565
  • ReraGenie IDRG-MH-94552

Builder

  • NameJAYANT JAYSING NALAWADE
  • Entity typeIndividual

Key dates

this monthRegisteredAug 2018PromisedJul 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on28 Aug 2018
  • Promised completion19 Jul 2022
  • Revised completionNone
  • Buildings1 building record
  • Documents filed54 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WAKALE ARCADENA70000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 Jul 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

WAKALE ARCADE: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 13 Jul 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed18

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots18
Closed/Covered6
Open Space12

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area368 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI734.98
Proposed, not sanctioned735 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBRAHMANPURI ISLAMPUR

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNIRANJANSINH RATANSINH THAKOOR
EngineerNITIN A PATIL
PartnerRole in project
JAYANT JAYSING NALAWADE-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT53100017119Jul 2022 → Jul 2024

Reason as filed by the promoterDue to covid reson their is no underconstruction booking thats whay this project is delay not taking any booking project is completed took completion certificate also update all document compliance form1 form2 form3 form5 form2a disclosure of sold and form 4. extension is requird for sale deed

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Aug 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Aug 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Aug 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Aug 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 12 Jul 2023

Documents filed54

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of Formation of Legal Entity (Society/Co Op etc.)File: deed of declaration jayant nalwade_compressed 1-49_compressed.pdf13 Jul 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: deed of declaration jayant nalwade_compressed 50-97_compressed.pdf13 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate 2019.pdf12 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate 31032020.pdf12 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate 31032021.pdf12 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate 31032022.pdf12 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate 31032023.pdf12 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: architect certificate 31032023.pdf12 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineers certificate - 31032019.pdf12 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineers certificate - 31032020.pdf12 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineers certificate31032021.pdf12 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineers certificate-31032022.pdf12 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineers crtificate 31032023.pdf12 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: form 2 a - 31032019.pdf12 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: form 2 a 31032020.pdf12 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: form 2 a 31032022.pdf12 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form 2 a 31032023.pdf12 Jul 2023
Disclosure of sold/ booked inventoryFile: disclosure of sold 1.pdf12 Jul 2023
Disclosure of sold/ booked inventoryFile: disclosure of sold 2.pdf12 Jul 2023
Disclosure of sold/ booked inventoryFile: disclosure of sold 3.pdf12 Jul 2023
Disclosure of sold/ booked inventoryFile: disclosure of sold 4.pdf12 Jul 2023
Disclosure of sold/ booked inventoryFile: disclosure of sold 5.pdf12 Jul 2023
Certificates of CA (Form 3)File: C A CERTIFICATE - DEC 2021 OLD FORMAT.pdf12 Jul 2023
Certificates of CA (Form 3)File: C A CERTIFICATE 2018-2019.pdf12 Jul 2023
Certificates of CA (Form 3)File: ANNUAL REPORT5-19-20.pdf12 Jul 2023
Certificates of CA (Form 3)File: C A CERTIFICATE - 2020-2021.pdf12 Jul 2023
Certificates of CA (Form 3)File: C A CERTIFICATE - 31 DEC 21 NEW FORMAT.pdf12 Jul 2023
Certificates of CA (Form 3)File: C A CERTIFICATE - MARCH 2022.pdf12 Jul 2023
Certificates of CA (Form 3)File: C A CERTIFICATE - 30 JUNE 2022.pdf12 Jul 2023
Certificates of CA (Form 3)File: C A CERTIFICATE- 30SEP2022.pdf12 Jul 2023
Certificates of CA (Form 3)File: C A CERTIFICATE - 31 DEC 22.pdf12 Jul 2023
Certificates of CA (Form 3)File: C A CERIFICATE- 31 MARCH 2023.pdf12 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: ANNUAL REPORT5 18-19.pdf12 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: ANNUAL REPORT5-19-20.pdf12 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: ANNUAL REPORT5 20-21.pdf12 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: ANNUAL REPORT5 22-23.pdf12 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: ANNUAL REPORT5 21-22.pdf12 Jul 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: complition certificate.pdf12 Jul 2023
Architect’s Certificate on Completion of Project (Form 4)File: architect certificate FORM 4.pdf12 Jul 2023
Certificates of CA (Form 5)File: Jayant nalawade from no -5.pdf15 Oct 2018
Building plan approvalFile: DRAWING SHEET 1.pdf20 Aug 2018
Building plan approvalFile: DRAWING SHEET 2.pdf20 Aug 2018
Layout approvalFile: PLAN.pdf20 Aug 2018
PAN CardFile: PAN.pdf20 Aug 2018
Copy of the legal title reportFile: LEGAL REPORT.pdf20 Aug 2018
Details of encumbrancesFile: CERTIFICATE.pdf20 Aug 2018
Copy of Layout Approval (in case of layout)File: PLAN.pdf20 Aug 2018
Building Plan Approval (IOD)File: DRAWING SHEET 1.pdf20 Aug 2018
Building Plan Approval (IOD)File: DRAWING SHEET 2.pdf20 Aug 2018
Commencement Certificates / NA Order for plotted developmentFile: COMMESMENT CERTIFICATE.pdf20 Aug 2018
Declaration in FORM BFile: FORM B.pdf20 Aug 2018
Certificates of CA (Form 3)File: C A certificate.pdf20 Aug 2018
Proforma of Allotment letterFile: AGREEMENT FORMAT.pdf20 Aug 2018
Proforma of Allotment letterFile: allotment letter.pdf20 Aug 2018

How this compares with Sangli

11%of Sangli projects moved their completion datethis one has not
29%of Sangli registrations have lapsed or been cancelledthis one is completed

Computed across the 790+ Sangli projects on ReraGenie, from their own filings.

Keep WAKALE ARCADE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEAR HDFC BANK790+ in Sangli

Builder: JAYANT JAYSING NALAWADE

JAYANT JAYSING NALAWADE has 1 registration on MahaRERA, including WAKALE ARCADE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Sangli district page.

Frequently asked questions

What are my rights if WAKALE ARCADE is delayed beyond 19 Jul 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of WAKALE ARCADE?

The registered promoter entity is JAYANT JAYSING NALAWADE, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in WAKALE ARCADE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for WAKALE ARCADE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at WAKALE ARCADE?

The professionals named in the filing: Architect: NIRANJANSINH RATANSINH THAKOOR; Engineer: NITIN A PATIL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in WAKALE ARCADE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About WAKALE ARCADE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save WAKALE ARCADE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.