Red flags

  • 27 complaints at RERA Karnataka
  • Completion date moved by 66 months
  • 2 extensions taken

Clear

  • Separate project account declared
Jun 2024Possession promisedmoved 66 months from the original
27Complaints at RERA Karnatakaon this registration
Jump to the 52 documents Report an error

VIVANSAA AURIGAA is a Residential/Group Housing project by VIIJCON PROPERTIES in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/308/PR/171230/002053 on 30 Dec 2017. Possession is promised by 30 Jun 2024. The completion date has moved by 66 months from the original filing. 27 complaints are on record with the regulator.

At a glance

Project

  • NameVIVANSAA AURIGAA
  • TypeResidential/Group Housing
  • Location
    • Anekal
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/308/PR/171230/002053
  • ReraGenie IDRG-KA-69164

Builder

  • NameVIIJCON PROPERTIES
  • Entity typePartnership Firm
  • Authorized SignatorySWAPNIL AGRAWAL
  • OthersVIJAY AGARWAL
  • Declared earlier projects1 →

Key dates

this monthRegisteredDec 2017First promiseDec 2018Revised toJun 2024

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on30 Dec 2017
  • Promised completion30 Jun 2024
  • Revised completionRevised to 30 Jun 2024 (originally 31 Dec 2018)
  • Buildings2 building records
  • Documents filed52 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A---35035
B---30030

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing workNot applicable
Retaining wall (All types)Not applicable
Plinth level BeamNot applicable
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)Not applicable
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsNoNot applicable
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationNoNot applicable
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesNoNot applicable
Electricity supply transformer and substationYes-
Emergency Evacuation servicesNoNot applicable
Storm water drainsYes-
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallYes-
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupNoNot applicable
GasNoNot applicable
Water and SanitationNoNot applicable
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesNoNot applicable
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,028 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 12.20 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectForm N Square Architects
EngineerManohar Consultants

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EX/PRM/KA/RERA/1251/308/PR/220928/002053Dec 2018 → Dec 2019

Reason as filed by the promoterShortage of Labour

ExtensionDec 2019 → Jun 2024

No reason recorded in the filing

Complaints filed with RERA Karnataka27

Case no.ComplainantRespondentFiled
CMP/190319/0002458-VIIJCON PROPERTIES19/03/2019
CMP/190331/0002518-VIIJCON PROPERTIES31/03/2019
CMP/190408/0002597-VIIJCON PROPERTIES08/04/2019
CMP/190420/0002713-VIIJCON PROPERTIES20/04/2019
CMP/190420/0002718-VIIJCON PROPERTIES20/04/2019
CMP/190728/0003742-VIIJCON PROPERTIES28/07/2019
CMP/190924/0004298-VIIJCON PROPERTIES24/09/2019
CMP/200108/0005170-VIIJCON PROPERTIES08/01/2020
CMP/200116/0005238-VIIJCON PROPERTIES16/01/2020
CMP/200303/0005628-VIIJCON PROPERTIES03/03/2020
CMP/200505/0005870-VIIJCON PROPERTIES05/05/2020
CMP/200505/0005867-VIIJCON PROPERTIES05/05/2020
CMP/200512/0005885-VIIJCON PROPERTIES12/05/2020
CMP/200611/0005960-VIIJCON PROPERTIES11/06/2020
CMP/200714/0006150-VIIJCON PROPERTIES14/07/2020
CMP/200816/0006376-VIIJCON PROPERTIES16/08/2020
CMP/200831/0006485-VIIJCON PROPERTIES31/08/2020
CMP/210222/0007633-VIIJCON PROPERTIES22/02/2021
CMP/211026/0008474-VIIJCON PROPERTIES26/10/2021
CMP/220830/0009963-VIIJCON PROPERTIES30/08/2022
CMP/220920/0010032-VIIJCON PROPERTIES20/09/2022
00239/2023-VIIJCON PROPERTIES23/02/2023
00295/2023-VIIJCON PROPERTIES06/03/2023
00961/2023-VIIJCON PROPERTIES22/06/2023
01279/2023-VIIJCON PROPERTIES23/08/2023
01230/2025-VIIJCON PROPERTIES26/09/2025
00608/2026-VIIJCON PROPERTIES27/05/2026

Documents filed52

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/308/PR/171230/002053 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: Certificate of Establishment - Viijcon Properties.pdf-
Project Details-
Architect Certificate for Work Completion Schedule till DateFile: Arc certificate - work completed.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: engine work completed.pdf-
CA Certificate for Funds UtilizationFile: fund utilized 1.pdf-
Architect Certificate for Pending Work Completion Schedule.File: Arc certificate - work pending.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Engineer pending work.pdf-
CA Certificate for Funds required for Project CompletionFile: funds required1.pdf-
AffidavitFile: AFFIDAVIT.pdf-
Latest Encumbrance CertificateFile: Non Incumbereances Declaration.pdf-
Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails.xlsx-
commencement cert-
Revised Site Plan-
Revised 1- 7 Floor Plan-
sale deed - Aurigaa-
Aurigaa Agreement Draft - RERA-
LAND DOC-
SPECIFICATIONS-
Revised Site Plan-
Booking-_-Allotment-Application-1-3-
Booking-_-Allotment-Application-1-3-
SPECIFICATIONS-
Non Incumbereances Declaration-
Aurigaa Khata Merged-ilovepdf-compressed-
LAND DOC-
Electricity NOC -
CONVERSION ORDER-
scan0001[1]-
Noc Airport 1-
NOC KSPCB-
DECLARATION-
Balance Sheet 2015 - 2016File: BALANCE SHEET 2015-2016.pdf-
Balance Sheet 2014 - 2015File: BALANCE SHEET 2014-2015.pdf-
Balance Sheet 2013 - 2014File: BALANCE SHEET 2013-2014.pdf-
Audited Profit and Loss Statement 2015 - 2016File: profit & loss 2015 -2016.pdf-
Audited Profit and Loss Statement 2014 - 2015File: Profit and loss 2014-2015.pdf-
Audited Profit and Loss Statement 2013 - 2014File: PROFIT AND LOSS 2013 -2014.pdf-
Director's Report 2015 - 2016File: DECLARATION.pdf-
Director's Report 2014 - 2015File: DECLARATION.pdf-
Director's Report 2013 - 2014File: DECLARATION.pdf-
Cash Flow Statement 2015 - 2016File: DECLARATION.pdf-
Cash Flow Statement 2014 - 2015File: DECLARATION.pdf-
Auditor's Report 2015 - 2016File: 2016-1-2.pdf-
Auditor's Report 2014 - 2015File: 2015.pdf-
Auditor's Report 2013 - 2014File: 2014.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: acknowledgment 2015-2016.pdf-
Income Tax Return Acknowledgement 2014 - 2015File: acknowledgment 2014-2015.pdf-
Income Tax Return Acknowledgement 2013 - 2014File: acknowledgement 2013-2014.pdf-
declaration form B-
Prospectus/BrochureFile: Baalsam Brochure.pdf-
Advertisement Copy 1File: VIVANSAA BAALSAM.pdf-
Tower Excel SheetFile: PRM_KA_RERA_1251_308_PR_171230_002053.xlsx-

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 not delivered by the promised date
ProjectLocationStatusPromisedDelivered
CELLANDINE-OngoingJul 2020Not delivered

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 66 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep VIVANSAA AURIGAA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: VIIJCON PROPERTIES

VIIJCON PROPERTIES has 1 registration on RERA Karnataka, including VIVANSAA AURIGAA. Its filings declare 1 earlier project, none of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if VIVANSAA AURIGAA is delayed beyond 30 Jun 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of VIVANSAA AURIGAA?

The registered promoter entity is VIIJCON PROPERTIES, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in VIVANSAA AURIGAA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against VIVANSAA AURIGAA?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at VIVANSAA AURIGAA?

The professionals named in the filing: Architect: Form N Square Architects; Engineer: Manohar Consultants. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VIVANSAA AURIGAA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VIVANSAA AURIGAA. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VIVANSAA AURIGAA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.