Home / Browse projects / Thane, Maharashtra / VINAYAK PLATINA

Registered No litigation declared Mixed project

VINAYAK PLATINA

By VINAYAK CONSTRUCTION

RG-MH-17839 · RERA P51700077189 · Last updated on MahaRERA portal: 20 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 8 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
16 of 44Construction stages doneacross 5 buildings; furthest along: Internal walls, 45%
113 of 152Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 72 documents Report an error

VINAYAK PLATINA is a Mixed project by VINAYAK CONSTRUCTION in Thane, Maharashtra, registered with MahaRERA as P51700077189 on 29 Jul 2024. Possession is promised by 31 Dec 2026. 39 of the 152 units on this registration are recorded sold or booked, and 16 of 44 construction stages are filed complete.

At a glance

Project

  • NameVINAYAK PLATINA
  • TypeMixed
  • Location
    • DOMBIVLI EAST
    • VILL MANGAON
    • Mangaon
    • Kalyan
    • Thane
    • 421203
  • Pincode421203
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700077189
  • ReraGenie IDRG-MH-17839

Builder

  • NameVINAYAK CONSTRUCTION
  • Entity typePartnership
  • PartnersSANJAY BALARAM JOSHI, RAMUDAY AADIK YADAV, ARUN RAMDHANI SINGH, PAWAN LALLAN SINGH
  • Other registrations8 more →
  • Completed1 of 9
  • No longer live4 lapsed, de-registered or revoked

Key dates

this monthRegisteredJul 2024PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 Jul 2024
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings4 building records
  • Documents filed72 files

Current status

26%39 of 152 units booked
62.1%Work done, per cost certificate

Figures as on 20 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING-ANA8828230
WING-BNA88281038
WING-CNA7736844
WING-DNA7735439

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 20 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

16 of 44 construction stages are filed complete across 5 buildings. The stage furthest along is Internal walls, at 45%.

WING-A52%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises45%
Sanitary Fittings within the flats / premises45%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks45%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.35%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING-B52%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises45%
Sanitary Fittings within the flats / premises45%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks45%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.35%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING-C52%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises45%
Sanitary Fittings within the flats / premises45%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks45%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.35%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING-D52%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises45%
Sanitary Fittings within the flats / premises45%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks45%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.35%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
NA Plot Without StructureNot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 20 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed177

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots177
Closed/Covered105
Open Space72
BuildingClosed/CoveredOpen SpaceTotal
WING-A271340
WING-B202141
WING-C281947
WING-D301949

Land and ownership5

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,700 sq m
Land owned byNot the promoter
Named landowners5
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on12 Dec 2025
LandownerVillageDistrict
Dattatray Shantaram VazeDOMBIVLIThane
Abhimanyu Baburao MhatreDOMBIVLIThane
Chandrakant Savalaram VazeDOMBIVLIThane
Rutuja Gulab VazeDOMBIVLIThane
Abhimannu Dashrath PatilDOMBIVLIThane

Approvals and building plan

Sanctioning authorityKalyan Dombivali Municipal Corporation, Kalyan
Permissible FSI7173.38
Proposed, not sanctioned7,169 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSiddhivinayak Darshan A Wing Gr Floor Manpada Road Mumbai Maharashtra 421201
Estimated costRs 46.23 cr
Cost incurredRs 28.73 cr
Work done62.14%
BuildingWingEstimatedIncurred
WING-ANARs 11.34 crRs 7.18 cr
WING-BNARs 11.34 crRs 7.18 cr
WING-CNARs 11.34 crRs 7.18 cr
WING-DNARs 11.34 crRs 7.18 cr
-NARs 85.00 lakh-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMEGHA RBAGRAO
EngineerRAJESH THAKRE and ASSOCIATES
Chartered AccountantVikas N Gunjal & Associates Chartered Accountants
Chartered AccountantR H Pothiwal & Associates
PartnerRole in project
VINAYAK CONSTRUCTION-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Jul 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Jan 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Jan 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed72

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1_Mar 26.pdf20 Jun 2026
Withdrawal Update Form 2File: Form 2_Mar 26.pdf20 Jun 2026
Withdrawal Update Form 3File: CA Certificate_Mar 26.pdf20 Jun 2026
Withdrawal Update Form 1File: FORM 1 Dec 25.pdf20 Jan 2026
Withdrawal Update Form 2File: FORM 2 Dec 25.pdf20 Jan 2026
Withdrawal Update Form 3File: CA Certificate_Dec 2025_Vinayak Platina.pdf20 Jan 2026
Layout approvalFile: Plan Sheet No 1_rotated.pdf10 Jan 2026
Building plan approvalFile: Plan Sheet No 1_rotated.pdf10 Jan 2026
Building plan approvalFile: Plan Sheet No 2.pdf10 Jan 2026
Building plan approvalFile: Plan Sheet No 3-B.pdf10 Jan 2026
Building plan approvalFile: Plan Sheet No 4 CD.pdf10 Jan 2026
Building plan approvalFile: Plan Sheet No 5.pdf10 Jan 2026
Building plan approvalFile: Plan Sheet No 6.pdf10 Jan 2026
Withdrawal Update Form 1File: Form 1_June 25.pdf15 Dec 2025
Withdrawal Update Form 1File: Form 1_Sep 25.pdf15 Dec 2025
Withdrawal Update Form 2File: Form 2_June 25.pdf15 Dec 2025
Withdrawal Update Form 2File: Form 2_Sept 25.pdf15 Dec 2025
Withdrawal Update Form 3File: Form 3_June 25.pdf15 Dec 2025
Withdrawal Update Form 3File: CA Certificate_Sept 2025.pdf15 Dec 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Vinanyak Platina FORM 1 Architect Certificate September 24 1.pdf22 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Vinanyak Platina FORM 1 Architect Certificate December 24 1.pdf22 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Vinayak Platina Form 3 CA Certificate September 2024 1.pdf22 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Vinayak Platina FORM 3 CA Certificate 31st December24 1.pdf22 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Vinayak Platina FORM 2 Engineer Certificate Sept 2024 1.pdf22 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Vinanayk Platina FORM 2 Engineer Certificate December 24 1.pdf22 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf30 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf26 Jan 2025
Copy of the legal title reportFile: 2200 Title Revised And Final.pdf11 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DIN Pawan.pdf1 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DIN Ramuday.pdf1 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DIN Sanjay.pdf1 Jul 2024
Details of encumbrances concerned to FinanceFile: Encumbrance Finance.pdf30 Jun 2024
Details of encumbrances concerned to FinanceFile: Encumbrance Legal.pdf30 Jun 2024
Details of encumbrances concerned to LegalFile: Encumbrance Finance.pdf30 Jun 2024
Details of encumbrances concerned to LegalFile: Encumbrance Legal.pdf30 Jun 2024
Other - LegalFile: DocScanner Jun 29, 2024 5-25 PM.pdf30 Jun 2024
Other - LegalFile: Sathe Khat.pdf30 Jun 2024
Other - LegalFile: Sathe khat POA.pdf30 Jun 2024
Other - TechnicalFile: Order 50.pdf30 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 RERA Vinayak constructiion final.pdf15 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf15 Mar 2024
Other - FinanceFile: VINAYAK C REGN WITH FIRM DEED MANGAON .pdf2 Mar 2024
Layout approvalFile: HPSCANNER2057 - converted.pdf1 Mar 2024
Layout approvalFile: HPSCANNER2058 - converted.pdf1 Mar 2024
Layout approvalFile: HPSCANNER2059 - converted.pdf1 Mar 2024
Layout approvalFile: HPSCANNER2060 - converted.pdf1 Mar 2024
Layout approvalFile: HPSCANNER2061 - converted.pdf1 Mar 2024
Building plan approval or NA orderFile: NA Report 29 by 15 .pdf1 Mar 2024
Building plan approval or NA orderFile: NA report 65 by 3A.pdf1 Mar 2024
PAN CardFile: 1-Pan card firm .pdf1 Mar 2024
Copy of the legal title reportFile: 500 Title Revised And Final.pdf1 Mar 2024
Details of encumbrances concerned to FinanceFile: 3 and 4-Encumbrance certificate vinayak c Mangaon.pdf1 Mar 2024
Details of encumbrances concerned to LegalFile: 3 and 4-Encumbrance certificate vinayak c Mangaon.pdf1 Mar 2024
Copy of Layout Approval (in case of layout)File: HPSCANNER2057 - converted.pdf1 Mar 2024
Copy of Layout Approval (in case of layout)File: HPSCANNER2058 - converted.pdf1 Mar 2024
Copy of Layout Approval (in case of layout)File: HPSCANNER2059 - converted.pdf1 Mar 2024
Copy of Layout Approval (in case of layout)File: HPSCANNER2060 - converted.pdf1 Mar 2024
Copy of Layout Approval (in case of layout)File: HPSCANNER2061 - converted.pdf1 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: NA Report 29 by 15 .pdf1 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: NA report 65 by 3A.pdf1 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement certificate .pdf1 Mar 2024
Declaration about Commencement CertificateFile: 8-Declaration for - D.pdf1 Mar 2024
Declaration in FORM BFile: 9-Form B Affidavit cum declaration.pdf1 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect certificate.pdf1 Mar 2024
CERSAI detailsFile: 18-Cersai declaration .pdf1 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DIN Arun.pdf1 Mar 2024
Proforma of Allotment letterFile: Allotment Letter.pdf1 Mar 2024
Proforma of Agreement for saleFile: AFS.pdf1 Mar 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf1 Mar 2024
Deviation Report with respect to Allotment letterFile: Deviation Allotment.pdf1 Mar 2024
Deviation Report with respect to model copy of AgreementFile: Deviation AFS.pdf1 Mar 2024
Other - LegalFile: Vinayak Platina PD_11zon.pdf1 Mar 2024

How this compares with Thane

26%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VINAYAK PLATINA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VILL MANGAON7,600+ in Thane

2 kmVINAYAK PLATINACompleted 11Lapsed / revoked 7Other 35Dot size: filed unitsN

Filed coordinates, straight-line distance. 53 registered projects within 2 km.

Builder: VINAYAK CONSTRUCTION

VINAYAK CONSTRUCTION has 9 registrations on MahaRERA, including C VINAYAK INDUSTRIAL ESTATE and VINAYAK CONSTRUCTION. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if VINAYAK PLATINA is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VINAYAK PLATINA?

The registered promoter entity is VINAYAK CONSTRUCTION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VINAYAK PLATINA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VINAYAK PLATINA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VINAYAK PLATINA?

The professionals named in the filing: Architect: MEGHA RBAGRAO; Engineer: RAJESH THAKRE and ASSOCIATES; Chartered Accountant: Vikas N Gunjal & Associates Chartered Accountants; Chartered Accountant: R H Pothiwal & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VINAYAK PLATINA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VINAYAK PLATINA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VINAYAK PLATINA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.