ReraGenieLog inGet a buyer report

Home / Browse projects / Bhandara, Maharashtra / VIJAY HIBISCUS

Completed No litigation declared Others project

VIJAY HIBISCUS

By VIJAY NIKHAR

RG-MH-14763 · RERA P50600050512 · Last updated on MahaRERA portal: 24 Apr 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Bhandara registration emailed to you, free during the pilot beta.
Dec 2025Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Slabs of Super Structure, 6%
0Complaints at MahaRERAon this registration
Jump to the 79 documents Report an error

VIJAY HIBISCUS is a Others project by VIJAY NIKHAR in Bhandara, Maharashtra, registered with MahaRERA as P50600050512 on 17 Apr 2023. The registration is recorded completed; possession was promised by 31 Dec 2025.

At a glance

Project

  • NameVIJAY HIBISCUS
  • TypeOthers
  • Location
    • Naik Kothi Road
    • Lokwani Chowk
    • Bhandara (M Cl)
    • Bhandara
    • 441904
  • Pincode441904
  • RERA no.P50600050512
  • ReraGenie IDRG-MH-14763

Builder

  • NameVIJAY NIKHAR
  • Entity typeIndividual

Key dates

this monthRegisteredApr 2023PromisedDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on17 Apr 2023
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed79 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
VIJAY HIBISCUSNA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 6%.

VIJAY HIBISCUS: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure6%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 24 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed70

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots70
Open Space70

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area695 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI2036.63
Proposed, not sanctioned2,037 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBHANDARA

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectStudio North
EngineerVIRENDRA KATAKWAR
Chartered AccountantP G Tambau & Co
PartnerRole in project
VIJAY NIKHAR-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Jun 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Jun 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Mar 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Jun 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 19 Mar 2025

Documents filed79

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 03.pdf24 Apr 2025
Other - LegalFile: Parking_Status_March_2025.pdf19 Apr 2025
Other - LegalFile: QPR_March_2025.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: Booking_Status_March_2025.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Vijay_Hibiscus_Architect_Certificate.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Vijay_Hibiscus_Engineer_Certificate.pdf18 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Vijay_Hibiscus_Quality_Assurance_Certificate.pdf18 Apr 2025
Other - TechnicalFile: FORM-4.pdf26 Mar 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion_Certificate[1].pdf19 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3.pdf27 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Vijay_Hibiscus-_Architect_Certificate.pdf23 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Vijay_Hibiscus-_Engineer_Certificate.pdf23 Jan 2025
Other - LegalFile: ParkingStatusDec2024.pdf23 Jan 2025
Other - LegalFile: QPRdec2024.pdf23 Jan 2025
Disclosure of sold/ booked inventoryFile: BookingStatusDec2024.pdf23 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form-05 Vijay Hibiscus FY2023-24.pdf11 Nov 2024
Other - LegalFile: Parking_Status_Sept_2024.pdf2 Nov 2024
Other - LegalFile: QPR_Sept_2024.pdf2 Nov 2024
Disclosure of sold/ booked inventoryFile: Booking_Status_Sept_2024.pdf2 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-03 Vijay Hibiscus Sept 2024.pdf30 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Vijay_Hibiscus_Architect_Certificate.pdf23 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Vijay_Hibiscus_Engineer_Certificate.pdf23 Oct 2024
Disclosure of sold/ booked inventoryFile: Booking_Status_June__2024.pdf13 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_CERTIFICATE-_30-06-2024.pdf13 Aug 2024
Other - LegalFile: Parking_Status_June_2024.pdf13 Aug 2024
Other - LegalFile: QPR_June_2024.pdf13 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Vijay_Hibiscus_Architect_Certificate.pdf5 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Vijay_Hibiscus_Engineer_Certificate.pdf5 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Quality Assutance Certificate FY 2023-24.pdf14 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-03 March2024.pdf29 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form_-_1.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form_-_2.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: Booking_Status_March2024.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: Parking_Status_March2024.pdf20 Apr 2024
Other - LegalFile: QPR_March_2024.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: Booking Status Dec2023.pdf19 Jan 2024
Disclosure of sold/ booked inventoryFile: Parking Status Dec2023.pdf19 Jan 2024
Other - LegalFile: QPR Dec2023.pdf19 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-01.pdf18 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-02.pdf18 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-03.pdf18 Jan 2024
Disclosure of sold/ booked inventoryFile: Booking_Status_June-_2023.pdf6 Jan 2024
Disclosure of sold/ booked inventoryFile: Parking_Status_June_-_2023.pdf6 Jan 2024
Disclosure of sold/ booked inventoryFile: Booking_Status_Sept-2023.pdf6 Jan 2024
Disclosure of sold/ booked inventoryFile: Parking_Status_Sept-2023.pdf6 Jan 2024
Other - LegalFile: QPR_June_2023.pdf6 Jan 2024
Other - LegalFile: QPR_Sept-2023.pdf6 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-03 June 2023 CA Certificate.pdf24 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-03 Sept2023 CA Certificate.pdf24 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-01 June 2023Architect_Certificate.pdf13 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-01 Sept2023 Architect_Certificate.pdf13 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-02 June2023 Engineer_Certificate.pdf13 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Sept 2023Engineer_Certificate-3.pdf13 Nov 2023
Declaration about Commencement CertificateFile: Form-D 03-04-2023.pdf3 Apr 2023
Building plan approvalFile: Sanctioned_Map25-02-2022.pdf27 Mar 2023
Details of encumbrancesFile: Non Encumrance Report_compressed.pdf27 Mar 2023
Details of encumbrances concerned to FinanceFile: No Encumrance to Legal.pdf27 Mar 2023
Details of encumbrances concerned to FinanceFile: No Encumrance to Finance.pdf27 Mar 2023
Details of encumbrances concerned to LegalFile: No Encumrance to Legal.pdf27 Mar 2023
Details of encumbrances concerned to LegalFile: No Encumrance to Finance.pdf27 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: Sanctioned_Map25-02-2022.pdf27 Mar 2023
Declaration in FORM BFile: Form B Affidavit_compressed.pdf27 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-01 Registration.pdf27 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-02 Registration_compressed.pdf27 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-03 02-02-2023_compressed.pdf27 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Interest in Other Organisation.pdf27 Mar 2023
Proforma of Allotment letterFile: Allotment Letter_compressed.pdf27 Mar 2023
Proforma of Agreement for saleFile: Agreement to Sale - Building.pdf27 Mar 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A Separate Bank Account.pdf27 Mar 2023
Deviation Report with respect to Allotment letterFile: No Deviation Allotment Letter.pdf27 Mar 2023
Deviation Report with respect to model copy of AgreementFile: No Deviation Agreement to sale.pdf27 Mar 2023
Other - LegalFile: CREAI_MEMBERSHIP_CERTIFICATE.pdf27 Mar 2023
PAN CardFile: 1 PAN.pdf20 Dec 2022
Layout approvalFile: 2 Revised Sanctioned Map_compressed.pdf16 Jun 2022
Copy of the legal title reportFile: 1 Copy of the legal title report.pdf16 Jun 2022
Details of encumbrancesFile: 1 Details of encumbrances.pdf16 Jun 2022
Copy of Layout Approval (in case of layout)File: 2 Revised Sanctioned Map_compressed.pdf16 Jun 2022
Commencement Certificates / NA Order for plotted developmentFile: 1 Building Plan Approval _ NA Order for plotted development.pdf16 Jun 2022
CERSAI detailsFile: CERSAI Undertaking 28-03-2023.pdf16 Jun 2022

How this compares with Bhandara

22%of Bhandara projects moved their completion datethis one has not
44%of Bhandara registrations have lapsed or been cancelledthis one is completed

Computed across the 36 Bhandara projects on ReraGenie, from their own filings.

Keep VIJAY HIBISCUS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Lokwani Chowk36 in Bhandara

Builder: VIJAY NIKHAR

VIJAY NIKHAR has 1 registration on MahaRERA, including VIJAY HIBISCUS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Bhandara district page.

Frequently asked questions

What are my rights if VIJAY HIBISCUS is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VIJAY HIBISCUS?

The registered promoter entity is VIJAY NIKHAR, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VIJAY HIBISCUS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VIJAY HIBISCUS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VIJAY HIBISCUS?

The professionals named in the filing: Architect: Studio North; Engineer: VIRENDRA KATAKWAR; Chartered Accountant: P G Tambau & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VIJAY HIBISCUS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VIJAY HIBISCUS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VIJAY HIBISCUS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.