Registered No litigation declared Others project

Vicenza Residency/Commercial

By SSV BUILDERS AND DEVELOPERS PVT LTD

RG-MH-27096 · RERA P51800011517 · Last updated on MahaRERA portal: 15 Feb 2025

Source: official MahaRERA filing

Red flags

  • 15 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
0 of 77Construction stages doneacross 7 buildings; furthest along: Excavation, 80%
15Complaints at MahaRERAon this registration
Jump to the 103 documents Report an error

Vicenza Residency/Commercial is a Others project by SSV BUILDERS AND DEVELOPERS PVT LTD in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800011517 on 31 Aug 2017. Possession is promised by 1 Dec 2027. 15 complaints are on record with the regulator.

At a glance

Project

  • NameVicenza Residency/Commercial
  • TypeOthers
  • Location
    • MAHARASHTRA
    • THANE
    • Greater Mumbai (M Corp.) (Part) (802794)
    • Mumbai
    • Mumbai Suburban
    • 400083
  • Pincode400083
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800011517
  • ReraGenie IDRG-MH-27096

Builder

  • NameSSV BUILDERS AND DEVELOPERS PVT LTD
  • Entity typeCompany
  • ChairpersonHEMANT VINAYKANT PARIKH
  • Managing DirectorsAmi Vipul Parikh, Hemant Vinaykant Parikh

Key dates

this monthRegisteredAug 2017PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on31 Aug 2017
  • Promised completion1 Dec 2027
  • Revised completionNone
  • Buildings7 building records
  • Documents filed103 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Vicenza Residency/Commercial A to F WingNA400000
Sanjivani CHS-Residence-Commercial-Sale/Rehab- CompositeNA230000
Shankar CHS-Residence-Commercial-Sale/Rehab CompositeNA230000
Swami Samartha CHS-Residence-Commercial-Sale/Rehab CompositeNA230000
Hindustan CHS / Sai Nath CHS/Gulistan CHS -Residece-Commercial-Sale/Rehab CompositeNA230000
Saishradhha CHS/Delux CHS-Residence-Commercial -Sale/Rehab CompositeNA230000
Shiv Chatrapati CHS-Residence-Commercial-Sale/Rehab CompositeNA230000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building7

As on 15 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 77 construction stages are filed complete across 7 buildings. The stage furthest along is Excavation, at 80%.

Vicenza Residency/Commercial A to F Wing20%
ActivityProgress
Excavation80%
Basement (if any)50%
Podiums (if any)0%
Plinth50%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks5%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%
Sanjivani CHS-Residence-Commercial-Sale/Rehab- Composite0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Shankar CHS-Residence-Commercial-Sale/Rehab Composite0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Swami Samartha CHS-Residence-Commercial-Sale/Rehab Composite0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Hindustan CHS / Sai Nath CHS/Gulistan CHS -Residece-Commercial-Sale/Rehab Composite0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Saishradhha CHS/Delux CHS-Residence-Commercial -Sale/Rehab Composite0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Shiv Chatrapati CHS-Residence-Commercial-Sale/Rehab Composite0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 15 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes10%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes30%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes30%
Solid Waste Management And DisposalYes30%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes30%
Fire protection and fire safety requirementsYes30%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership8

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area20,575 sq m
Land owned byThe promoter, with other names on the file
Named landowners8
LandownerVillageDistrict
HPA Spaces Pvt LtdMumbai CityMumbai City
SSV Realtors Pvt LtdMumbai CityMumbai City
Shiv Chatrapati CHSMumbai CityMumbai City
Hindustan CHSMumbai CityMumbai City
Sanjivani CHSMumbai CityMumbai City
Shankar CHSMumbai CityMumbai City
Swami Samarth CHSMumbai CityMumbai City
Sai Shradhha CHSMumbai CityMumbai City

Approvals and building plan

Permissible FSI85787.0
Proposed, not sanctioned43,664 sq m
Buildings approved7
Buildings sanctioned7

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchTHANE 400602

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectHEMANT PARIKH & ASSOCIATES
EngineerMAHIMTURA CONSULTANTS PVT LTD ( Dinesh Mahimtura )
PartnerRole in project
SSV BUILDERS AND DEVELOPERS PVT LTD-

Litigation declared20

CaseCourtStatus
CC/16/417/2018STATE CONSUMER DISPUTES REDRESSAL COMMISSION MUMBACase disposed
CC/16/418/2018STATE CONSUMER DISPUTES REDRESSAL COMMISSION MUMBAICase disposed
CC/16/966/2018STATE CONSUMER DISPUTES REDRESSAL COMMISSION MUMBAICase disposed
CC/16/965/2018STATE CONSUMER DISPUTES REDRESSAL COMMISSION MUMBAICase disposed
100438/2018City Sessions Court MumbaiCase disposed
CC/17/327/2019STATE CONSUMER DISPUTES REDRESSAL COMMISSION MUMBAICase disposed
CC/17/139/2021STATE CONSUMER DISPUTES REDRESSAL COMMISSION MUMBAICase disposed
CC/16/1237/2021STATE CONSUMER DISPUTES REDRESSAL COMMISSION MUMBAICase disposed
CP IB - 4642/2019 /2019NCLTpending
EA/19/49 , EA/19/50, EA/19/51, EA/19/52 /2021STATE CONSUMER DISPUTES REDRESSAL COMMISSION MUMBAICase disposed
CC/247/2019/2019STATE CONSUMER DISPUTES REDRESSAL COMMISSION MUMBAICase disposed
CC/16/956/2020STATE CONSUMER DISPUTES REDRESSAL COMMISSION MUMBAICase disposed
CC/16/957/2020STATE CONSUMER DISPUTES REDRESSAL COMMISSION MUMBAICase disposed
CC/16/954/2020STATE CONSUMER DISPUTES REDRESSAL COMMISSION MUMBAICase disposed
CC/17/339/2019STATE CONSUMER DISPUTES REDRESSAL COMMISSION MUMBAICase disposed
CC/16/977/2020STATE CONSUMER DISPUTES REDRESSAL COMMISSION MUMBAICase disposed
CC/16/953/2020STATE CONSUMER DISPUTES REDRESSAL COMMISSION MUMBAICase disposed
CC/16/955/2020STATE CONSUMER DISPUTES REDRESSAL COMMISSION MUMBAICase disposed
CC/16/976/2016STATE CONSUMER DISPUTES REDRESSAL COMMISSION MUMBAICase disposed
CR 71/2018/2021ADDL CHIEF METROPOLITAN MAGISTRATE Esplanadebail

Complaints filed with MahaRERA15

Case no.ComplainantRespondentFiled
CC006000000000878Nikhil ChopraHemant Vinaykant Parikh29/09/2017
CC006000000001624FRANCISCA CARVALHOSSV BUILDERS & DEVELOPERS PVT. LTD.02/11/2017
CC006000000054661FRANCISCA CARVALHOSSV BUILDERS AND DEVELOPERS PVT. LTD.27/05/2018
CC006000000012419Vijay MishraHemant Vinaykant Parikh08/01/2018
CC006000000012735Joyson Richard AlbuquerqueJenninfer Albuquerque04/01/2018
CC006000000023013Sai Estate Consultants Chembur Pvt LtdSSV Builders and Developers Pvt Ltd19/01/2018
CC006000000023806Ravindran PalrajHemant Vinaykant parikh19/03/2018
CC006000000193824Ravindran PalrajHemant Vinayak Parikh24/08/2020
CC006000000078959Bharat N Shah and Rasila ShahSSV Developers and Builders18/04/2019
CC006000000078960Jigar Bharat MaishariSSV Developers and Builders18/04/2019
CC006000000078961Nilesh Dungarshi DedhiaSSV Developers and Builders18/04/2019
CC006000000090121Roland Pereira and Vanessa PereiraS S V Developers and Builders14/07/2019
CC006000000192366Vicenza Buyers Association ( Proposed )SSV Builders and Developers Pvt Ltd31/01/2020
CC006000000396018Puja SinhaSSV Developers & Builders Pvt. Ltd.,09/06/2023
CC12500310Wasim Akhtar SiddiquiSSV BUILDERS AND DEVELOPERS PVT LTD28/01/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Mar 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Feb 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 1 Dec 2027

Documents filed103

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 103 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of CA (Form 3)File: ITR_SSV Developers and Builders PVT LTD_compressed.pdf15 Feb 2025
Building plan approvalFile: new_submission_ssv_Developer_Mar_5__2024_6-44_PM.pdf14 Feb 2025
Details of encumbrances concerned to FinanceFile: S S V Developers Vol 1 1-207_compressed_compressed_compressed-76-145.pdf14 Feb 2025
Details of encumbrances concerned to FinanceFile: S S V Developers Vol 1 1-207_compressed_compressed_compressed-186-207.pdf14 Feb 2025
Details of encumbrances concerned to FinanceFile: S S V Developers Vol 1 1-207_compressed_compressed_compressed-146-185.pdf14 Feb 2025
Details of encumbrances concerned to FinanceFile: CIVIL WRIT PETITION NO 3328 OF 2021 - SSV DEVELOPER AND BUILDERS - HEMANT PAREKH_0001.pdf14 Feb 2025
Details of encumbrances concerned to FinanceFile: DISPATCH COPY OF SERVICE LETTER DATED 13 05 2024 - WRIT PETITION [L] NO 3328 OF 2021.pdf14 Feb 2025
Details of encumbrances concerned to FinanceFile: INTERIM APPLICATION NO 7214 OF 2024 IN CIVIL WRIT PETITION NO 3328 OF 2021 - SSV DEVELOPER14 Feb 2025
Details of encumbrances concerned to FinanceFile: S S V Developers Vol 1 1-207_compressed_compressed_compressed-1-75.pdf14 Feb 2025
Building Plan Approval (IOD)File: new_submission_ssv_Developer_Mar_5__2024_6-44_PM.pdf14 Feb 2025
Details of encumbrances concerned to LegalFile: S S V Developers Vol 1 1-207_compressed_compressed_compressed-1-75.pdf14 Feb 2025
Details of encumbrances concerned to LegalFile: S S V Developers Vol 1 1-207_compressed_compressed_compressed-76-145.pdf14 Feb 2025
Details of encumbrances concerned to LegalFile: S S V Developers Vol 1 1-207_compressed_compressed_compressed-186-207.pdf14 Feb 2025
Details of encumbrances concerned to LegalFile: S S V Developers Vol 1 1-207_compressed_compressed_compressed-146-185.pdf14 Feb 2025
Details of encumbrances concerned to LegalFile: CIVIL WRIT PETITION NO 3328 OF 2021 - SSV DEVELOPER AND BUILDERS - HEMANT PAREKH_0001.pdf14 Feb 2025
Details of encumbrances concerned to LegalFile: DISPATCH COPY OF SERVICE LETTER DATED 13 05 2024 - WRIT PETITION [L] NO 3328 OF 2021.pdf14 Feb 2025
Details of encumbrances concerned to LegalFile: INTERIM APPLICATION NO 7214 OF 2024 IN CIVIL WRIT PETITION NO 3328 OF 2021 - SSV DEVELOPER14 Feb 2025
Certificates of CA (Form 3)File: balancesheet n profit loss 2024.pdf9 Feb 2025
Certificates of CA (Form 5)File: vicenza FORM 5.pdf26 Feb 2024
Disclosure of sold/ booked inventoryFile: attachment 1-2.pdf22 Mar 2023
Details of encumbrances concerned to FinanceFile: before apex 2017.pdf19 Mar 2023
Details of encumbrances concerned to FinanceFile: before apex 2020.pdf19 Mar 2023
Details of encumbrances concerned to FinanceFile: writ petition.pdf19 Mar 2023
Details of encumbrances concerned to FinanceFile: DoE.pdf19 Mar 2023
Details of encumbrances concerned to FinanceFile: EOW bail order.pdf19 Mar 2023
Details of encumbrances concerned to LegalFile: before apex 2017.pdf19 Mar 2023
Details of encumbrances concerned to LegalFile: before apex 2020.pdf19 Mar 2023
Details of encumbrances concerned to LegalFile: writ petition.pdf19 Mar 2023
Details of encumbrances concerned to LegalFile: DoE.pdf19 Mar 2023
Details of encumbrances concerned to LegalFile: EOW bail order.pdf19 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: (Form 1)(Mandatory for only ongoing project) 2018.pdf19 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: (Form 1)(Mandatory for only ongoing project) 2019.pdf19 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: (Form 1)(Mandatory for only ongoing project) 2020.pdf19 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: (Form 1)(Mandatory for only ongoing project) 2022.pdf19 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: (Form 1)(Mandatory for only ongoing project) 2021.pdf19 Mar 2023
Disclosure of sold/ booked inventoryFile: Booking list.pdf19 Mar 2023
Certificates of CA (Form 3)File: ITR- FORM- SSV DEVELOPERS AND BUILDERS PVT LTD -2020.pdf16 Mar 2023
Certificates of CA (Form 5)File: form 5 19-20.pdf16 Mar 2023
Certificates of CA (Form 5)File: form 5 21-22.pdf16 Mar 2023
Certificates of CA (Form 3)File: form 3 vicenza ay 21 22.pdf29 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form1 vicenza.pdf20 Jan 2023
Certificates of CA (Form 3)File: form 3 Form_pdf_830974360311221_compressed.pdf20 Jan 2023
Certificates of CA (Form 3)File: form 3 ITR6_compressed.pdf20 Jan 2023
Details of encumbrances concerned to FinanceFile: acquisition letter hindustan.pdf7 Jan 2023
Details of encumbrances concerned to FinanceFile: written submission aqusition.pdf7 Jan 2023
Details of encumbrances concerned to FinanceFile: IMG_2310.pdf7 Jan 2023
Details of encumbrances concerned to LegalFile: acquisition letter hindustan.pdf7 Jan 2023
Details of encumbrances concerned to LegalFile: written submission aqusition.pdf7 Jan 2023
Details of encumbrances concerned to LegalFile: IMG_2310.pdf7 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: form 5 vicenza fy 21 22.pdf9 Dec 2022
Building plan approvalFile: vicenza approval.pdf26 Mar 2022
Building Plan Approval (IOD)File: vicenza approval.pdf26 Mar 2022
Building plan approvalFile: Hindustan_chs__Application_For_revised_loi.pdf17 Mar 2022
Layout approvalFile: Vighnahar___Sai_Dham_CHS_Ltd-Model.pdf17 Mar 2022
Copy of Layout Approval (in case of layout)File: Vighnahar___Sai_Dham_CHS_Ltd-Model.pdf17 Mar 2022
Building Plan Approval (IOD)File: Hindustan_chs__Application_For_revised_loi.pdf17 Mar 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form no 5 20-21 Annual audit report.pdf14 Mar 2022
OtherFile: IOB Letter_compressed.pdf6 Mar 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf6 Dec 2020
Certificates of CA (Form 5)File: FORM 5 2018-19.pdf6 Dec 2020
Certificates of CA (Form 5)File: FORM 5 2019-20.pdf6 Dec 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: ITR 3 FORM 2018-2019.pdf6 Dec 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: ITR FORM SSV DEVELOPERS 2018-2019.pdf6 Dec 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: ITR V HEMANTA VINAYAK PARIKH 2018-2019.pdf6 Dec 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: ITR V SSV DEVELOPERS 2018-2019.pdf6 Dec 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: ITR3 Form ( Hemant Parikh).pdf6 Dec 2020
OtherFile: ami_resign.pdf6 Dec 2020
Certificates of CA (Form 3)File: ITR3 Form ( Hemant Parikh).pdf5 Dec 2020
OtherFile: news.pdf5 Dec 2020
OtherFile: vicenza_compressed.pdf2 Nov 2020
OtherFile: 2 Draft SSV 9 Societies Writ Petition copy.pdf2 Nov 2020
Certificates of CA (Form 5)File: Form5 Vicenza.pdf25 Jul 2019
OtherFile: annual report on statement.pdf27 May 2019
Certificates of CA (Form 3)File: ITR V SSV DEVELOPERS.pdf25 May 2019
Certificates of CA (Form 3)File: ITR FORM SSV DEVELOPERS.pdf25 May 2019
OtherFile: vicenza.pdf25 May 2019
OtherFile: vicenza.pdf25 May 2019
OtherFile: SSVPL- Hindustan- Minutes of Decision.pdf19 May 2018
Certificates of CA (Form 3)File: FORM NO- 3 CA.pdf10 Feb 2018
OtherFile: LEGAL HINDUSTAN SRA ACK.pdf30 Dec 2017

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Vicenza Residency/Commercial on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near THANE6,700+ in Mumbai Suburban

2 kmVicenza Residency/CommerCompleted 41Lapsed / revoked 30Other 104Dot size: filed unitsN

Filed coordinates, straight-line distance. 175 registered projects within 2 km.

Builder: SSV BUILDERS AND DEVELOPERS PVT LTD

SSV BUILDERS AND DEVELOPERS PVT LTD has 1 registration on MahaRERA, including Vicenza Residency/Commercial. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Vicenza Residency/Commercial is delayed beyond 1 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Vicenza Residency/Commercial?

The registered promoter entity is SSV BUILDERS AND DEVELOPERS PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Vicenza Residency/Commercial?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Vicenza Residency/Commercial?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Vicenza Residency/Commercial?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Vicenza Residency/Commercial?

The professionals named in the filing: Architect: HEMANT PARIKH & ASSOCIATES; Engineer: MAHIMTURA CONSULTANTS PVT LTD ( Dinesh Mahimtura ). Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Vicenza Residency/Commercial?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Vicenza Residency/Commercial. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Vicenza Residency/Commercial to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.