Home / Browse projects / Bengaluru Urban, Karnataka / Vertex Wellington

Registration approved No litigation declared Residential/Group Housing project

Vertex Wellington

By VERTEX INFRAS

RG-KA-23266 · RERA PRM/KA/RERA/1251/310/PR/270723/006096 · Last updated on RERA Karnataka portal: 20 Jul 2023

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Dec 2025Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 120 documents Report an error

Vertex Wellington is a Residential/Group Housing project by VERTEX INFRAS in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/270723/006096 on 27 Jul 2023. Possession is promised by 1 Dec 2025.

At a glance

Project

  • NameVertex Wellington
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/310/PR/270723/006096
  • ReraGenie IDRG-KA-23266

Builder

  • NameVERTEX INFRAS
  • Entity typePartnership Firm
  • GSTIN29AAFFV8279H1ZF
  • Authorized SignatoryK PRADEEP KUMAR REDDY

Key dates

this monthRegisteredJul 2023PromisedDec 2025

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on27 Jul 2023
  • Promised completion1 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed120 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Vertex Wellington---32032

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 20 Jul 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)Not applicable
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

As on 20 Jul 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalYes-
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationYes-
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupYes-
Piped GasNoNot applicable
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahNoNot applicable
BasementNoNot applicable
TerraceNoNot applicable
Outer WallYes-
Open parking areasYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership3

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Named landowners3
LandownerVillageDistrict
N KRISHNA MURTHY--
G B SAVITHA--
G M MAHESH KUMAR--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 7.17 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 6.89 cr-
Administrative costRs 10.00 lakh-
Interest on BorrowingRs 10.00 lakh-
Payment of taxesRs 8.00 lakh-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectANIL KUMAR J
EngineerVenkatesh Babu Reddy K
Chartered AccountantN Venkataramana

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed120

As listed on the registration, under the names the promoter filed them with; the newest 80 of 120 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/270723/006096 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certified Carpet AreaFile: Certified Carpet Area.pdf20 Jul 2023
Single Layout Plan DeclarationFile: Single Layout Plan Declaration.pdf20 Jul 2023
Single Plot Layout Order DeclarationFile: Single Plot Layout Order Declaration.pdf20 Jul 2023
Certified Carpet AreaFile: Certified Carpet Area.PDF7 Jul 2023
Single Plot Layout DeclarationFile: Single Plot Layout Declaration.pdf7 Jul 2023
Single Plot Layout Order DeclarationFile: Single Plot Layout Order Declaration.pdf7 Jul 2023
JDAFile: 1 JDA.pdf16 Jun 2023
GPAFile: 1 GPA.pdf16 Jun 2023
Certified Carpet AreaFile: 2 Certified Carpet Area.PDF16 Jun 2023
Proforma of AOSFile: 1 Proforma of AOS.pdf18 May 2023
Certified Carpet AreaFile: 2 Certified Carpet Area.PDF18 May 2023
Single plot Layout OrderFile: 3 Single plot Layout Order.PDF18 May 2023
Single plot Layout PlanFile: 4 Single plot Layout Plan.PDF18 May 2023
Abstract of EstimateFile: Abstract of Estimate.pdf30 Mar 2023
Certified Carpet AreaFile: Certified Carpet Area.PDF30 Mar 2023
Proforma of AOSFile: Proforma of AOS.pdf30 Mar 2023
Single plot Layout OrderFile: Single plot Layout Order.PDF30 Mar 2023
Single plot Layout PlanFile: Single plot Layout Plan.PDF30 Mar 2023
Source of Fund with Supporting DocFile: Source of Fund with Supporting Doc.pdf30 Mar 2023
Financials 2019 20 with SchedulesFile: Financials 2019 20 with Schedules.pdf30 Mar 2023
Financials 2020 21 with SchedulesFile: Financials 2020 21 with Schedules.pdf30 Mar 2023
Financials 2021 22 with SchedulesFile: Financials 2021 22 with Schedules.pdf30 Mar 2023
Form 1 CA CertificateFile: Form 1 CA Certificate.pdf30 Mar 2023
Form 2 Architect CertificateFile: Form 2 Architect Certificate.pdf30 Mar 2023
RTC, survey 17/3-
Mutation, survey 17/3-
Encumbrance Certificate, survey 17/3-
Conversion/Alienation Order, survey 17/3-
Sale/Title/Gift Deed, survey 17/3-
JDA, survey 17/3-
Khatha, survey 17/3-
RTC, survey 17/5-
Mutation, survey 17/5-
Encumbrance Certificate, survey 17/5-
Conversion/Alienation Order, survey 17/5-
Sale/Title/Gift Deed, survey 17/5-
JDA, survey 17/5-
Khatha, survey 17/5-
RTC, survey 17/6-
Mutation, survey 17/6-
Encumbrance Certificate, survey 17/6-
Conversion/Alienation Order, survey 17/6-
Sale/Title/Gift Deed, survey 17/6-
JDA, survey 17/6-
Khatha, survey 17/6-
Registration CertificateFile: Firm Certificate.pdf-
Partnership DeedFile: Partnership Deed.pdf-
Partner Details-
Partner Details-
Certificate issued by CA Form 1File: Form 1 CA Certificate.pdf-
Certificate issued by Architect Form 2File: Form 2 Architect Certificate.pdf-
Certificate issued by Engineer Form 3File: Form 3 Engineer.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: Non-Litigation.pdf-
Certificate from Chartered AccountFile: Form 1 CA Certificate.pdf-
Balance Sheet 2021 - 2022File: BS.pdf-
Balance Sheet 2020 - 2021File: BS.pdf-
Balance Sheet 2019 - 2020File: BS.pdf-
Audited Profit and Loss Statement 2021 - 2022File: PL.pdf-
Audited Profit and Loss Statement 2020 - 2021File: P & L.pdf-
Audited Profit and Loss Statement 2019 - 2020File: P & L.pdf-
Income Tax Return Acknowledgement 2021 - 2022File: ITR.pdf-
Income Tax Return Acknowledgement 2020 - 2021File: ITR.pdf-
Income Tax Return Acknowledgement 2019 - 2020File: ITR.pdf-
Building License-
BESCOM NOC with Fee Receipt-
BWSSB Noc with Fee Receipt-
Approved Building Plan-
Section Plan with Specification-
Approved Building Plan-
Project Specification-
Structural Stability-
Advocate Search Report-
JDA-
Conversion Certi-
Conversion Certi-
Proform of AOS-
Allotment Letter-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Vertex Wellington on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: VERTEX INFRAS

VERTEX INFRAS has 1 registration on RERA Karnataka, including Vertex Wellington. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Vertex Wellington is delayed beyond 1 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Vertex Wellington?

The registered promoter entity is VERTEX INFRAS, a partnership firm as per the filing. Its GSTIN 29AAFFV8279H1ZF can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Vertex Wellington?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Vertex Wellington?

The professionals named in the filing: Architect: ANIL KUMAR J; Engineer: Venkatesh Babu Reddy K; Chartered Accountant: N Venkataramana. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Vertex Wellington?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Vertex Wellington. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Vertex Wellington to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.